[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1153942":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1153942,805,1,"单选题","建设工程工期不足一年的，申领施工许可证时到位资金原则上不得少于工程合同价的()。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","20%",false,{"key":16,"text":17,"correct":14},"B","25%",{"key":19,"text":20,"correct":14},"C","30%",{"key":22,"text":23,"correct":24},"D","50%",true,"建设工期不足一年的，到位资金原则上不得少于工程合同价的50%，建设工期超过一年的，到位资金原则上不得少于工程合同价的30%。建设单位应当提供银行出具的到位资金证明，有条件的可以实行银行付款保函或者其他第三方担保。",{"id":6,"name":27,"category":28,"favorite":29},"物业管理基本制度与政策","建筑工程",0]