[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-803-6":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":595},{"id":5,"name":6,"category":7,"favorite":8},803,"一建水利水电工程实务","建筑工程",0,6,50,1981,[13,34,46,58,70,81,93,105,117,128,140,149,161,173,185,197,209,221,233,244,254,262,274,284,296,306,318,330,342,354,366,378,390,402,414,422,434,446,458,470,482,494,502,514,526,538,550,562,574,586],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},1150250,1,"单选题","过渡料进行坝料压实检查时，试坑深度为（ ）倍的碾压层厚。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","0.5",false,{"key":24,"text":25,"correct":26},"B","1",true,{"key":28,"text":29,"correct":22},"C","1.5",{"key":31,"text":32,"correct":22},"D","2","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":28,"analysis":33},1150251,"砂砾料进行压实检查时，检查项目不包括（ ）",[38,40,42,44],{"key":20,"text":39,"correct":22},"干密度",{"key":24,"text":41,"correct":22},"相对密度",{"key":28,"text":43,"correct":26},"孔隙率",{"key":31,"text":45,"correct":22},"颗粒级配",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":20,"analysis":33},1150252,"在确定土方填筑压实含水量时，黏性土料压实含水量可取ωp+2%、ωp、ωp-2%的三种情况进行试验，此处ωp是土料（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":26},"塑限",{"key":24,"text":53,"correct":22},"液限",{"key":28,"text":55,"correct":22},"最优含水量",{"key":31,"text":57,"correct":22},"平均含水量",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":20,"analysis":33},1150253,"贯穿于土石坝施工的各个环节和施工全过程的是（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":26},"施工质量检查和控制",{"key":24,"text":65,"correct":22},"施工监督",{"key":28,"text":67,"correct":22},"施工前的准备工作",{"key":31,"text":69,"correct":22},"施工中的安全第一原则",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":24,"analysis":33},1150254,"面板堆石坝堆石压实的质量参数应采用碾压参数和（ ）。",[74,76,77,79],{"key":20,"text":75,"correct":22},"密实度",{"key":24,"text":43,"correct":26},{"key":28,"text":78,"correct":22},"含水量",{"key":31,"text":80,"correct":22},"密度",{"id":82,"libraryId":5,"type":15,"typeLabel":16,"stem":83,"options":84,"answer":31,"analysis":33},1150255,"下列不属于土石坝施工基本作业的是（ ）。",[85,87,89,91],{"key":20,"text":86,"correct":22},"坝面铺平",{"key":24,"text":88,"correct":22},"坝面压实",{"key":28,"text":90,"correct":22},"坝面质检",{"key":31,"text":92,"correct":26},"坝面排水",{"id":94,"libraryId":5,"type":15,"typeLabel":16,"stem":95,"options":96,"answer":20,"analysis":33},1150256,"土石方工程的开挖机械主要是（ ）。",[97,99,101,103],{"key":20,"text":98,"correct":26},"挖掘机",{"key":24,"text":100,"correct":22},"推土机",{"key":28,"text":102,"correct":22},"铲运机",{"key":31,"text":104,"correct":22},"装载机",{"id":106,"libraryId":5,"type":15,"typeLabel":16,"stem":107,"options":108,"answer":28,"analysis":33},1150257,"自行式铲运机的经济运距一般为（ ）m。",[109,111,113,115],{"key":20,"text":110,"correct":22},"100～200",{"key":24,"text":112,"correct":22},"150～300",{"key":28,"text":114,"correct":26},"200～300",{"key":31,"text":116,"correct":22},"300～500",{"id":118,"libraryId":5,"type":15,"typeLabel":16,"stem":119,"options":120,"answer":28,"analysis":33},1150258,"土石坝填筑施工中，砂的填筑标准应以相对密度为设计控制指标，砂的相对密度不应低于（ ）。",[121,122,124,126],{"key":20,"text":21,"correct":22},{"key":24,"text":123,"correct":22},"0.6",{"key":28,"text":125,"correct":26},"0.7",{"key":31,"text":127,"correct":22},"0.8",{"id":129,"libraryId":5,"type":15,"typeLabel":16,"stem":130,"options":131,"answer":20,"analysis":33},1150259,"黏性土料需要在坝面加水时，应作到（ ），以保证压实效果。",[132,134,136,138],{"key":20,"text":133,"correct":26},"少.勤.匀",{"key":24,"text":135,"correct":22},"多.勤.匀",{"key":28,"text":137,"correct":22},"少.短.匀",{"key":31,"text":139,"correct":22},"少.长.匀",{"id":141,"libraryId":5,"type":15,"typeLabel":16,"stem":142,"options":143,"answer":24,"analysis":33},1150260,"某土石坝面碾压施工设计碾压遍数为5遍，碾滚净宽为4m，则错距宽度为（ ）m。",[144,145,146,148],{"key":20,"text":21,"correct":22},{"key":24,"text":127,"correct":26},{"key":28,"text":147,"correct":22},"1.0",{"key":31,"text":29,"correct":22},{"id":150,"libraryId":5,"type":15,"typeLabel":16,"stem":151,"options":152,"answer":24,"analysis":33},1150261,"在碾压土石坝坝面作业中，取代表性试样进行室内物理力学性能试验，应取代表试样的总数为（ ）。",[153,155,157,159],{"key":20,"text":154,"correct":22},"少于30个",{"key":24,"text":156,"correct":26},"不少于30个",{"key":28,"text":158,"correct":22},"少于20个",{"key":31,"text":160,"correct":22},"不少于20个",{"id":162,"libraryId":5,"type":15,"typeLabel":16,"stem":163,"options":164,"answer":28,"analysis":33},1150262,"为保证堆石体的坚固、稳定，面板堆石坝主要部位石料的抗压强度不应低于（ ）MPa。",[165,167,169,171],{"key":20,"text":166,"correct":22},"58",{"key":24,"text":168,"correct":22},"68",{"key":28,"text":170,"correct":26},"78",{"key":31,"text":172,"correct":22},"88",{"id":174,"libraryId":5,"type":15,"typeLabel":16,"stem":175,"options":176,"answer":28,"analysis":33},1150263,"面板堆石坝面板混凝土浇筑施工中应控制入槽混凝土的坍落度在（ ）cm。",[177,179,181,183],{"key":20,"text":178,"correct":22},"1～4",{"key":24,"text":180,"correct":22},"2～5",{"key":28,"text":182,"correct":26},"3～6",{"key":31,"text":184,"correct":22},"4～7",{"id":186,"libraryId":5,"type":15,"typeLabel":16,"stem":187,"options":188,"answer":28,"analysis":33},1150264,"面板堆石坝按规定取样测定干密度，当样本数小于20组时，不合格点的干密度不低于设计干密度的（ ）控制。",[189,191,193,195],{"key":20,"text":190,"correct":22},"90%",{"key":24,"text":192,"correct":22},"93%",{"key":28,"text":194,"correct":26},"95",{"key":31,"text":196,"correct":22},"98",{"id":198,"libraryId":5,"type":15,"typeLabel":16,"stem":199,"options":200,"answer":31,"analysis":33},1150265,"混凝土面板堆石坝中面板的主要功能是（ ）。",[201,203,205,207],{"key":20,"text":202,"correct":22},"抗压",{"key":24,"text":204,"correct":22},"抗冲",{"key":28,"text":206,"correct":22},"抗拉",{"key":31,"text":208,"correct":26},"抗渗",{"id":210,"libraryId":5,"type":15,"typeLabel":16,"stem":211,"options":212,"answer":24,"analysis":33},1150266,"钢筋机械连接接头在构件的受拉区配置在同一截面的接头面积不超过受力钢筋总面积的（ ）",[213,215,217,219],{"key":20,"text":214,"correct":22},"25%",{"key":24,"text":216,"correct":26},"50%",{"key":28,"text":218,"correct":22},"70%",{"key":31,"text":220,"correct":22},"100%",{"id":222,"libraryId":5,"type":15,"typeLabel":16,"stem":223,"options":224,"answer":24,"analysis":33},1150267,"在测量混凝土拌合设备出料口温度时，应测量混凝土拌合物深（ ）cm 处的温度。",[225,227,229,231],{"key":20,"text":226,"correct":22},"1~3",{"key":24,"text":228,"correct":26},"3~5",{"key":28,"text":230,"correct":22},"5~7",{"key":31,"text":232,"correct":22},"7~9",{"id":234,"libraryId":5,"type":15,"typeLabel":16,"stem":235,"options":236,"answer":28,"analysis":33},1150268,"混凝土结构中，非承重模板在混凝土强度达到（ ）MPa 时才能拆除。",[237,238,240,242],{"key":20,"text":29,"correct":22},{"key":24,"text":239,"correct":22},"2.0",{"key":28,"text":241,"correct":26},"2.5",{"key":31,"text":243,"correct":22},"3.0",{"id":245,"libraryId":5,"type":15,"typeLabel":16,"stem":246,"options":247,"answer":20,"analysis":33},1150269,"在加工钢筋时，钢筋应平直，中心线与直线的偏差不应超过全长的（ ）%。",[248,249,250,252],{"key":20,"text":25,"correct":26},{"key":24,"text":32,"correct":22},{"key":28,"text":251,"correct":22},"3",{"key":31,"text":253,"correct":22},"4",{"id":255,"libraryId":5,"type":15,"typeLabel":16,"stem":256,"options":257,"answer":20,"analysis":33},1150270,"钢筋绑扎接头在构件的受拉区配置在同一截面的接头面积不超过受力钢筋总面积的（ ）。",[258,259,260,261],{"key":20,"text":214,"correct":26},{"key":24,"text":216,"correct":22},{"key":28,"text":218,"correct":22},{"key":31,"text":220,"correct":22},{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":20,"analysis":33},1150272,"某混凝土工程，高峰月浇筑强度为25 万m3，月平均浇筑强度为18 万m3，不均匀系数为1.3，则需求混凝土拌合系统规模为（ ）。",[266,268,270,272],{"key":20,"text":267,"correct":26},"大型",{"key":24,"text":269,"correct":22},"中型",{"key":28,"text":271,"correct":22},"小型",{"key":31,"text":273,"correct":22},"特大型",{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":24,"analysis":33},1150273,"根据《水利水电工程施工组织设计规范》（S303-2017），生产能力为75m3\u002Fh 的拌合系统规模为（ ）。",[278,279,280,282],{"key":20,"text":267,"correct":22},{"key":24,"text":269,"correct":26},{"key":28,"text":281,"correct":22},"小（1）型",{"key":31,"text":283,"correct":22},"小（2）型",{"id":285,"libraryId":5,"type":15,"typeLabel":16,"stem":286,"options":287,"answer":31,"analysis":33},1150274,"VC 值太小表示碾压混凝土拌合料（ ）。",[288,290,292,294],{"key":20,"text":289,"correct":22},"太稠",{"key":24,"text":291,"correct":22},"太稀",{"key":28,"text":293,"correct":22},"太干",{"key":31,"text":295,"correct":26},"太湿",{"id":297,"libraryId":5,"type":15,"typeLabel":16,"stem":298,"options":299,"answer":28,"analysis":33},1150275,"生产能力为2万m3\u002F月的混凝土拌合系统，其规模属于（ ）。",[300,302,304,305],{"key":20,"text":301,"correct":22},"大（1）型",{"key":24,"text":303,"correct":22},"大（2）型",{"key":28,"text":269,"correct":26},{"key":31,"text":271,"correct":22},{"id":307,"libraryId":5,"type":15,"typeLabel":16,"stem":308,"options":309,"answer":31,"analysis":33},1150276,"下列关于混凝土运输说法错误的是（ ）。",[310,312,314,316],{"key":20,"text":311,"correct":22},"料罐车装载混凝土的厚度不小于40cm",{"key":24,"text":313,"correct":22},"门式起重机起吊设备运转时，与周围施工设备及建筑物保持安全距离，并安装防撞装置",{"key":28,"text":315,"correct":22},"溜筒运输结束应及时冲洗",{"key":31,"text":317,"correct":26},"混凝土运输过程中初凝，可在运输途中加水",{"id":319,"libraryId":5,"type":15,"typeLabel":16,"stem":320,"options":321,"answer":31,"analysis":33},1150277,"用同钢号某直径钢筋代替另一种直径的钢筋时，变更后钢筋总截面面积与设计文件规定的截面面积之比为（ ）。",[322,324,326,328],{"key":20,"text":323,"correct":22},"95%～106%",{"key":24,"text":325,"correct":22},"96%～105%",{"key":28,"text":327,"correct":22},"97%～104%",{"key":31,"text":329,"correct":26},"98%～103%",{"id":331,"libraryId":5,"type":15,"typeLabel":16,"stem":332,"options":333,"answer":31,"analysis":33},1150278,"钢筋焊接与绑扎接头距离钢筋弯头起点不小于（ ）。",[334,336,338,340],{"key":20,"text":335,"correct":22},"5d",{"key":24,"text":337,"correct":22},"6d",{"key":28,"text":339,"correct":22},"8d",{"key":31,"text":341,"correct":26},"10d",{"id":343,"libraryId":5,"type":15,"typeLabel":16,"stem":344,"options":345,"answer":24,"analysis":33},1150279,"为保持坝体的整体稳定性，必须对接缝进行灌浆或设置宽缝回填膨胀混凝土的分缝是（ ）。",[346,348,350,352],{"key":20,"text":347,"correct":22},"横缝",{"key":24,"text":349,"correct":26},"纵缝",{"key":28,"text":351,"correct":22},"斜缝",{"key":31,"text":353,"correct":22},"错缝",{"id":355,"libraryId":5,"type":15,"typeLabel":16,"stem":356,"options":357,"answer":20,"analysis":33},1150280,"整个坝段不设纵缝，以一个坝段进行浇筑的是（ ）。",[358,360,362,364],{"key":20,"text":359,"correct":26},"通仓浇筑",{"key":24,"text":361,"correct":22},"平浇法",{"key":28,"text":363,"correct":22},"薄层浇筑",{"key":31,"text":365,"correct":22},"阶梯浇筑",{"id":367,"libraryId":5,"type":15,"typeLabel":16,"stem":368,"options":369,"answer":28,"analysis":33},1150281,"碾压混凝土坝的混凝土强度在施工过程中是以（ ）进行控制的。",[370,372,374,376],{"key":20,"text":371,"correct":22},"钻孔取芯",{"key":24,"text":373,"correct":22},"压水试验",{"key":28,"text":375,"correct":26},"监测密度",{"key":31,"text":377,"correct":22},"留置试块",{"id":379,"libraryId":5,"type":15,"typeLabel":16,"stem":380,"options":381,"answer":31,"analysis":33},1150282,"下列选择中不属于拌和机按搅拌方式划分的是（ ）。",[382,384,386,388],{"key":20,"text":383,"correct":22},"自落式",{"key":24,"text":385,"correct":22},"强制式",{"key":28,"text":387,"correct":22},"涡流式",{"key":31,"text":389,"correct":26},"混合式",{"id":391,"libraryId":5,"type":15,"typeLabel":16,"stem":392,"options":393,"answer":28,"analysis":33},1150283,"塑性混凝土应在浇筑完毕后（ ）开始洒水养护。",[394,396,398,400],{"key":20,"text":395,"correct":22},"24h后",{"key":24,"text":397,"correct":22},"立即",{"key":28,"text":399,"correct":26},"6～18h内",{"key":31,"text":401,"correct":22},"3d后",{"id":403,"libraryId":5,"type":15,"typeLabel":16,"stem":404,"options":405,"answer":31,"analysis":33},1150284,"钢筋标注形式“nΦd@s”中，s表示钢筋（ ）。",[406,408,410,412],{"key":20,"text":407,"correct":22},"根数",{"key":24,"text":409,"correct":22},"等级",{"key":28,"text":411,"correct":22},"直径",{"key":31,"text":413,"correct":26},"间距",{"id":415,"libraryId":5,"type":15,"typeLabel":16,"stem":416,"options":417,"answer":31,"analysis":33},1150285,"垂直于坝轴线方向的缝称为（ ）。",[418,419,420,421],{"key":20,"text":349,"correct":22},{"key":24,"text":351,"correct":22},{"key":28,"text":353,"correct":22},{"key":31,"text":347,"correct":26},{"id":423,"libraryId":5,"type":15,"typeLabel":16,"stem":424,"options":425,"answer":24,"analysis":33},1150286,"VC值是评价碾压混凝土（ ）的指标。",[426,428,430,432],{"key":20,"text":427,"correct":22},"湿密度",{"key":24,"text":429,"correct":26},"干湿度",{"key":28,"text":431,"correct":22},"压实度",{"key":31,"text":433,"correct":22},"均匀性",{"id":435,"libraryId":5,"type":15,"typeLabel":16,"stem":436,"options":437,"answer":24,"analysis":33},1150287,"基础面以上（ ）高度范围称强约束区。",[438,440,442,444],{"key":20,"text":439,"correct":22},"0～0.1L",{"key":24,"text":441,"correct":26},"0～0.2L",{"key":28,"text":443,"correct":22},"0～0.3L",{"key":31,"text":445,"correct":22},"0～0.4L",{"id":447,"libraryId":5,"type":15,"typeLabel":16,"stem":448,"options":449,"answer":24,"analysis":33},1150289,"碾压混凝土坝一般采用VC 值是（ ）s 的干贫混凝土。",[450,452,454,456],{"key":20,"text":451,"correct":22},"0~10",{"key":24,"text":453,"correct":26},"10~30",{"key":28,"text":455,"correct":22},"30~60",{"key":31,"text":457,"correct":22},"60~90",{"id":459,"libraryId":5,"type":15,"typeLabel":16,"stem":460,"options":461,"answer":20,"analysis":33},1150290,"碾压混凝土坝通常采用通仓薄层浇筑，采用RCC工法厚度通常为（ ）cm。",[462,464,466,468],{"key":20,"text":463,"correct":26},"30",{"key":24,"text":465,"correct":22},"50",{"key":28,"text":467,"correct":22},"75",{"key":31,"text":469,"correct":22},"100",{"id":471,"libraryId":5,"type":15,"typeLabel":16,"stem":472,"options":473,"answer":28,"analysis":33},1150291,"堤防填筑作业中，提防横断面上的地面坡度不应陡于（ ）。",[474,476,478,480],{"key":20,"text":475,"correct":22},"1：3",{"key":24,"text":477,"correct":22},"1：4",{"key":28,"text":479,"correct":26},"1：5",{"key":31,"text":481,"correct":22},"1：6",{"id":483,"libraryId":5,"type":15,"typeLabel":16,"stem":484,"options":485,"answer":24,"analysis":33},1150292,"堤防填筑作业中，砂砾料宜采用（ ）卸料。",[486,488,490,492],{"key":20,"text":487,"correct":22},"进占法",{"key":24,"text":489,"correct":26},"后退法",{"key":28,"text":491,"correct":22},"进占法倒退",{"key":31,"text":493,"correct":22},"端进法",{"id":495,"libraryId":5,"type":15,"typeLabel":16,"stem":496,"options":497,"answer":28,"analysis":33},1150293,"堤防填筑碾压试验土料含水率应控制在最优含水率的±（ ）%以内。",[498,499,500,501],{"key":20,"text":25,"correct":22},{"key":24,"text":32,"correct":22},{"key":28,"text":251,"correct":26},{"key":31,"text":253,"correct":22},{"id":503,"libraryId":5,"type":15,"typeLabel":16,"stem":504,"options":505,"answer":24,"analysis":33},1150294,"在堤防工程中，铲运机兼作压实机械时，轮迹应搭压轮宽的（ ）。",[506,508,510,512],{"key":20,"text":507,"correct":22},"1\u002F2",{"key":24,"text":509,"correct":26},"1\u002F3",{"key":28,"text":511,"correct":22},"1\u002F4",{"key":31,"text":513,"correct":22},"1\u002F5",{"id":515,"libraryId":5,"type":15,"typeLabel":16,"stem":516,"options":517,"answer":31,"analysis":33},1150295,"吸扬式挖泥船进行吹填工程施工宜采用的开挖方式是（ ）。",[518,520,522,524],{"key":20,"text":519,"correct":22},"横挖法",{"key":24,"text":521,"correct":22},"反挖法",{"key":28,"text":523,"correct":22},"顺流开挖",{"key":31,"text":525,"correct":26},"逆流开挖",{"id":527,"libraryId":5,"type":15,"typeLabel":16,"stem":528,"options":529,"answer":24,"analysis":33},1150296,"疏浚工程施工中，监理单位平行检验测量点数不应少于施工单位检测点数的（ ）。",[530,532,534,536],{"key":20,"text":531,"correct":22},"3%",{"key":24,"text":533,"correct":26},"5%",{"key":28,"text":535,"correct":22},"8%",{"key":31,"text":537,"correct":22},"10%",{"id":539,"libraryId":5,"type":15,"typeLabel":16,"stem":540,"options":541,"answer":31,"analysis":33},1150297,"堤防横断面上的地面坡度陡于（ ）时，应将地面坡度削至缓于（ ）。",[542,544,546,548],{"key":20,"text":543,"correct":22},"1：2；1:2",{"key":24,"text":545,"correct":22},"1：3；1:3",{"key":28,"text":547,"correct":22},"1：4；1:4",{"key":31,"text":549,"correct":26},"1：5；1:5",{"id":551,"libraryId":5,"type":15,"typeLabel":16,"stem":552,"options":553,"answer":28,"analysis":33},1150298,"以下不属于水电站布置形式的是（ ）水电站。",[554,556,558,560],{"key":20,"text":555,"correct":22},"坝式",{"key":24,"text":557,"correct":22},"河床式",{"key":28,"text":559,"correct":26},"水闸式",{"key":31,"text":561,"correct":22},"引水式",{"id":563,"libraryId":5,"type":15,"typeLabel":16,"stem":564,"options":565,"answer":20,"analysis":33},1150299,"某水轮机型号为HL220—LJ—200，其中“220”表示（ ）。",[566,568,570,572],{"key":20,"text":567,"correct":26},"转轮型号",{"key":24,"text":569,"correct":22},"工作水头",{"key":28,"text":571,"correct":22},"主轴型号",{"key":31,"text":573,"correct":22},"转轮标称直径",{"id":575,"libraryId":5,"type":15,"typeLabel":16,"stem":576,"options":577,"answer":24,"analysis":33},1150300,"型号为QPPYII2x80D 的启闭机属于（ ）启闭机。",[578,580,582,584],{"key":20,"text":579,"correct":22},"卷扬",{"key":24,"text":581,"correct":26},"液压",{"key":28,"text":583,"correct":22},"螺杆",{"key":31,"text":585,"correct":22},"轮盘",{"id":587,"libraryId":5,"type":15,"typeLabel":16,"stem":588,"options":589,"answer":31,"analysis":33},1150301,"（ ）水电站是集中河段落差形成发电水头的水电站。",[590,592,593,594],{"key":20,"text":591,"correct":22},"坝后式",{"key":24,"text":555,"correct":22},{"key":28,"text":557,"correct":22},{"key":31,"text":561,"correct":26},[596,599,602,605,608,611],{"id":15,"name":597,"category":7,"favorite":598},"领导干部任职前廉政法规知识测试题",92,{"id":600,"name":601,"category":7,"favorite":15},595,"建筑结构与设备",{"id":603,"name":604,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":606,"name":607,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":609,"name":610,"category":7,"favorite":8},534,"BIM工程师",{"id":612,"name":610,"category":7,"favorite":8},535]