[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1152492":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1152492,804,1,"单选题","需要安装的一列设备有多个机架时，应先安装( )。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","列头机架",true,{"key":16,"text":17,"correct":18},"B","列中机架",false,{"key":20,"text":21,"correct":18},"C","列尾机架",{"key":23,"text":24,"correct":18},"D","都可以","一列有多个机架时，应先安装列头首架，然后依次安装其余各机架，整列机架前后允许偏差为3mm ，机架之间的缝隙上下应均匀一致。",{"id":6,"name":27,"category":28,"favorite":29},"一建通信与广电工程实务","建筑工程",0]