[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1154509":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1154509,806,1,"单选题","物业管理机构更迭时管理工作移交，如承接的部分物业项目还在保修期内，承接单位应与建设单位、移交单位共同签订()。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","保修协议",false,{"key":16,"text":17,"correct":14},"B","验收协议",{"key":19,"text":20,"correct":14},"C","移交清单",{"key":22,"text":23,"correct":24},"D","移交协议",true,"如承接的部分物业项目还在保修期内，承接单位应与建设单位、移交单位共同签订移交协议，明确具体的保修项目、负责保修的单位及联络方式、保修方面遗留问题的处理情况，并在必要时提供原施工或采购合同中关于保修的相关条款文本。",{"id":6,"name":27,"category":28,"favorite":29},"物业管理实务","建筑工程",0]