[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-803-8":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":597},{"id":5,"name":6,"category":7,"favorite":8},803,"一建水利水电工程实务","建筑工程",0,8,50,1981,[13,34,46,58,70,82,92,104,116,128,140,152,162,174,183,195,207,219,231,243,255,267,278,290,302,314,326,338,350,362,374,386,398,410,422,433,444,456,468,480,490,501,512,524,534,542,551,563,575,587],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},1150354,1,"单选题","基坑明排法降水适用于基坑地下水位超出基础底板或洞底标高不大于（ ）m。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","1",false,{"key":24,"text":25,"correct":26},"B","2",true,{"key":28,"text":29,"correct":22},"C","3",{"key":31,"text":32,"correct":22},"D","5","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},1150355,"根据《水利水电工程等级划分及洪水标准》（SL252-2017），某水库设计灌溉面积为120万亩，则此水库的工程等别至少应为（ ）等。",[38,40,42,44],{"key":20,"text":39,"correct":26},"Ⅱ",{"key":24,"text":41,"correct":22},"Ⅲ",{"key":28,"text":43,"correct":22},"Ⅳ",{"key":31,"text":45,"correct":22},"Ⅴ",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":20,"analysis":33},1150356,"水利水电工程的永久性次要建筑物的级别，划分为（ ）级。",[50,52,54,56],{"key":20,"text":51,"correct":26},"三",{"key":24,"text":53,"correct":22},"四",{"key":28,"text":55,"correct":22},"五",{"key":31,"text":57,"correct":22},"六",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":24,"analysis":33},1150357,"某水利工程浆砌石围堰级别为4级，相应围堰洪水标准应为（ ）年一遇。",[62,64,66,68],{"key":20,"text":63,"correct":22},"5～3",{"key":24,"text":65,"correct":26},"10～5",{"key":28,"text":67,"correct":22},"20～10",{"key":31,"text":69,"correct":22},"50～20",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":20,"analysis":33},1150358,"（ ）是确定大坝顶高程及进行大坝安全校核的主要依据。",[74,76,78,80],{"key":20,"text":75,"correct":26},"校核洪水位",{"key":24,"text":77,"correct":22},"设计洪水位",{"key":28,"text":79,"correct":22},"防洪高水位",{"key":31,"text":81,"correct":22},"死水位",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":28,"analysis":33},1150359,"水库遇下游保护对象的设计洪水时在坝前达到的最高水位，称为（ ）。",[86,88,89,90],{"key":20,"text":87,"correct":22},"防洪限制水位",{"key":24,"text":77,"correct":22},{"key":28,"text":79,"correct":26},{"key":31,"text":91,"correct":22},"正常高水位",{"id":93,"libraryId":5,"type":15,"typeLabel":16,"stem":94,"options":95,"answer":24,"analysis":33},1150360,"（ ），是指校核洪水位至防洪限制水位之间的水库容积。用以保证下游防洪安全（指其中的防洪库容部分）及对校核洪水调洪削峰，保证大坝安全。",[96,98,100,102],{"key":20,"text":97,"correct":22},"垫底库容",{"key":24,"text":99,"correct":26},"调洪库容",{"key":28,"text":101,"correct":22},"兴利库容",{"key":31,"text":103,"correct":22},"重叠库容",{"id":105,"libraryId":5,"type":15,"typeLabel":16,"stem":106,"options":107,"answer":20,"analysis":33},1150361,"以下属于临时性水工建筑物的是（ ）。",[108,110,112,114],{"key":20,"text":109,"correct":26},"围堰",{"key":24,"text":111,"correct":22},"挡水大坝",{"key":28,"text":113,"correct":22},"电站厂房",{"key":31,"text":115,"correct":22},"导流墙",{"id":117,"libraryId":5,"type":15,"typeLabel":16,"stem":118,"options":119,"answer":31,"analysis":33},1150362,"以下属于水工建筑物可变作用荷载的是（ ）。",[120,122,124,126],{"key":20,"text":121,"correct":22},"结构自重",{"key":24,"text":123,"correct":22},"设备自重",{"key":28,"text":125,"correct":22},"预应力",{"key":31,"text":127,"correct":26},"静水压力",{"id":129,"libraryId":5,"type":15,"typeLabel":16,"stem":130,"options":131,"answer":28,"analysis":33},1150363,"建筑材料中，混凝土按功能分类属于（ ）。",[132,134,136,138],{"key":20,"text":133,"correct":22},"隔热保温材料",{"key":24,"text":135,"correct":22},"防水材料",{"key":28,"text":137,"correct":26},"胶凝材料",{"key":31,"text":139,"correct":22},"防护材料",{"id":141,"libraryId":5,"type":15,"typeLabel":16,"stem":142,"options":143,"answer":20,"analysis":33},1150364,"水利水电工程中，一般情况下，滑坡、高边坡稳定监测采用（ ）。",[144,146,148,150],{"key":20,"text":145,"correct":26},"交会法",{"key":24,"text":147,"correct":22},"小角度法",{"key":28,"text":149,"correct":22},"水准观测法",{"key":31,"text":151,"correct":22},"光电测距三角高程法",{"id":153,"libraryId":5,"type":15,"typeLabel":16,"stem":154,"options":155,"answer":24,"analysis":33},1150365,"土坝在坝壳填筑过程中，每上料（ ）层，须进行一次边线测量并绘成图表为竣工时备用。",[156,158,160,161],{"key":20,"text":157,"correct":22},"一",{"key":24,"text":159,"correct":26},"二",{"key":28,"text":51,"correct":22},{"key":31,"text":53,"correct":22},{"id":163,"libraryId":5,"type":15,"typeLabel":16,"stem":164,"options":165,"answer":31,"analysis":33},1150366,"断裂构造不包括（ ）。",[166,168,170,172],{"key":20,"text":167,"correct":22},"节理",{"key":24,"text":169,"correct":22},"劈理",{"key":28,"text":171,"correct":22},"断层",{"key":31,"text":173,"correct":26},"向斜",{"id":175,"libraryId":5,"type":15,"typeLabel":16,"stem":176,"options":177,"answer":24,"analysis":33},1150367,"《水利水电工程等级划分及洪水标准》（SL252-2017）规定，水利水电工程根据其工程规模、效益以及在国民经济中的重要性，划分为（ ）等。",[178,179,180,181],{"key":20,"text":53,"correct":22},{"key":24,"text":55,"correct":26},{"key":28,"text":57,"correct":22},{"key":31,"text":182,"correct":22},"七",{"id":184,"libraryId":5,"type":15,"typeLabel":16,"stem":185,"options":186,"answer":28,"analysis":33},1150368,"穿堤水工建筑物的级别，按其（ ）确定。",[187,189,191,193],{"key":20,"text":188,"correct":22},"所在堤防的级别",{"key":24,"text":190,"correct":22},"与建筑物规模相应的级别",{"key":28,"text":192,"correct":26},"A与B的最高级别",{"key":31,"text":194,"correct":22},"A与B的最低级别",{"id":196,"libraryId":5,"type":15,"typeLabel":16,"stem":197,"options":198,"answer":24,"analysis":33},1150369,"（ ）是指某一地区地面和各类建筑物遭受一次地震影响的强弱程度。",[199,201,203,205],{"key":20,"text":200,"correct":22},"地震震级",{"key":24,"text":202,"correct":26},"地震烈度",{"key":28,"text":204,"correct":22},"地震荷载",{"key":31,"text":206,"correct":22},"地震强度",{"id":208,"libraryId":5,"type":15,"typeLabel":16,"stem":209,"options":210,"answer":24,"analysis":33},1150370,"某水闸底板混凝土所用砂的细度模数为2.6，该砂属于（ ）砂。",[211,213,215,217],{"key":20,"text":212,"correct":22},"粗",{"key":24,"text":214,"correct":26},"中",{"key":28,"text":216,"correct":22},"细",{"key":31,"text":218,"correct":22},"特细",{"id":220,"libraryId":5,"type":15,"typeLabel":16,"stem":221,"options":222,"answer":28,"analysis":33},1150371,"下列岩石中，属于变质岩的是（ ）。",[223,225,227,229],{"key":20,"text":224,"correct":22},"花岗岩",{"key":24,"text":226,"correct":22},"石灰岩",{"key":28,"text":228,"correct":26},"石英岩",{"key":31,"text":230,"correct":22},"砂岩",{"id":232,"libraryId":5,"type":15,"typeLabel":16,"stem":233,"options":234,"answer":24,"analysis":33},1150372,"在渗透系数测定实验中，实测的流量为Q、通过渗流的土样横断面积为 A、通过渗流的土样高度为L、实测的水头损失为H。则对于土体的渗透系数k，相关参数关系为（ ）。 A.与Q.A成正比，与L.H成反比 B.与Q.L成正比，与",[235,237,239,241],{"key":20,"text":236,"correct":22},"H成反比",{"key":24,"text":238,"correct":26},"与Q.H成正比，与L.A成反比",{"key":28,"text":240,"correct":22},"与",{"key":31,"text":242,"correct":22},"L成正比，与Q.H成反比",{"id":244,"libraryId":5,"type":15,"typeLabel":16,"stem":245,"options":246,"answer":24,"analysis":33},1150373,"某水利水电枢纽工程，工程情况为坚硬岩基上的高、中坝，该工程泄流的消能方式宜采用（ ）。",[247,249,251,253],{"key":20,"text":248,"correct":22},"底流消能",{"key":24,"text":250,"correct":26},"挑流消能",{"key":28,"text":252,"correct":22},"面流消能",{"key":31,"text":254,"correct":22},"消力戽消能",{"id":256,"libraryId":5,"type":15,"typeLabel":16,"stem":257,"options":258,"answer":20,"analysis":33},1150374,"下列选项中，不能改善混凝土耐久性的外加剂是（ ）。",[259,261,263,265],{"key":20,"text":260,"correct":26},"早强剂",{"key":24,"text":262,"correct":22},"防水剂",{"key":28,"text":264,"correct":22},"阻锈剂",{"key":31,"text":266,"correct":22},"引气剂",{"id":268,"libraryId":5,"type":15,"typeLabel":16,"stem":269,"options":270,"answer":28,"analysis":33},1150375,"（ ）是指水流流速和方向改变，对建筑物过流面所产生的压力。",[271,272,274,276],{"key":20,"text":127,"correct":22},{"key":24,"text":273,"correct":22},"扬压力",{"key":28,"text":275,"correct":26},"动水压力",{"key":31,"text":277,"correct":22},"浪压力",{"id":279,"libraryId":5,"type":15,"typeLabel":16,"stem":280,"options":281,"answer":31,"analysis":33},1150376,"闸后、跌水、泄水、水轮机中的水流均为（ ）。",[282,284,286,288],{"key":20,"text":283,"correct":22},"均匀流",{"key":24,"text":285,"correct":22},"渐变流",{"key":28,"text":287,"correct":22},"层流",{"key":31,"text":289,"correct":26},"紊流",{"id":291,"libraryId":5,"type":15,"typeLabel":16,"stem":292,"options":293,"answer":28,"analysis":33},1150377,"可以计算面积的仪器是（ ）。",[294,296,298,300],{"key":20,"text":295,"correct":22},"水准仪",{"key":24,"text":297,"correct":22},"经纬仪",{"key":28,"text":299,"correct":26},"全站仪",{"key":31,"text":301,"correct":22},"GPS",{"id":303,"libraryId":5,"type":15,"typeLabel":16,"stem":304,"options":305,"answer":28,"analysis":33},1150378,"下列地形图数字比例尺中，属于中比例尺的是（ ）。",[306,308,310,312],{"key":20,"text":307,"correct":22},"1:500",{"key":24,"text":309,"correct":22},"1:5000",{"key":28,"text":311,"correct":26},"1:50000",{"key":31,"text":313,"correct":22},"1:500000",{"id":315,"libraryId":5,"type":15,"typeLabel":16,"stem":316,"options":317,"answer":24,"analysis":33},1150379,"可行性研究报告批准后，如在主要内容上有重要变动，应经过（ ）复审同意",[318,320,322,324],{"key":20,"text":319,"correct":22},"总设计单位",{"key":24,"text":321,"correct":26},"原批准机关",{"key":28,"text":323,"correct":22},"项目主管部门",{"key":31,"text":325,"correct":22},"项目法人",{"id":327,"libraryId":5,"type":15,"typeLabel":16,"stem":328,"options":329,"answer":28,"analysis":33},1150380,"以下不属于水利工程主体工程开工条件的是（ ）。",[330,332,334,336],{"key":20,"text":331,"correct":22},"项目法人已经设立",{"key":24,"text":333,"correct":22},"建设资金已经落实",{"key":28,"text":335,"correct":26},"主要材料已经采购进场",{"key":31,"text":337,"correct":22},"初步设计已经批准",{"id":339,"libraryId":5,"type":15,"typeLabel":16,"stem":340,"options":341,"answer":31,"analysis":33},1150381,"以下关于重大设计变更的说法中，正确的是（ ）。",[342,344,346,348],{"key":20,"text":343,"correct":22},"由项目法人确认",{"key":24,"text":345,"correct":22},"报项目主管部门核备",{"key":28,"text":347,"correct":22},"必要时报项目主管部门审批",{"key":31,"text":349,"correct":26},"报原初步设计审批部门审批",{"id":351,"libraryId":5,"type":15,"typeLabel":16,"stem":352,"options":353,"answer":28,"analysis":33},1150382,"某非经营性水利项目，投资额为2800 万元，属于（ ）。",[354,356,358,360],{"key":20,"text":355,"correct":22},"大型",{"key":24,"text":357,"correct":22},"中型",{"key":28,"text":359,"correct":26},"小型",{"key":31,"text":361,"correct":22},"大中型",{"id":363,"libraryId":5,"type":15,"typeLabel":16,"stem":364,"options":365,"answer":28,"analysis":33},1150383,"水利水电建设程序中不属于前期工作的是（ ）。",[366,368,370,372],{"key":20,"text":367,"correct":22},"项目建议书",{"key":24,"text":369,"correct":22},"可行性研究报告",{"key":28,"text":371,"correct":26},"施工准备",{"key":31,"text":373,"correct":22},"初步设计",{"id":375,"libraryId":5,"type":15,"typeLabel":16,"stem":376,"options":377,"answer":28,"analysis":33},1150384,"根据《水利部关于调整水利工程建设项目施工准备开工条件得通知》（水建管[2017]177 号），不属于施工准备条件的是（ ）。",[378,380,382,384],{"key":20,"text":379,"correct":22},"可行性研究报告已批",{"key":24,"text":381,"correct":22},"环境影响评价文件已批准",{"key":28,"text":383,"correct":26},"办理施工报建",{"key":31,"text":385,"correct":22},"年度水利投资计划下达",{"id":387,"libraryId":5,"type":15,"typeLabel":16,"stem":388,"options":389,"answer":20,"analysis":33},1150385,"当水利工程建设项目初步设计静态总投资超过已批准的可行性研究报告估算静态总投资达10%时，则需（ ）。",[390,392,394,396],{"key":20,"text":391,"correct":26},"提出专题分析报告",{"key":24,"text":393,"correct":22},"重新编制初步设计",{"key":28,"text":395,"correct":22},"调整可行性研究投资估算",{"key":31,"text":397,"correct":22},"重新编制可行性研究报告",{"id":399,"libraryId":5,"type":15,"typeLabel":16,"stem":400,"options":401,"answer":20,"analysis":33},1150386,"根据《关于水利工程建设项目代建制管理的指导意见》（水建管[2015]91 号），下列资质中不符合代建单位资质条件的是（ ）。",[402,404,406,408],{"key":20,"text":403,"correct":26},"监理",{"key":24,"text":405,"correct":22},"设计",{"key":28,"text":407,"correct":22},"咨询",{"key":31,"text":409,"correct":22},"施工总承包",{"id":411,"libraryId":5,"type":15,"typeLabel":16,"stem":412,"options":413,"answer":24,"analysis":33},1150387,"根据大坝安全状况，实际抗御洪水标准不低于部颁水利枢纽工程除险加固近期非常运用洪水标准，但达不到《防洪标准》（GB 50201—94)规定的坝属于（ ）。",[414,416,418,420],{"key":20,"text":415,"correct":22},"一类坝",{"key":24,"text":417,"correct":26},"二类坝",{"key":28,"text":419,"correct":22},"三类坝",{"key":31,"text":421,"correct":22},"四类坝",{"id":423,"libraryId":5,"type":15,"typeLabel":16,"stem":424,"options":425,"answer":20,"analysis":33},1150388,"根据《水利工程设计变更管理暂行办法》（水规计[2012]93 号），涉及工程规模发生较大变化的设计变更应事先征得（ ）的同意。",[426,428,430,432],{"key":20,"text":427,"correct":26},"原可行性研究报告批复部门",{"key":24,"text":429,"correct":22},"原初步设计审查部门",{"key":28,"text":431,"correct":22},"施工图设计审查部门",{"key":31,"text":323,"correct":22},{"id":434,"libraryId":5,"type":15,"typeLabel":16,"stem":435,"options":436,"answer":24,"analysis":33},1150389,"各单位在工程现场的项目负责人对本单位在工程现场的质量工作负（ ）责任。",[437,439,441,442],{"key":20,"text":438,"correct":22},"技术",{"key":24,"text":440,"correct":26},"直接领导",{"key":28,"text":403,"correct":22},{"key":31,"text":443,"correct":22},"领导",{"id":445,"libraryId":5,"type":15,"typeLabel":16,"stem":446,"options":447,"answer":24,"analysis":33},1150390,"以下不属于水工建筑安全鉴定的基本程序的是（ ）",[448,450,452,454],{"key":20,"text":449,"correct":22},"安全评价",{"key":24,"text":451,"correct":26},"安全鉴定",{"key":28,"text":453,"correct":22},"安全评价成果审查",{"key":31,"text":455,"correct":22},"安全鉴定报告书审定",{"id":457,"libraryId":5,"type":15,"typeLabel":16,"stem":458,"options":459,"answer":31,"analysis":33},1150391,"以下不属于水利工程蓄水安全鉴定工作的是（ ）。",[460,462,464,466],{"key":20,"text":461,"correct":22},"编制工作大纲",{"key":24,"text":463,"correct":22},"自检报告编写",{"key":28,"text":465,"correct":22},"现场鉴定与鉴定报告编写",{"key":31,"text":467,"correct":26},"鉴定报告备案",{"id":469,"libraryId":5,"type":15,"typeLabel":16,"stem":470,"options":471,"answer":24,"analysis":33},1150392,"稽查人员执行稽查任务时，对与其有利害关系的项目，应实行（ ）原则。",[472,474,476,478],{"key":20,"text":473,"correct":22},"积极参与",{"key":24,"text":475,"correct":26},"回避",{"key":28,"text":477,"correct":22},"独立",{"key":31,"text":479,"correct":22},"指导",{"id":481,"libraryId":5,"type":15,"typeLabel":16,"stem":482,"options":483,"answer":20,"analysis":33},1150393,"水利建设项目未完工程投资及预留费用可预计纳入竣工财务决算，大中型项目应控制在总概算的（ ）%以内。",[484,485,486,488],{"key":20,"text":29,"correct":26},{"key":24,"text":32,"correct":22},{"key":28,"text":487,"correct":22},"7",{"key":31,"text":489,"correct":22},"9",{"id":491,"libraryId":5,"type":15,"typeLabel":16,"stem":492,"options":493,"answer":31,"analysis":33},1150394,"事故处理需要进行设计变更的，需由（ ）提出设计变更方案",[494,495,497,499],{"key":20,"text":325,"correct":22},{"key":24,"text":496,"correct":22},"有资质的设计单位",{"key":28,"text":498,"correct":22},"原设计单位",{"key":31,"text":500,"correct":26},"原设计单位或有资质的单位",{"id":502,"libraryId":5,"type":15,"typeLabel":16,"stem":503,"options":504,"answer":28,"analysis":33},1150395,"水闸在首次安全鉴定后,以后应每隔（ ）年进行一次全面安全鉴定",[505,506,508,510],{"key":20,"text":32,"correct":22},{"key":24,"text":507,"correct":22},"6",{"key":28,"text":509,"correct":26},"10",{"key":31,"text":511,"correct":22},"15",{"id":513,"libraryId":5,"type":15,"typeLabel":16,"stem":514,"options":515,"answer":20,"analysis":33},1150396,"根据《水利基本建设项目竣工财务决算编制规程》（SL19-2014），大型项目进行竣工决算时，未完工程投资和预留费用的比例不得超过（ ）的3%。",[516,518,520,522],{"key":20,"text":517,"correct":26},"总概算",{"key":24,"text":519,"correct":22},"总估算",{"key":28,"text":521,"correct":22},"预算总价",{"key":31,"text":523,"correct":22},"合同总价",{"id":525,"libraryId":5,"type":15,"typeLabel":16,"stem":526,"options":527,"answer":20,"analysis":33},1150397,"根据《关于水利工程建设项目代建制管理的指导意见》（水建管[2015]91号），拟实施代建制的项目应在（ ）阶段前选定代建单位。",[528,529,531,532],{"key":20,"text":371,"correct":26},{"key":24,"text":530,"correct":22},"开工建设",{"key":28,"text":369,"correct":22},{"key":31,"text":533,"correct":22},"主体开工",{"id":535,"libraryId":5,"type":15,"typeLabel":16,"stem":536,"options":537,"answer":28,"analysis":33},1150398,"大坝在首次安全鉴定后，以后应每隔（ ）年进行一次全面安全鉴定。",[538,539,540,541],{"key":20,"text":25,"correct":22},{"key":24,"text":32,"correct":22},{"key":28,"text":509,"correct":26},{"key":31,"text":511,"correct":22},{"id":543,"libraryId":5,"type":15,"typeLabel":16,"stem":544,"options":545,"answer":31,"analysis":33},1150399,"根据《水利工程建设项目勘察（测）设计招标投标管理办法》（水总[2004]511号），招标人采用未中标人投标文件中的技术方案，若招标文件规定给予补偿的，招标人应在与中标人签订合同后（ ）个工作日内予以补偿。",[546,548,549,550],{"key":20,"text":547,"correct":22},"14",{"key":24,"text":509,"correct":22},{"key":28,"text":487,"correct":22},{"key":31,"text":32,"correct":26},{"id":552,"libraryId":5,"type":15,"typeLabel":16,"stem":553,"options":554,"answer":28,"analysis":33},1150400,"工程初步设计静态总投资宜控制在可行性研究报告相应估算静态总投资（ ）以下。",[555,557,559,561],{"key":20,"text":556,"correct":22},"15%",{"key":24,"text":558,"correct":22},"25%",{"key":28,"text":560,"correct":26},"115%",{"key":31,"text":562,"correct":22},"125%",{"id":564,"libraryId":5,"type":15,"typeLabel":16,"stem":565,"options":566,"answer":31,"analysis":33},1150401,"在勘察设计招投标中，下列不属于“可不招标情形”的是（ ）。",[567,569,571,573],{"key":20,"text":568,"correct":22},"工程项目涉及国家安全.国家秘密",{"key":24,"text":570,"correct":22},"抢险救灾",{"key":28,"text":572,"correct":22},"技术复杂.专业性强，满足要求的勘察设计单位少于三家",{"key":31,"text":574,"correct":26},"地方重点水利项目",{"id":576,"libraryId":5,"type":15,"typeLabel":16,"stem":577,"options":578,"answer":24,"analysis":33},1150402,"根据主体工程开工的有关规定，项目法人应当自工程开工之日起15工作日内将（ ）",[579,581,583,585],{"key":20,"text":580,"correct":22},"开工情况的书面报告上报上一级主管单位审批",{"key":24,"text":582,"correct":26},"开工情况的书面报告上报上一级主管单位备案",{"key":28,"text":584,"correct":22},"开工报告上报上一级主管单位备案",{"key":31,"text":586,"correct":22},"开工报告上报上一级主管单位审批",{"id":588,"libraryId":5,"type":15,"typeLabel":16,"stem":589,"options":590,"answer":20,"analysis":33},1150403,"施工单位等单位负责人，对本单位质量工作负（ ）责任。",[591,592,593,595],{"key":20,"text":443,"correct":26},{"key":24,"text":440,"correct":22},{"key":28,"text":594,"correct":22},"间接领导",{"key":31,"text":596,"correct":22},"全部领导",[598,601,604,607,610,613],{"id":15,"name":599,"category":7,"favorite":600},"领导干部任职前廉政法规知识测试题",92,{"id":602,"name":603,"category":7,"favorite":15},595,"建筑结构与设备",{"id":605,"name":606,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":608,"name":609,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":611,"name":612,"category":7,"favorite":8},534,"BIM工程师",{"id":614,"name":612,"category":7,"favorite":8},535]