[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1153140":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1153140,804,2,"多选题","通信工程建设项目中的环境影响防护对策，应与工程建设( )，执行“三同时制度”。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","同时设计",true,{"key":16,"text":17,"correct":18},"B","同时计划",false,{"key":20,"text":21,"correct":14},"C","同时施工",{"key":23,"text":24,"correct":18},"D","同时监理",{"key":26,"text":27,"correct":14},"E","同时验收投产使用","ACE","",{"id":6,"name":31,"category":32,"favorite":33},"一建通信与广电工程实务","建筑工程",0]