[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1153538":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1153538,805,1,"单选题","业主或物业服务企业临时占用、挖掘道路、场地的，均应当在约定期限内()。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","恢复原状",true,{"key":16,"text":17,"correct":18},"B","赔偿损失",false,{"key":20,"text":21,"correct":18},"C","赔礼道歉",{"key":23,"text":24,"correct":18},"D","公告声明","物业管理企业因维修物业或者公共利益需要确需临时占用、挖掘道路、场地的，也必须征得业主委员会的同意，不得擅自施工。无论业主或物业管理企业临时占用、挖掘道路、场地，均应当在约定期限内恢复原状。",{"id":6,"name":27,"category":28,"favorite":29},"物业管理基本制度与政策","建筑工程",0]