[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-803-38":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":718},{"id":5,"name":6,"category":7,"favorite":8},803,"一建水利水电工程实务","建筑工程",0,38,50,1981,[13,38,53,68,83,98,112,127,142,156,170,185,200,214,227,242,257,272,286,300,312,326,340,354,368,382,397,411,426,439,453,465,479,493,507,521,536,550,564,579,593,607,621,635,649,661,675,687,697,707],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1151875,2,"多选题","根据《水利水电建设工程验收规程》SL223-2008，下列（ ）代表可进入竣工验收委员会。",[19,23,26,30,33],{"key":20,"text":21,"correct":22},"A","地方政府",true,{"key":24,"text":25,"correct":22},"B","水行政主管部门",{"key":27,"text":28,"correct":29},"C","项目法人",false,{"key":31,"text":32,"correct":22},"D","投资方",{"key":34,"text":35,"correct":22},"E","质量监督单位","ABDE","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},1151876,"竣工验收会议的主要工作包括（ ）。",[42,44,46,48,50],{"key":20,"text":43,"correct":22},"听取项目法人“工程建设管理工作报告”",{"key":24,"text":45,"correct":22},"听取竣工技术预验收工作报告",{"key":27,"text":47,"correct":22},"听取验收委员会确定的其他报告",{"key":31,"text":49,"correct":29},"检查工程建设和运行情况、协调处理有关问题",{"key":34,"text":51,"correct":22},"讨论并通过“竣工验收鉴定书”","ABCE",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":37},1151877,"下列关于竣工技术预验收的说法，正确的是（ ）。",[57,59,61,63,65],{"key":20,"text":58,"correct":22},"工程竣工技术预验收时，工程主要建设内容已按批准设计全部完成",{"key":24,"text":60,"correct":22},"工程投资已基本到位，并具备财务决算条件",{"key":27,"text":62,"correct":29},"工程竣工技术预验收由项目法人主持",{"key":31,"text":64,"correct":29},"不进行工程竣工技术预验收须经政府质量监督部门批准",{"key":34,"text":66,"correct":22},"竣工技术预验收工作报告是竣工验收鉴定书的附件","ABE",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":82,"analysis":37},1151878,"根据《农田水利条例》（国务院令第669号）第十六条规定，政府投资建设的农田水利工程由县级以上人民政府有关部门组织竣工验收，并邀请有关专家和（ ）参加。",[72,74,76,78,80],{"key":20,"text":73,"correct":22},"农村集体经济组织",{"key":24,"text":75,"correct":29},"乡镇领导",{"key":27,"text":77,"correct":22},"农民用水合作组织",{"key":31,"text":79,"correct":22},"农民代表",{"key":34,"text":81,"correct":29},"监理单位","ACD",{"id":84,"libraryId":5,"type":15,"typeLabel":16,"stem":85,"options":86,"answer":97,"analysis":37},1151879,"下列关于水电站机组启动（阶段）验收的说法，正确的是（ ）。",[87,89,91,93,95],{"key":20,"text":88,"correct":22},"水电站机组启动验收的各台机组运行时间为投入系统带额定出力连续运行72h",{"key":24,"text":90,"correct":29},"由于负荷不足或水库水位不够等原因造成机组不能达到额定出力时，验收委员会可根据当时的具体情况，确定机组应带的最大负荷",{"key":27,"text":92,"correct":22},"水电站每台机组投入运行前，均应进行机组启动（阶段）验收",{"key":31,"text":94,"correct":29},"水电站的机组启动验收由项目法人主持",{"key":34,"text":96,"correct":22},"水电站的第一台（次）和最后一台（次）机组启动验收由竣工验收主持单位或其委托单位主持","ACE",{"id":99,"libraryId":5,"type":15,"typeLabel":16,"stem":100,"options":101,"answer":36,"analysis":37},1151880,"根据工程建设需要，当工程建设达到一定关键阶段时（如截流、水库蓄水、机组启动、输水工程通水等），应进行阶段验收。阶段验收原则上应根据工程建设的需要。阶段验收的主要工作是（ ）。",[102,104,106,108,110],{"key":20,"text":103,"correct":22},"检查已完工程的质量和形象面貌",{"key":24,"text":105,"correct":22},"检查在建工程建设情况",{"key":27,"text":107,"correct":29},"按现行国家或行业技术标准，评定工程质量等级",{"key":31,"text":109,"correct":22},"检查拟投入使用工程是否具备运用条件",{"key":34,"text":111,"correct":22},"对验收遗留问题提出处理要求",{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":126,"analysis":37},1151881,"下列关于阶段验收的说法，正确的是（ ）。",[116,118,120,122,124],{"key":20,"text":117,"correct":22},"工程截流前，应进行截流前（阶段）验收",{"key":24,"text":119,"correct":22},"水电站每台机组投入运行前，均应进行机组启动验收",{"key":27,"text":121,"correct":29},"大型枢纽工程在截流、蓄水等阶段验收前，必须先进行技术性初步验收",{"key":31,"text":123,"correct":22},"泵站每台机组投入运行前，均应进行机组启动（阶段）验收",{"key":34,"text":125,"correct":29},"对于总台数少于3台的泵站，可待全部机组安装完成后，再进行机组启动验收","ABD",{"id":128,"libraryId":5,"type":15,"typeLabel":16,"stem":129,"options":130,"answer":141,"analysis":37},1151882,"下列验收属于阶段验收的是（ ）。",[131,133,135,137,139],{"key":20,"text":132,"correct":22},"枢纽工程导（截）流验收",{"key":24,"text":134,"correct":22},"水库下闸蓄水验收",{"key":27,"text":136,"correct":22},"引（调）排水工程通水验收",{"key":31,"text":138,"correct":22},"水电站（泵站）首（末）台机组启动验收",{"key":34,"text":140,"correct":29},"设计单元工程验收","ABCD",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":52,"analysis":37},1151883,"合同工程完工验收应具备的条件有（ ）。",[146,148,150,152,154],{"key":20,"text":147,"correct":22},"合同范围内的工程项目已按合同完成",{"key":24,"text":149,"correct":22},"工程已按规定进行了有关验收",{"key":27,"text":151,"correct":22},"观测仪器和设备已测得初始值及施工各项观测值",{"key":31,"text":153,"correct":29},"工程质量缺陷已按规定进行备案",{"key":34,"text":155,"correct":22},"工程完工结算已完成",{"id":157,"libraryId":5,"type":15,"typeLabel":16,"stem":158,"options":159,"answer":141,"analysis":37},1151884,"下列属于单位工程投入使用验收工作内容的是（ ）。",[160,162,164,166,168],{"key":20,"text":161,"correct":22},"检查工程是否按批准的设计内容完成",{"key":24,"text":163,"correct":22},"评定工程施工质量等级",{"key":27,"text":165,"correct":22},"对验收中发现的问题提出处理意见",{"key":31,"text":167,"correct":22},"检查工程是否具备安全运行条件",{"key":34,"text":169,"correct":29},"主持单位工程移交",{"id":171,"libraryId":5,"type":15,"typeLabel":16,"stem":172,"options":173,"answer":184,"analysis":37},1151885,"下列关于单位工程投入使用验收的说法，正确的是（ ）。",[174,176,178,180,182],{"key":20,"text":175,"correct":22},"在竣工验收前已经建成并能够发挥效益，需要提前投入使用的单位工程，在投入使用前应进行单位工程投入使用验收",{"key":24,"text":177,"correct":29},"单位工程投入使用验收不应由项目法人主持",{"key":27,"text":179,"correct":22},"单位工程投入使用验收工作的成果是“单位工程验收鉴定书”",{"key":31,"text":181,"correct":22},"单位工程需移交运行管理单位时，项目法人与运行管理单位已签订单位工程提前使用协议书",{"key":34,"text":183,"correct":22},"单位工程投入使用验收可由竣工验收主持单位或其委托单位主持","ACDE",{"id":186,"libraryId":5,"type":15,"typeLabel":16,"stem":187,"options":188,"answer":199,"analysis":37},1151886,"分部工程验收工作组由项目法人或监理主持，（ ）等单位的代表组成。",[189,191,193,195,197],{"key":20,"text":190,"correct":22},"设计",{"key":24,"text":192,"correct":22},"施工",{"key":27,"text":194,"correct":22},"运行管理单位视情况而定",{"key":31,"text":196,"correct":29},"主管部门",{"key":34,"text":198,"correct":29},"质量检测部门","ABC",{"id":201,"libraryId":5,"type":15,"typeLabel":16,"stem":202,"options":203,"answer":52,"analysis":37},1151887,"下列关于分部工程验收的说法，正确的是（ ）。",[204,206,208,210,212],{"key":20,"text":205,"correct":22},"分部工程验收时所有单元工程已经完建且质量全部合格",{"key":24,"text":207,"correct":22},"分部工程验收由验收工作组负责，分部工程验收工作组由项目法人或监理主持",{"key":27,"text":209,"correct":22},"分部工程验收的有关资料必须按照竣工验收标准制备",{"key":31,"text":211,"correct":29},"分部工程验收应有设计、施工、运行管理单位的右关技术人员参加",{"key":34,"text":213,"correct":22},"分部工程验收的成果是“分部工程验收鉴定书”",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":67,"analysis":37},1151888,"分部工程验收的主要工作是（ ）。",[218,220,221,223,225],{"key":20,"text":219,"correct":22},"鉴定工程是否达到设计标准",{"key":24,"text":107,"correct":22},{"key":27,"text":222,"correct":29},"提出工程调度运用方案",{"key":31,"text":224,"correct":29},"分析投资效益",{"key":34,"text":226,"correct":22},"对验收遗留问题提出处理意见",{"id":228,"libraryId":5,"type":15,"typeLabel":16,"stem":229,"options":230,"answer":241,"analysis":37},1151889,"水利工程建设质量监督巡查对施工单位工程质量评定工作主要是检查（ ）。",[231,233,235,237,239],{"key":20,"text":232,"correct":29},"是否实行三检制",{"key":24,"text":234,"correct":29},"是否服从项目法人安排",{"key":27,"text":236,"correct":29},"是否服从监理安排",{"key":31,"text":238,"correct":22},"是否规范",{"key":34,"text":240,"correct":22},"是否及时","DE",{"id":243,"libraryId":5,"type":15,"typeLabel":16,"stem":244,"options":245,"answer":256,"analysis":37},1151890,"根据《水利水电建设工程验收规程》SL223-2008，验收资料制备由项目法人负责统一组织，有关单位应按项目法人的要求及时完成。验收资料分为（ ）。",[246,248,250,252,254],{"key":20,"text":247,"correct":29},"归档资料",{"key":24,"text":249,"correct":22},"所需提供资料",{"key":27,"text":251,"correct":22},"所需备查资料",{"key":31,"text":253,"correct":29},"保存资料",{"key":34,"text":255,"correct":29},"参建单位资料","BC",{"id":258,"libraryId":5,"type":15,"typeLabel":16,"stem":259,"options":260,"answer":271,"analysis":37},1151891,"工程验收中政府验收包括（ ）。",[261,263,265,267,269],{"key":20,"text":262,"correct":29},"投入使用验收",{"key":24,"text":264,"correct":29},"单位工程验收",{"key":27,"text":266,"correct":22},"专项验收",{"key":31,"text":268,"correct":22},"竣工验收",{"key":34,"text":270,"correct":22},"阶段验收","CDE",{"id":273,"libraryId":5,"type":15,"typeLabel":16,"stem":274,"options":275,"answer":141,"analysis":37},1151892,"属于验收工作依据的是（ ）。",[276,278,280,282,284],{"key":20,"text":277,"correct":22},"有关法律、规章和技术标准，主管部门有关文件",{"key":24,"text":279,"correct":22},"批准的设计文件及相应设计变更、修改文件，施工合同",{"key":27,"text":281,"correct":22},"监理签发的施工图纸和说明",{"key":31,"text":283,"correct":22},"设备技术说明书等",{"key":34,"text":285,"correct":29},"施工单位的施工组织设计",{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":52,"analysis":37},1151893,"根据《水利水电建设工程验收规程》SL223-2008，下列关于工程验收基本要求的说法，正确的有（ ）。",[290,292,294,296,298],{"key":20,"text":291,"correct":22},"阶段验收和单位工程验收应有水利水电工程质量监督单位的工程质量评价意见",{"key":24,"text":293,"correct":22},"竣工验收必须有水利水电工程质量监督单位的工程质量评定报告；竣工验收委员会在其基础上鉴定工程质量等级",{"key":27,"text":295,"correct":22},"验收委员会（组）成员必须在验收成果文件上签字；验收委员（组员）的保留意见应在验收鉴定书或签证中明确记载",{"key":31,"text":297,"correct":29},"验收工作由验收委员会（组）负责，验收结论必须经3\u002F4以上验收委员会成员同意",{"key":34,"text":299,"correct":22},"验收资料制备由项目法人负责统一组织，有关单位应按项目法人的要求及时完成",{"id":301,"libraryId":5,"type":15,"typeLabel":16,"stem":302,"options":303,"answer":141,"analysis":37},1151894,"工程验收中法人验收包括（ ）。",[304,306,308,309,311],{"key":20,"text":305,"correct":22},"分部工程验收",{"key":24,"text":307,"correct":22},"水电站（泵站）中间机组启动验收",{"key":27,"text":264,"correct":22},{"key":31,"text":310,"correct":22},"合同工程完工验收",{"key":34,"text":268,"correct":29},{"id":313,"libraryId":5,"type":15,"typeLabel":16,"stem":314,"options":315,"answer":241,"analysis":37},1151895,"根据《水利水电工程建设工程验收规程》SL223-2008的规定，水利水电工程验收按验收主持单位可以分为（ ）。",[316,318,320,322,324],{"key":20,"text":317,"correct":29},"施工单位验收",{"key":24,"text":319,"correct":29},"监理单位验收",{"key":27,"text":321,"correct":29},"监督单位验收",{"key":31,"text":323,"correct":22},"法人验收",{"key":34,"text":325,"correct":22},"政府验收",{"id":327,"libraryId":5,"type":15,"typeLabel":16,"stem":328,"options":329,"answer":52,"analysis":37},1151896,"竣工验收申请报告的主要内容包括（ ）。",[330,332,334,336,338],{"key":20,"text":331,"correct":22},"项目基本情况",{"key":24,"text":333,"correct":22},"工程建设运行情况",{"key":27,"text":335,"correct":22},"专项验收计划",{"key":31,"text":337,"correct":29},"专项验收完成情况",{"key":34,"text":339,"correct":22},"竣工验收总体安排",{"id":341,"libraryId":5,"type":15,"typeLabel":16,"stem":342,"options":343,"answer":353,"analysis":37},1151897,"水电工程竣工验收总结报告的主要内容应包括（ ）。",[344,345,347,349,351],{"key":20,"text":339,"correct":29},{"key":24,"text":346,"correct":22},"工程概述",{"key":27,"text":348,"correct":22},"各专项验收鉴定书的主要结论",{"key":31,"text":350,"correct":22},"专项验收所提问题和建议的处理情况",{"key":34,"text":352,"correct":22},"遗留特殊单项工程的竣工验收计划","BCDE",{"id":355,"libraryId":5,"type":15,"typeLabel":16,"stem":356,"options":357,"answer":36,"analysis":37},1151898,"根据《水电工程验收管理办法》（2015年修订版），以下关于枢纽工程专项验收的说法，正确的是（ ）。",[358,360,362,364,366],{"key":20,"text":359,"correct":22},"项目法人应在枢纽工程专项验收计划前3个月报送枢纽工程专项验收申请",{"key":24,"text":361,"correct":22},"枢纽工程专项验收可组织专家组进行现场检查和技术预验收",{"key":27,"text":363,"correct":29},"验收委员会主任委员应由验收主持单位主要负责同志担任",{"key":31,"text":365,"correct":22},"枢纽工程专项验收工作完成后，应出具枢纽工程专项验收鉴定书",{"key":34,"text":367,"correct":22},"水电工程分期建设的，可根据工程建设进度分期或一次性进行验收",{"id":369,"libraryId":5,"type":15,"typeLabel":16,"stem":370,"options":371,"answer":353,"analysis":37},1151899,"枢纽工程专项验收委员会成员包括（ ）。",[372,374,376,378,380],{"key":20,"text":373,"correct":29},"国家能源局",{"key":24,"text":375,"correct":22},"技术主持单位",{"key":27,"text":377,"correct":22},"省级人民政府能源主管部门",{"key":31,"text":379,"correct":22},"项目法人所属计划单列企业集团",{"key":34,"text":381,"correct":22},"有关专家",{"id":383,"libraryId":5,"type":15,"typeLabel":16,"stem":384,"options":385,"answer":396,"analysis":37},1151900,"水电工程各阶段验收申请应向省级人民政府能源主管部门报送，下列关于抄送单位的说法，正确的是（ ）。",[386,388,390,392,394],{"key":20,"text":387,"correct":22},"工程蓄水验收申请抄送验收主持单位",{"key":24,"text":389,"correct":22},"机组启动验收申请抄送电网经营管理单位",{"key":27,"text":391,"correct":29},"工程截流验收申请抄送验牧主持单位",{"key":31,"text":393,"correct":29},"工程蓄水验收申请抄送电网经营管理单位",{"key":34,"text":395,"correct":29},"机组启动验收申请抄送验收主持单位","AB",{"id":398,"libraryId":5,"type":15,"typeLabel":16,"stem":399,"options":400,"answer":97,"analysis":37},1151901,"根据《水电工程验收管理办法》（2015年修订版），水电工程在（ ）时应进行阶段验收。",[401,403,405,407,409],{"key":20,"text":402,"correct":22},"截流",{"key":24,"text":404,"correct":29},"主体工程完工",{"key":27,"text":406,"correct":22},"下闸蓄水",{"key":31,"text":408,"correct":29},"机电安装工程完工",{"key":34,"text":410,"correct":22},"机组启动",{"id":412,"libraryId":5,"type":15,"typeLabel":16,"stem":413,"options":414,"answer":425,"analysis":37},1151902,"下列人员中，应定期对专项施工方案实施情况进行巡查的有（ ）。",[415,417,419,421,423],{"key":20,"text":416,"correct":29},"项目法人技术负责人",{"key":24,"text":418,"correct":29},"设计代表",{"key":27,"text":420,"correct":22},"总监理工程师",{"key":31,"text":422,"correct":22},"施工单位技术负责人",{"key":34,"text":424,"correct":29},"施工项目负责人","CD",{"id":427,"libraryId":5,"type":15,"typeLabel":16,"stem":428,"options":429,"answer":256,"analysis":37},1151903,"危险性较大的单项工程验收的组织单位包括（ ）。",[430,432,434,435,437],{"key":20,"text":431,"correct":29},"项目法人单位",{"key":24,"text":433,"correct":22},"施工单位",{"key":27,"text":81,"correct":22},{"key":31,"text":436,"correct":29},"勘察单位",{"key":34,"text":438,"correct":29},"设计单位",{"id":440,"libraryId":5,"type":15,"typeLabel":16,"stem":441,"options":442,"answer":241,"analysis":37},1151904,"下列单项工程中，需编制专项施工方案并组织专家审查论证的是（ ）。",[443,445,447,449,451],{"key":20,"text":444,"correct":29},"开挖深度为4m的支护工程",{"key":24,"text":446,"correct":29},"开挖深度为4m的石方开挖工程",{"key":27,"text":448,"correct":29},"搭设高度40m的落地式钢管脚手架工程",{"key":31,"text":450,"correct":22},"采用爆破拆除的工程",{"key":34,"text":452,"correct":22},"文物保护建筑拆除工程",{"id":454,"libraryId":5,"type":15,"typeLabel":16,"stem":455,"options":456,"answer":464,"analysis":37},1151905,"施工单位应根据审查论证报告修改完善专项施工方案，经（ ）审核签字后，方可组织实施。",[457,459,461,462,463],{"key":20,"text":458,"correct":29},"专家组组长",{"key":24,"text":460,"correct":22},"项目法人单位负责人",{"key":27,"text":420,"correct":22},{"key":31,"text":422,"correct":22},{"key":34,"text":424,"correct":29},"BCD",{"id":466,"libraryId":5,"type":15,"typeLabel":16,"stem":467,"options":468,"answer":141,"analysis":37},1151906,"在工程进度曲线中，将实际进度与计划进度进行比较，可以获得的信息是（ ）。",[469,471,473,475,477],{"key":20,"text":470,"correct":22},"实际工程进展速度",{"key":24,"text":472,"correct":22},"进度超前或拖延的时间",{"key":27,"text":474,"correct":22},"工程量的完成情况",{"key":31,"text":476,"correct":22},"后续工程进度预测",{"key":34,"text":478,"correct":29},"各项工作之间的相互搭接关系",{"id":480,"libraryId":5,"type":15,"typeLabel":16,"stem":481,"options":482,"answer":36,"analysis":37},1151907,"水利水电工程施工进度计划常用的表达方法有（ ）。",[483,485,487,489,491],{"key":20,"text":484,"correct":22},"横道图",{"key":24,"text":486,"correct":22},"工程进度曲线",{"key":27,"text":488,"correct":29},"施工强度曲线",{"key":31,"text":490,"correct":22},"形象进度图",{"key":34,"text":492,"correct":22},"网络进度计划",{"id":494,"libraryId":5,"type":15,"typeLabel":16,"stem":495,"options":496,"answer":353,"analysis":37},1151908,"下列关于工程进度横道图的说法，正确的是（ ）。",[497,499,501,503,505],{"key":20,"text":498,"correct":29},"不形象、直观，且难于编制和理解",{"key":24,"text":500,"correct":22},"不能明确反映出各项工作之间错综复杂的相互关系",{"key":27,"text":502,"correct":22},"不能明确地反映出影响工期的关键工作和关键线路",{"key":31,"text":504,"correct":22},"不能反映出工作所具有的机动时间",{"key":34,"text":506,"correct":22},"不能反映工程费用与工期之间的关系",{"id":508,"libraryId":5,"type":15,"typeLabel":16,"stem":509,"options":510,"answer":52,"analysis":37},1151909,"水利水电工程中常用的混凝土骨料预冷方法有（ ）。",[511,513,515,517,519],{"key":20,"text":512,"correct":22},"水冷法",{"key":24,"text":514,"correct":22},"风冷法",{"key":27,"text":516,"correct":22},"真空汽化法",{"key":31,"text":518,"correct":29},"加冰法",{"key":34,"text":520,"correct":22},"液氮预冷法",{"id":522,"libraryId":5,"type":15,"typeLabel":16,"stem":523,"options":524,"answer":535,"analysis":37},1151910,"下列关于砌体工程计量与支付的说法，正确的是（ ）。",[525,527,529,531,533],{"key":20,"text":526,"correct":29},"砌筑工程的砂浆应另行支付",{"key":24,"text":528,"correct":22},"砌筑工程的拉结筋不另行支付",{"key":27,"text":530,"correct":22},"砌筑工程的垫层不另行支付",{"key":31,"text":532,"correct":29},"砌筑工程的伸缩缝、沉降缝应另行支付",{"key":34,"text":534,"correct":22},"砌体建筑物的基础清理和施工排水等工作所需的费用不另行支付","BCE",{"id":537,"libraryId":5,"type":15,"typeLabel":16,"stem":538,"options":539,"answer":141,"analysis":37},1151911,"根据合同技术条款计量和支付规则，闸门的计量和支付规则是（ ）。",[540,542,544,546,548],{"key":20,"text":541,"correct":22},"以施工图纸所示尺寸计算的闸门本体有效重量计量",{"key":24,"text":543,"correct":22},"以吨为单位计量",{"key":27,"text":545,"correct":22},"闸门附件涂装不另行计量",{"key":31,"text":547,"correct":22},"门槽安装按每吨工程单价支付",{"key":34,"text":549,"correct":29},"门槽附件安装另行计量",{"id":551,"libraryId":5,"type":15,"typeLabel":16,"stem":552,"options":553,"answer":199,"analysis":37},1151912,"下列关于混凝土工程计量与支付的说法，正确的是（ ）。",[554,556,558,560,562],{"key":20,"text":555,"correct":22},"承包人进行的各项混凝土试验所需的费用不另行支付",{"key":24,"text":557,"correct":22},"止水、止浆、伸缩缝等应按每米（或平方米）工程单价支付",{"key":27,"text":559,"correct":22},"混凝土温度控制措施费不另行支付",{"key":31,"text":561,"correct":29},"混凝土坝体的接缝灌浆不另行支付",{"key":34,"text":563,"correct":29},"混凝土坝体内预埋排水管所需的费用应另行支付",{"id":565,"libraryId":5,"type":15,"typeLabel":16,"stem":566,"options":567,"answer":578,"analysis":37},1151913,"下列关于工程量计量与支付规则的说法，正确的是（ ）。",[568,570,572,574,576],{"key":20,"text":569,"correct":29},"承包人现场试验室的建设费用，由发包人按实际发生金额支付",{"key":24,"text":571,"correct":22},"除合同另有约定外，承包人根据合同要求完成施工用电设施的建设、移设和拆除工作所需的费用，由发包人按《工程量清单》相应项目的工程单价或总价支付",{"key":27,"text":573,"correct":29},"承包人根据合同要求完成混凝土生产系统的建设和拆除工作所需的费用，已包含在《工程量清单》有效工程量总价中，不另行支付",{"key":31,"text":575,"correct":22},"施工临时设施的废、污水（或废油）处理设施，应分别包含“施工临时设施”各自相关的施工临时设施项目中",{"key":34,"text":577,"correct":22},"临时导流泄水建筑物的运行维护费用包含在“施工期安全防洪度汛”项目总价中，发包人不另行支付","BDE",{"id":580,"libraryId":5,"type":15,"typeLabel":16,"stem":581,"options":582,"answer":578,"analysis":37},1151914,"下列投标报价策略说法，错误的是（ ）。",[583,585,587,589,591],{"key":20,"text":584,"correct":29},"有策略开拓某一地区市场可以低报",{"key":24,"text":586,"correct":22},"投标竞争对手多的工程可以高报",{"key":27,"text":588,"correct":29},"能够早日结账收款的项目可以适当提高单价",{"key":31,"text":590,"correct":22},"招标图纸不明确，估计修改后工程量要增加的，可以降低单价",{"key":34,"text":592,"correct":22},"水利工程计日工可以低报",{"id":594,"libraryId":5,"type":15,"typeLabel":16,"stem":595,"options":596,"answer":578,"analysis":37},1151915,"根据《水利工程工程量清单计价规范》GB50501-2007，关于投标报价表填写说法错误的是（ ）。",[597,599,601,603,605],{"key":20,"text":598,"correct":29},"工程量清单中列明的所有需要填写的单价和合价，投标人均应填写；未填写的单价和合价，视为已包括在工程量清单的其他单价和合价中",{"key":24,"text":600,"correct":22},"工程量清单中的工程单价是完成工程量清单中一个质量合格的规定计量单位项目所需的直接费、间接费、企业利润和税金",{"key":27,"text":602,"correct":29},"投标总价应按工程项目总价表合计金额填写",{"key":31,"text":604,"correct":22},"措施项目清单计价表的序号、项目名称按投标人根据项目具体情况编制的措施项目清单填写",{"key":34,"text":606,"correct":22},"零星工作项目清单按招标文件零星工作项目清单计价表中的相应内容填写，不需要填写相关单价",{"id":608,"libraryId":5,"type":15,"typeLabel":16,"stem":609,"options":610,"answer":52,"analysis":37},1151916,"根据《水利工程工程量清单计价规范》GB50501-2007，工程量清单由（ ）组成。",[611,613,615,617,619],{"key":20,"text":612,"correct":22},"分类分项工程量清单",{"key":24,"text":614,"correct":22},"措施项目清单",{"key":27,"text":616,"correct":22},"其他项目清单",{"key":31,"text":618,"correct":29},"文明施工项目清单",{"key":34,"text":620,"correct":22},"零星工作项目清单",{"id":622,"libraryId":5,"type":15,"typeLabel":16,"stem":623,"options":624,"answer":126,"analysis":37},1151917,"人工预算单价计算方法按工程分类有（ ）三种计算方法和标准。",[625,627,629,631,633],{"key":20,"text":626,"correct":22},"枢纽工程",{"key":24,"text":628,"correct":22},"引水工程",{"key":27,"text":630,"correct":29},"堤防工程",{"key":31,"text":632,"correct":22},"河道工程",{"key":34,"text":634,"correct":29},"除险加固工程",{"id":636,"libraryId":5,"type":15,"typeLabel":16,"stem":637,"options":638,"answer":241,"analysis":37},1151918,"间接费包括（ ）。",[639,641,643,645,647],{"key":20,"text":640,"correct":29},"冬雨期施工增加费",{"key":24,"text":642,"correct":29},"夜间施工增加费",{"key":27,"text":644,"correct":29},"安全生产措施费",{"key":31,"text":646,"correct":22},"规费",{"key":34,"text":648,"correct":22},"企业管理费",{"id":650,"libraryId":5,"type":15,"typeLabel":16,"stem":651,"options":652,"answer":141,"analysis":37},1151919,"根据《水电工程设计概算费用标准》（2013年版），其他直接费包括（ ）等。",[653,654,656,657,659],{"key":20,"text":640,"correct":22},{"key":24,"text":655,"correct":22},"特殊地区施工增加费",{"key":27,"text":642,"correct":22},{"key":31,"text":658,"correct":22},"安全文明施工措施费",{"key":34,"text":660,"correct":29},"施工机械使用赞",{"id":662,"libraryId":5,"type":15,"typeLabel":16,"stem":663,"options":664,"answer":396,"analysis":37},1151920,"根据《水利工程设计概（估）算编制规定（工程部分）》（水总[2014]429号文），水利工程费用中，直接费包括（ ）。",[665,667,669,671,673],{"key":20,"text":666,"correct":22},"基本直接费",{"key":24,"text":668,"correct":22},"其他直接费",{"key":27,"text":670,"correct":29},"现场经费",{"key":31,"text":672,"correct":29},"利润",{"key":34,"text":674,"correct":29},"税金",{"id":676,"libraryId":5,"type":15,"typeLabel":16,"stem":677,"options":678,"answer":199,"analysis":37},1151921,"基本直接费包括（ ）。",[679,681,683,685,686],{"key":20,"text":680,"correct":22},"人工费",{"key":24,"text":682,"correct":22},"材料费",{"key":27,"text":684,"correct":22},"施工机械使用费",{"key":31,"text":646,"correct":29},{"key":34,"text":648,"correct":29},{"id":688,"libraryId":5,"type":15,"typeLabel":16,"stem":689,"options":690,"answer":36,"analysis":37},1151922,"其他直接费包括（ ）。",[691,692,694,695,696],{"key":20,"text":655,"correct":22},{"key":24,"text":693,"correct":22},"其他费用",{"key":27,"text":684,"correct":29},{"key":31,"text":640,"correct":22},{"key":34,"text":642,"correct":22},{"id":698,"libraryId":5,"type":15,"typeLabel":16,"stem":699,"options":700,"answer":199,"analysis":37},1151923,"根据《水电工程设计概算费用标准》（2013年版），基本直接费包括（ ）。",[701,702,703,704,706],{"key":20,"text":680,"correct":22},{"key":24,"text":682,"correct":22},{"key":27,"text":684,"correct":22},{"key":31,"text":705,"correct":29},"其他基本直接费",{"key":34,"text":674,"correct":29},{"id":708,"libraryId":5,"type":15,"typeLabel":16,"stem":709,"options":710,"answer":425,"analysis":37},1151924,"根据《水电工程设计概算费用标准》（2013年版），建筑及安装工程费中的直接费包括（ ）。",[711,713,715,716,717],{"key":20,"text":712,"correct":29},"直接工程费",{"key":24,"text":714,"correct":29},"其他直接工程费",{"key":27,"text":666,"correct":22},{"key":31,"text":668,"correct":22},{"key":34,"text":674,"correct":29},[719,723,726,729,732,735],{"id":720,"name":721,"category":7,"favorite":722},1,"领导干部任职前廉政法规知识测试题",92,{"id":724,"name":725,"category":7,"favorite":720},595,"建筑结构与设备",{"id":727,"name":728,"category":7,"favorite":720},715,"招标采购专业知识与法律法规",{"id":730,"name":731,"category":7,"favorite":720},848,"市政方向-通用基础",{"id":733,"name":734,"category":7,"favorite":8},534,"BIM工程师",{"id":736,"name":734,"category":7,"favorite":8},535]