[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1153939":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1153939,805,1,"单选题","下列关于建设监理制度的说法有误的是()。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","工程进度控制是项目实施阶段（包括设计准备、设计、施工、使用前准备备阶段）的进度控制",false,{"key":16,"text":17,"correct":18},"B","合同管理是建设监理能否成功的关键",true,{"key":20,"text":21,"correct":14},"C","信息流程结构图是信息管理的内容",{"key":23,"text":24,"correct":14},"D","项目投资控制的目标是使该项目的实际投资小于或等于该项目的计划投资","协调，是建设监理能否成功的关键，可分为内部协调和外部协调。内部协调主要是工程项目系统内部人员、组织关系、各种需求的协调，外部协调包括与业主有合同关系的施工单位、设计单位的协调和业主没有合同关系的政府有关部门、社会团体及人员的协调。",{"id":6,"name":27,"category":28,"favorite":29},"物业管理基本制度与政策","建筑工程",0]