[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1153429":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1153429,804,2,"多选题","微波设备搬迁前应制定详细的搬迁计划、申请停电路时间，提前做好新机房的（）准备工作。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","天馈线系统",true,{"key":16,"text":17,"correct":14},"B","电源系统",{"key":19,"text":20,"correct":14},"C","走线架安装",{"key":22,"text":23,"correct":14},"D","线缆的布放",{"key":25,"text":26,"correct":27},"E","通道主要指标测试",false,"ABCD","2020版教材页码P96-100 在用设备搬迁、换装前应制定详细的搬迁、换装计划，报建设单位审批，申请停电路时间，提前做好新机房的天馈线系统、电源系统、走线架及线缆的布放准备工作。",{"id":6,"name":31,"category":32,"favorite":33},"一建通信与广电工程实务","建筑工程",0]