[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-803-39":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":725},{"id":5,"name":6,"category":7,"favorite":8},803,"一建水利水电工程实务","建筑工程",0,39,50,1981,[13,38,52,67,82,97,112,127,142,156,170,184,198,212,226,240,254,268,283,297,312,323,337,351,365,380,395,409,423,438,452,467,482,496,510,524,538,552,567,580,594,608,622,631,646,660,673,687,701,715],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1151925,2,"多选题","根据《水电工程设计概算费用标准》（2013年版），枢纽建筑物费用中的建筑及安装工程费包括（ ）。",[19,23,27,30,33],{"key":20,"text":21,"correct":22},"A","直接工程费",false,{"key":24,"text":25,"correct":26},"B","直接费",true,{"key":28,"text":29,"correct":26},"C","间接费",{"key":31,"text":32,"correct":26},"D","利润",{"key":34,"text":35,"correct":26},"E","税金","BCDE","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":36,"analysis":37},1151926,"根据《水电工程设计概算编制规定》（2013年版），水电工程建设征地及移民安置包括（ ）等。",[42,44,46,48,50],{"key":20,"text":43,"correct":22},"灌溉渠道工程",{"key":24,"text":45,"correct":26},"水土保持工程",{"key":28,"text":47,"correct":26},"城市集镇迁建",{"key":31,"text":49,"correct":26},"库底清理工程",{"key":34,"text":51,"correct":26},"环境保护工程",{"id":53,"libraryId":5,"type":15,"typeLabel":16,"stem":54,"options":55,"answer":66,"analysis":37},1151927,"根据《水电工程没计概算编制规定》（2013年版），水电工程的独立费用包括（ ）。",[56,58,60,62,64],{"key":20,"text":57,"correct":26},"项目建设管理费",{"key":24,"text":59,"correct":26},"生产准备费",{"key":28,"text":61,"correct":26},"科研勘察设计费",{"key":31,"text":63,"correct":22},"临时工程费",{"key":34,"text":65,"correct":26},"其他税费","ABCE",{"id":68,"libraryId":5,"type":15,"typeLabel":16,"stem":69,"options":70,"answer":81,"analysis":37},1151928,"水电工程设计概算项目划分为（ ）三部分。",[71,73,75,77,79],{"key":20,"text":72,"correct":26},"枢纽工程",{"key":24,"text":74,"correct":22},"引调水工程",{"key":28,"text":76,"correct":26},"建设征地和移民安置",{"key":31,"text":78,"correct":22},"环境保护和水土保持工程",{"key":34,"text":80,"correct":26},"独立费用","ACE",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":96,"analysis":37},1151929,"下列关于定额使用说法，错误的是（ ）。",[86,88,90,92,94],{"key":20,"text":87,"correct":22},"土方定额的计量单位除注明外，均按自然方计算",{"key":24,"text":89,"correct":26},"挖掘机挖土定额按自然方拟定，如挖松土时人工及挖掘机械乘0.8调整系数",{"key":28,"text":91,"correct":22},"钢筋制作安装定额不分部位、规格型号综合计算",{"key":31,"text":93,"correct":26},"定额中的混凝土用量没有包括模板变形、干缩等损耗",{"key":34,"text":95,"correct":26},"挖泥船如使用潜管时按定额子目的人工、挖泥船及配套船舶定额乘1.05系数","BDE",{"id":98,"libraryId":5,"type":15,"typeLabel":16,"stem":99,"options":100,"answer":111,"analysis":37},1151930,"下列关于《水利建筑工程预算定额》说法，正确的是（ ）。",[101,103,105,107,109],{"key":20,"text":102,"correct":26},"定额中人工是指完成该定额子目工作内容所需的人工耗用量，包括基本用工和辅助用工",{"key":24,"text":104,"correct":26},"材料定额中未列明品种、规格的可根据设计选定的品种规格计算，定额数量不作调整",{"key":28,"text":106,"correct":22},"材料定额中已列品种规格的编制预算单价时价格可以调整",{"key":31,"text":108,"correct":26},"挖掘机定额均按液压挖掘机拟定",{"key":34,"text":110,"correct":22},"零星材料费以材料费为计算基础","ABD",{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":126,"analysis":37},1151931,"下列关于工程定额说法，正确的是（ ）。",[116,118,120,122,124],{"key":20,"text":117,"correct":26},"施工定额是企业编制投标报价和成本管理的重要依据",{"key":24,"text":119,"correct":22},"概算定额是施工企业内部经济核算的依据",{"key":28,"text":121,"correct":26},"预算定额是招标阶段编制标底、报价的依据",{"key":31,"text":123,"correct":22},"施工定额是编制标底的依据",{"key":34,"text":125,"correct":22},"预算定额是编制概算定额的基础","AC",{"id":128,"libraryId":5,"type":15,"typeLabel":16,"stem":129,"options":130,"answer":141,"analysis":37},1151932,"水利工程定额按费用性质分（ ）。",[131,133,135,137,139],{"key":20,"text":132,"correct":22},"预算定额",{"key":24,"text":134,"correct":26},"直接费定额",{"key":28,"text":136,"correct":26},"间接费定额",{"key":31,"text":138,"correct":26},"其他基本建设费用定额",{"key":34,"text":140,"correct":22},"综合定额","BCD",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":66,"analysis":37},1151933,"水利工程定额按应用范围划分为（ ）。",[146,148,150,152,154],{"key":20,"text":147,"correct":26},"水利行业定额",{"key":24,"text":149,"correct":26},"水利地方定额",{"key":28,"text":151,"correct":26},"全国统一定额",{"key":31,"text":153,"correct":22},"施工定额",{"key":34,"text":155,"correct":26},"企业定额",{"id":157,"libraryId":5,"type":15,"typeLabel":16,"stem":158,"options":159,"answer":36,"analysis":37},1151934,"水利工程建设项目施工实施阶段监理工作的基本内容包括（ ）。",[160,162,164,166,168],{"key":20,"text":161,"correct":22},"主持技术交底会，由设计单位进行技术交底",{"key":24,"text":163,"correct":26},"签发开工通知",{"key":28,"text":165,"correct":26},"审批施工总进度计划",{"key":31,"text":167,"correct":26},"签发最终付款证书",{"key":34,"text":169,"correct":26},"协助发包人编制合同工程付款计划",{"id":171,"libraryId":5,"type":15,"typeLabel":16,"stem":172,"options":173,"answer":141,"analysis":37},1151935,"下列工作属于水利工程建设项目施工实施阶段监理工作基本内容的是（ ）。",[174,176,178,180,182],{"key":20,"text":175,"correct":22},"审核承包人按照在施工准备工作完成后递交的项目工程开工申请报告",{"key":24,"text":177,"correct":26},"审核工程价款月结算付款申请，签发付款证书",{"key":28,"text":179,"correct":26},"根据施工合同约定进行价格调整",{"key":31,"text":181,"correct":26},"工程质量评定与验收",{"key":34,"text":183,"correct":22},"检查由发包人提供的测量基准点的移交情况",{"id":185,"libraryId":5,"type":15,"typeLabel":16,"stem":186,"options":187,"answer":197,"analysis":37},1151936,"工程施工实施阶段监理进行投资控制的基本内容有（ ）。",[188,190,192,194,195],{"key":20,"text":189,"correct":26},"协助发包人编制年、月的合同付款计划",{"key":24,"text":191,"correct":26},"审批承包人提交的资金流计划",{"key":28,"text":193,"correct":22},"根据市场情况进行价格调整",{"key":31,"text":167,"correct":26},{"key":34,"text":196,"correct":26},"审核工程付款申请","ABDE",{"id":199,"libraryId":5,"type":15,"typeLabel":16,"stem":200,"options":201,"answer":197,"analysis":37},1151937,"工程施工实施阶段监理工作的基本内容有（ ）。",[202,204,206,208,210],{"key":20,"text":203,"correct":26},"开工条件的控制",{"key":24,"text":205,"correct":26},"工程质量控制",{"key":28,"text":207,"correct":22},"工程成本控制",{"key":31,"text":209,"correct":26},"工程进度控制",{"key":34,"text":211,"correct":26},"施工安全与环境保护",{"id":213,"libraryId":5,"type":15,"typeLabel":16,"stem":214,"options":215,"answer":111,"analysis":37},1151938,"水利工程建设项目施工准备工作阶段监理工作的基本内容有（ ）。",[216,218,220,222,224],{"key":20,"text":217,"correct":26},"原材料的储存量及供应计划是否满足开工及施工进度的需要",{"key":24,"text":219,"correct":26},"进场原材料、中间产品和工程设备的质量、规格是否符合施工合同约定",{"key":28,"text":221,"correct":22},"审批工程月进度计划",{"key":31,"text":223,"correct":26},"应参加、主持或与发包人联合主持召开设计交底会议，由设计单位进行设计文件的技术交底。",{"key":34,"text":225,"correct":22},"协助发包人编制合同项目的付款计划",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":81,"analysis":37},1151939,"总监理工程师不得将以下工作授权给副总监理工程师或监理工程师的有（ ）。",[230,232,234,236,238],{"key":20,"text":231,"correct":26},"主持审核承包人提出的分包项目和分包人",{"key":24,"text":233,"correct":22},"主持处理合同违约、变更和索赔等事宜",{"key":28,"text":235,"correct":26},"签发监理月报、监理专题报告和监理.工作报告",{"key":31,"text":237,"correct":22},"审核质量保证体系文件并监督其实施、审批工程质量缺陷的处理方案",{"key":34,"text":239,"correct":26},"要求承包人撤换不称职或不宜在本工程工作的现场施工人员或技术、管理人员",{"id":241,"libraryId":5,"type":15,"typeLabel":16,"stem":242,"options":243,"answer":96,"analysis":37},1151940,"监理工程师职责有（ ）。",[244,246,248,250,252],{"key":20,"text":245,"correct":22},"编制监理规划",{"key":24,"text":247,"correct":26},"预审各类付款证书",{"key":28,"text":249,"correct":22},"签发监理月报",{"key":31,"text":251,"correct":26},"审批分部工程开工申请振告",{"key":34,"text":253,"correct":26},"编制监理实施细则",{"id":255,"libraryId":5,"type":15,"typeLabel":16,"stem":256,"options":257,"answer":197,"analysis":37},1151941,"下列关于总监理工程师的说法，正确的是（ ）。",[258,260,262,264,266],{"key":20,"text":259,"correct":26},"水电监理实行总监理工程师负责制",{"key":24,"text":261,"correct":26},"总监理工程师应负责全面履行监理合同约定的监理单位的义务",{"key":28,"text":263,"correct":22},"项目法人有权变更总监理工程师发布的有关指令",{"key":31,"text":265,"correct":26},"主持或授权监理工程师主持设计交底",{"key":34,"text":267,"correct":26},"总监理工程师有权撤换承建单位项目负责人",{"id":269,"libraryId":5,"type":15,"typeLabel":16,"stem":270,"options":271,"answer":282,"analysis":37},1151942,"下列有关监理资格取得的说法，正确的是（ ）。",[272,274,276,278,280],{"key":20,"text":273,"correct":26},"取得监理员从业资格，由有审批管辖权的中介机构或行业自律组织审批，并颁发《水利工程建设监理员资格证书》",{"key":24,"text":275,"correct":26},"取得监理工程师资格，须经中国水利工程协会组织的资格考试合格，并颁发《水利工程建设监理工程师资格证书》",{"key":28,"text":277,"correct":26},"取得监理工程师注册执业资格，须获得国务院水行政主管部门批准注册并颁发《水利工程建设监理工程师注册证书》",{"key":31,"text":279,"correct":22},"取得总监理工程师岗位资格，须经中国水利工程协会组织的资格考试合格，由中国水利工程协会审批并颁发《水利工程建设总监理工程师资格证书》",{"key":34,"text":281,"correct":22},"有两个不同专业的监理工程师可在两个监理单位申请注册","ABC",{"id":284,"libraryId":5,"type":15,"typeLabel":16,"stem":285,"options":286,"answer":81,"analysis":37},1151943,"水利工程施工监理专业乙级资质的监理单位，可以承担监理业务有（ ）。",[287,289,291,293,295],{"key":20,"text":288,"correct":26},"大（2）型水闸",{"key":24,"text":290,"correct":22},"装机150万kW的水电站",{"key":28,"text":292,"correct":26},"2级堤防工程",{"key":31,"text":294,"correct":22},"装机流量300m3\u002Fs的泵站",{"key":34,"text":296,"correct":26},"库容6亿m3的水库",{"id":298,"libraryId":5,"type":15,"typeLabel":16,"stem":299,"options":300,"answer":311,"analysis":37},1151944,"根据《水利部关于修改＜水利工程建设监理单位资质管理办法＞的决定》（水利部令第40号），水利工程建设监理单位资质等级分甲、乙、丙3级的专业是（ ）。",[301,303,305,307,309],{"key":20,"text":302,"correct":26},"水利工程施工",{"key":24,"text":304,"correct":26},"水土保持工程施工",{"key":28,"text":306,"correct":22},"机电及金属结构设备制造",{"key":31,"text":308,"correct":22},"环境保护",{"key":34,"text":310,"correct":22},"机电及金属结构设备安装","AB",{"id":313,"libraryId":5,"type":15,"typeLabel":16,"stem":314,"options":315,"answer":322,"analysis":37},1151945,"根据《水利工程建设监理单位资质管理办法》（水利部令第29号公布，第40号修改），水利工程建设监理单位资质分为（ ）专业。",[316,317,318,319,321],{"key":20,"text":302,"correct":26},{"key":24,"text":304,"correct":26},{"key":28,"text":306,"correct":26},{"key":31,"text":320,"correct":26},"水利工程建设环境保护",{"key":34,"text":310,"correct":22},"ABCD",{"id":324,"libraryId":5,"type":15,"typeLabel":16,"stem":325,"options":326,"answer":311,"analysis":37},1151946,"水利工程建设监理专业资质等级目前分为三个等级的专业有（ ）。",[327,329,331,333,335],{"key":20,"text":328,"correct":26},"水利工程施工监理",{"key":24,"text":330,"correct":26},"水土保持工程施工监理",{"key":28,"text":332,"correct":22},"机电及金属结构设备制造监理",{"key":31,"text":334,"correct":22},"水利工程建设环境保护监理",{"key":34,"text":336,"correct":22},"工程咨询",{"id":338,"libraryId":5,"type":15,"typeLabel":16,"stem":339,"options":340,"answer":81,"analysis":37},1151947,"根据《水利工程施工监理规范》SL288-2014水利工程建设项目施工监理的主要工作制度有（ ）。",[341,343,345,347,349],{"key":20,"text":342,"correct":26},"技术文件审批制度",{"key":24,"text":344,"correct":22},"平行检测制度",{"key":28,"text":346,"correct":26},"工程验收制度",{"key":31,"text":348,"correct":22},"巡视检测制度",{"key":34,"text":350,"correct":26},"会议制度",{"id":352,"libraryId":5,"type":15,"typeLabel":16,"stem":353,"options":354,"answer":96,"analysis":37},1151948,"根据《水利工程施工监理规范》SL288-2014，水利工程建设项目施工监理的主要工作制度有（ ）。",[355,357,359,361,363],{"key":20,"text":356,"correct":22},"周例会制度",{"key":24,"text":358,"correct":26},"工程计量付款签证制度",{"key":28,"text":360,"correct":22},"旁站监理制度",{"key":31,"text":362,"correct":26},"监理报告制度",{"key":34,"text":364,"correct":26},"技术文件审核、审批制度",{"id":366,"libraryId":5,"type":15,"typeLabel":16,"stem":367,"options":368,"answer":379,"analysis":37},1151949,"下列有关水力发电工程分包管理的说法，正确的是（ ）。",[369,371,373,375,377],{"key":20,"text":370,"correct":26},"监理机构应对承建单位提出允许分包的工程项目的分包申请予以审查",{"key":24,"text":372,"correct":22},"分包项目的工程质量检验、工程变更以及合同支付不需通过承建单位向监理机构申报",{"key":28,"text":374,"correct":26},"分包项目的施工措施计划、开工申报需通过承建单位向监理机构申报",{"key":31,"text":376,"correct":26},"除非业主授权或工程承建合同文件另有规定，否则监理机构不受理承建单位与分包单位之间的分包合同纠纷",{"key":34,"text":378,"correct":22},"监理机构应及时受理承建单位与分包单位之间的分包合同纠纷，并协助解决","ACD",{"id":381,"libraryId":5,"type":15,"typeLabel":16,"stem":382,"options":383,"answer":394,"analysis":37},1151950,"保留金的支付时间一般在（ ）。",[384,386,388,390,392],{"key":20,"text":385,"correct":22},"合同项目完工并终止后",{"key":24,"text":387,"correct":26},"合同项目完工并签发工程移交证书之后",{"key":28,"text":389,"correct":26},"工程缺陷责任期满之后",{"key":31,"text":391,"correct":22},"最终决算时",{"key":34,"text":393,"correct":22},"工程竣下验收后","BC",{"id":396,"libraryId":5,"type":15,"typeLabel":16,"stem":397,"options":398,"answer":66,"analysis":37},1151951,"工程变更根据其性质与对工程项目的影响程度，一般分为（ ）。",[399,401,403,405,407],{"key":20,"text":400,"correct":26},"重大工程变更",{"key":24,"text":402,"correct":26},"较大工程变更",{"key":28,"text":404,"correct":26},"一般工程变更",{"key":31,"text":406,"correct":22},"主要工程变更",{"key":34,"text":408,"correct":26},"常规工程变更",{"id":410,"libraryId":5,"type":15,"typeLabel":16,"stem":411,"options":412,"answer":197,"analysis":37},1151952,"工程施工阶段监理机构工程合同费用控制的主要任务包含（ ）。",[413,415,417,419,421],{"key":20,"text":414,"correct":26},"协助业主编制分年或单项工程项目的合同支付资金计划",{"key":24,"text":416,"correct":26},"对工程变更、工期调整申报的经济合理性进行审议并提出审议意见",{"key":28,"text":418,"correct":22},"根据市场情况，有效控制承建单位的材料定购价格",{"key":31,"text":420,"correct":26},"进行已完成实物量的支付计量",{"key":34,"text":422,"correct":26},"根据工程承建合同文件规定受理合同索赔",{"id":424,"libraryId":5,"type":15,"typeLabel":16,"stem":425,"options":426,"answer":437,"analysis":37},1151953,"下列关于水力发电工程合同商务管理的说法，正确的是（ ）。",[427,429,431,433,435],{"key":20,"text":428,"correct":26},"分包项目的施工措施计划、开工申报等应通过承包单位向监理申报",{"key":24,"text":430,"correct":22},"承建单位与分包单位之间的合同纠纷应由监理机构裁定",{"key":28,"text":432,"correct":22},"监理与设计单位的关系是监理与被监理的关系",{"key":31,"text":434,"correct":22},"施工不符合设计要求时，设计单位可直接向承建单位发出指示",{"key":34,"text":436,"correct":26},"项目法人不得擅自变更总监理工程师的指令","AE",{"id":439,"libraryId":5,"type":15,"typeLabel":16,"stem":440,"options":441,"answer":36,"analysis":37},1151954,"监理机构施工阶段进度控制的主要任务包含（ ）。",[442,444,446,448,450],{"key":20,"text":443,"correct":22},"控制性总进度计划的审批",{"key":24,"text":445,"correct":26},"协助业主编制工程控制性总进度计划",{"key":28,"text":447,"correct":26},"审查承建单位报送的施工进度计划",{"key":31,"text":449,"correct":26},"依据工程监理合同，向业主编报进度报表",{"key":34,"text":451,"correct":26},"向业主提供关于施工进度的建议及分析报告",{"id":453,"libraryId":5,"type":15,"typeLabel":16,"stem":454,"options":455,"answer":466,"analysis":37},1151955,"一般情况下，水力发电工程质量检验的分级包括（ ）。",[456,458,460,462,464],{"key":20,"text":457,"correct":22},"设计单元工程",{"key":24,"text":459,"correct":26},"单位工程",{"key":28,"text":461,"correct":26},"分部工程",{"key":31,"text":463,"correct":22},"分项工程",{"key":34,"text":465,"correct":26},"单元工程","BCE",{"id":468,"libraryId":5,"type":15,"typeLabel":16,"stem":469,"options":470,"answer":481,"analysis":37},1151956,"申办下序单元工程的开工签证，承建单位必须凭上序单元工程的（ ）进行申办。",[471,473,475,477,479],{"key":20,"text":472,"correct":22},"开工签证",{"key":24,"text":474,"correct":22},"完工报告",{"key":28,"text":476,"correct":26},"施工质量终检合格证",{"key":31,"text":478,"correct":26},"质量评定表",{"key":34,"text":480,"correct":22},"施工作业措施计划","CD",{"id":483,"libraryId":5,"type":15,"typeLabel":16,"stem":484,"options":485,"answer":322,"analysis":37},1151957,"施工监理工程质量控制的基本依据包含（ ）。",[486,488,490,492,494],{"key":20,"text":487,"correct":26},"工程承建合同文件及其技术条件与技术规范",{"key":24,"text":489,"correct":26},"国家或国家部门颁发的法律与行政法规",{"key":28,"text":491,"correct":26},"经监理机构签发实施的设计图纸与设计技术要求",{"key":31,"text":493,"correct":26},"国家或国家部门颁发的技术规程、规范",{"key":34,"text":495,"correct":22},"业主制定的质量检验标准及质量检验办法",{"id":497,"libraryId":5,"type":15,"typeLabel":16,"stem":498,"options":499,"answer":81,"analysis":37},1151958,"工程施工实施阶段监理进行质量控制的基本内容有（ ）。",[500,502,504,506,508],{"key":20,"text":501,"correct":26},"工程项目划分",{"key":24,"text":503,"correct":22},"检查施工进场设备",{"key":28,"text":505,"correct":26},"工程质量检验",{"key":31,"text":507,"correct":22},"工程验收与移交",{"key":34,"text":509,"correct":26},"质量事故处理",{"id":511,"libraryId":5,"type":15,"typeLabel":16,"stem":512,"options":513,"answer":311,"analysis":37},1151959,"水利工程质量监督员分为（ ）。",[514,516,518,520,522],{"key":20,"text":515,"correct":26},"专职",{"key":24,"text":517,"correct":26},"兼职",{"key":28,"text":519,"correct":22},"特聘",{"key":31,"text":521,"correct":22},"专家",{"key":34,"text":523,"correct":22},"工程设计人员",{"id":525,"libraryId":5,"type":15,"typeLabel":16,"stem":526,"options":527,"answer":311,"analysis":37},1151960,"水电建设工程施工必须坚持的方针是（ ）。",[528,530,532,534,536],{"key":20,"text":529,"correct":26},"安全第一",{"key":24,"text":531,"correct":26},"预防为主",{"key":28,"text":533,"correct":22},"安全生产",{"key":31,"text":535,"correct":22},"人人有责",{"key":34,"text":537,"correct":22},"质量重于泰山",{"id":539,"libraryId":5,"type":15,"typeLabel":16,"stem":540,"options":541,"answer":322,"analysis":37},1151961,"根据《水法》规定，水资源战略规划包括（ ）。",[542,544,546,548,550],{"key":20,"text":543,"correct":26},"流域综合规划",{"key":24,"text":545,"correct":26},"流域专业规划",{"key":28,"text":547,"correct":26},"区域综合规划",{"key":31,"text":549,"correct":26},"区域专业规划",{"key":34,"text":551,"correct":22},"区域发展规划",{"id":553,"libraryId":5,"type":15,"typeLabel":16,"stem":554,"options":555,"answer":566,"analysis":37},1151962,"根据《水法》规定，水资源规划按层次分为（ ）。",[556,558,560,562,564],{"key":20,"text":557,"correct":26},"全国战略规划",{"key":24,"text":559,"correct":22},"全省战略规划",{"key":28,"text":561,"correct":22},"全县战略规划",{"key":31,"text":563,"correct":26},"流域规划",{"key":34,"text":565,"correct":26},"区域规划","ADE",{"id":568,"libraryId":5,"type":15,"typeLabel":16,"stem":569,"options":570,"answer":579,"analysis":37},1151963,"开发、利用、节约、保护水资源和防治水害的统一规划分为（ ）。",[571,573,575,576,578],{"key":20,"text":572,"correct":22},"国家规划",{"key":24,"text":574,"correct":22},"地方规划",{"key":28,"text":563,"correct":26},{"key":31,"text":577,"correct":22},"整体规划",{"key":34,"text":565,"correct":26},"CE",{"id":581,"libraryId":5,"type":15,"typeLabel":16,"stem":582,"options":583,"answer":394,"analysis":37},1151964,"水资源规划的关系是（ ）。",[584,586,588,590,592],{"key":20,"text":585,"correct":22},"地方规划应当服从国家规划",{"key":24,"text":587,"correct":26},"区域规划应当服从流域规划",{"key":28,"text":589,"correct":26},"专业规划应当服从综合规划",{"key":31,"text":591,"correct":22},"局部规划应当服从整体规划",{"key":34,"text":593,"correct":22},"流域规划应当服从综合规划",{"id":595,"libraryId":5,"type":15,"typeLabel":16,"stem":596,"options":597,"answer":96,"analysis":37},1151965,"下列关于防洪规划、流域综合规划、区域综合规划的说法，正确的是（ ）。",[598,600,602,604,606],{"key":20,"text":599,"correct":22},"所在流域、区域的综合规划应当服从防洪规划",{"key":24,"text":601,"correct":26},"防洪规划应当服从所在流域、区域的综合规划",{"key":28,"text":603,"correct":22},"所在流域的流域防洪规划应当服从区域防洪规划",{"key":31,"text":605,"correct":26},"区域防洪规划应当服从所在流域的流域防洪规划",{"key":34,"text":607,"correct":26},"防洪规划是江河、湖泊治理和防洪工程设施建设的基本依据",{"id":609,"libraryId":5,"type":15,"typeLabel":16,"stem":610,"options":611,"answer":197,"analysis":37},1151966,"在防洪工程设施保护范围内，禁止进行（ ）。",[612,614,616,618,620],{"key":20,"text":613,"correct":26},"爆破",{"key":24,"text":615,"correct":26},"打井",{"key":28,"text":617,"correct":22},"捕鱼",{"key":31,"text":619,"correct":26},"取土",{"key":34,"text":621,"correct":26},"采石",{"id":623,"libraryId":5,"type":15,"typeLabel":16,"stem":624,"options":625,"answer":197,"analysis":37},1151967,"在水工程保护范围内，禁止从事影响水工程运行和危害水工程安全的活动有（ ）。",[626,627,628,629,630],{"key":20,"text":613,"correct":26},{"key":24,"text":615,"correct":26},{"key":28,"text":617,"correct":22},{"key":31,"text":619,"correct":26},{"key":34,"text":621,"correct":26},{"id":632,"libraryId":5,"type":15,"typeLabel":16,"stem":633,"options":634,"answer":645,"analysis":37},1151968,"根据《水法》，在河道管理范围内禁止性进行的活动包括（ ）。",[635,637,639,641,643],{"key":20,"text":636,"correct":22},"建设桥梁",{"key":24,"text":638,"correct":26},"堆放阻碍行洪的物体",{"key":28,"text":640,"correct":22},"铺设跨河管道",{"key":31,"text":642,"correct":22},"铺设跨河电缆",{"key":34,"text":644,"correct":26},"弃置阻碍行洪的物体","BE",{"id":647,"libraryId":5,"type":15,"typeLabel":16,"stem":648,"options":649,"answer":197,"analysis":37},1151969,"《防洪法》规定，有堤防的河道、湖泊，其管理范围为（ ）。",[650,652,654,656,658],{"key":20,"text":651,"correct":26},"两岸堤防之间的行洪区",{"key":24,"text":653,"correct":26},"堤防本身",{"key":28,"text":655,"correct":22},"跨河的桥梁、水闸等建筑物",{"key":31,"text":657,"correct":26},"护堤地",{"key":34,"text":659,"correct":26},"两岸堤防之间的水域、沙洲、滩地",{"id":661,"libraryId":5,"type":15,"typeLabel":16,"stem":662,"options":663,"answer":579,"analysis":37},1151970,"有堤防的河道、湖泊的管理范围为（ ）。",[664,666,668,669,671],{"key":20,"text":665,"correct":22},"引水建筑物占地",{"key":24,"text":667,"correct":22},"排水建筑物占地",{"key":28,"text":657,"correct":26},{"key":31,"text":670,"correct":22},"渔业建筑工程占地",{"key":34,"text":672,"correct":26},"两岸堤防之间的水域、沙洲、滩地、行洪区和堤防",{"id":674,"libraryId":5,"type":15,"typeLabel":16,"stem":675,"options":676,"answer":96,"analysis":37},1151971,"在水生生物洄游通道、通航或者竹木流放的河流上修建永久性拦河闸坝，建设单位应当同时修建（ ），或者经国务院授权的部门批准采取其他补救措施。",[677,679,681,683,685],{"key":20,"text":678,"correct":22},"溢流设施",{"key":24,"text":680,"correct":26},"过鱼设施",{"key":28,"text":682,"correct":22},"防洪设施",{"key":31,"text":684,"correct":26},"过木设施",{"key":34,"text":686,"correct":26},"过船设施",{"id":688,"libraryId":5,"type":15,"typeLabel":16,"stem":689,"options":690,"answer":197,"analysis":37},1151972,"下列关于《水法》和《取水许可制度实施办法》的相关说法，正确的是（ ）。",[691,693,695,697,699],{"key":20,"text":692,"correct":26},"《水法》属于基本法",{"key":24,"text":694,"correct":26},"使用本集体经济组织的水塘、水库中的水，可不实行取水许可制度和有偿使用制度",{"key":28,"text":696,"correct":22},"逾期不缴纳水资源费的应加收滞纳金，而不罚款",{"key":31,"text":698,"correct":26},"为紧急公共利益取水，可不必向人民政府水行政主管部门申请取水许可证",{"key":34,"text":700,"correct":26},"因建设桥梁、码头等设施而损坏原河道范围内的违法工程，可不赔偿",{"id":702,"libraryId":5,"type":15,"typeLabel":16,"stem":703,"options":704,"answer":322,"analysis":37},1151973,"防御洪水方案必须由国家防汛总指挥部制定，报国务院批准后施行的江河有（ ）。",[705,707,709,711,713],{"key":20,"text":706,"correct":26},"长江",{"key":24,"text":708,"correct":26},"黄河",{"key":28,"text":710,"correct":26},"淮河",{"key":31,"text":712,"correct":26},"海河",{"key":34,"text":714,"correct":22},"太湖",{"id":716,"libraryId":5,"type":15,"typeLabel":16,"stem":717,"options":718,"answer":311,"analysis":37},1151974,"我国可设立防汛指挥机构的流域有（ ）。",[719,720,721,722,723],{"key":20,"text":706,"correct":26},{"key":24,"text":708,"correct":26},{"key":28,"text":710,"correct":22},{"key":31,"text":712,"correct":22},{"key":34,"text":724,"correct":22},"珠江",[726,730,733,736,739,742],{"id":727,"name":728,"category":7,"favorite":729},1,"领导干部任职前廉政法规知识测试题",92,{"id":731,"name":732,"category":7,"favorite":727},595,"建筑结构与设备",{"id":734,"name":735,"category":7,"favorite":727},715,"招标采购专业知识与法律法规",{"id":737,"name":738,"category":7,"favorite":727},848,"市政方向-通用基础",{"id":740,"name":741,"category":7,"favorite":8},534,"BIM工程师",{"id":743,"name":741,"category":7,"favorite":8},535]