[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1154756":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1154756,806,1,"单选题","在考核的程序中应建立考核的组织机构，一般对项目负责人的考核可建立以( )为组长，公司领导班子成员及人力资源部负责人为成员的考核领导小组。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","公司负责人",true,{"key":16,"text":17,"correct":18},"B","项目机构负责人",false,{"key":20,"text":21,"correct":18},"C","相关部门负责人",{"key":23,"text":24,"correct":18},"D","人力资源部负责人","",{"id":6,"name":27,"category":28,"favorite":29},"物业管理实务","建筑工程",0]