[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-803-37":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":727},{"id":5,"name":6,"category":7,"favorite":8},803,"一建水利水电工程实务","建筑工程",0,37,50,1981,[13,38,53,67,82,97,112,127,142,156,170,184,199,212,226,241,256,271,286,301,311,325,337,351,365,379,393,408,422,436,451,465,480,494,508,522,535,549,563,575,589,603,616,628,642,656,670,685,699,713],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1151824,2,"多选题","重大隐患排查治理情况要向（ ）报告。",[19,23,27,30,33],{"key":20,"text":21,"correct":22},"A","水行政主管部门",true,{"key":24,"text":25,"correct":26},"B","建设行政主管部门",false,{"key":28,"text":29,"correct":26},"C","项目法人",{"key":31,"text":32,"correct":26},"D","监理单位",{"key":34,"text":35,"correct":22},"E","职代会","AE","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},1151825,"施工单位要安全（ ）到位。",[42,44,46,48,50],{"key":20,"text":43,"correct":22},"责任、管理",{"key":24,"text":45,"correct":22},"投入",{"key":28,"text":47,"correct":26},"警示",{"key":31,"text":49,"correct":22},"培训",{"key":34,"text":51,"correct":22},"应急救援","ABDE",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":36,"analysis":37},1151826,"到2030年，全面实现水利安全生产（ ）现代化。",[57,59,61,63,65],{"key":20,"text":58,"correct":22},"治理体系",{"key":24,"text":60,"correct":26},"治理手段",{"key":28,"text":62,"correct":26},"信息网络",{"key":31,"text":64,"correct":26},"监控系统",{"key":34,"text":66,"correct":22},"治理能力",{"id":68,"libraryId":5,"type":15,"typeLabel":16,"stem":69,"options":70,"answer":81,"analysis":37},1151827,"配电箱的重大事故隐患包括（ ）。",[71,73,75,77,79],{"key":20,"text":72,"correct":22},"无门",{"key":24,"text":74,"correct":26},"未油漆成黄色",{"key":28,"text":76,"correct":22},"无工作零线",{"key":31,"text":78,"correct":22},"无保护零线接线端子板",{"key":34,"text":80,"correct":22},"无锁","ACDE",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":96,"analysis":37},1151828,"水利水电工程施工重大危险源包括（ ）。",[86,88,90,92,94],{"key":20,"text":87,"correct":26},"特级重大危险源",{"key":24,"text":89,"correct":22},"一级重大危险源",{"key":28,"text":91,"correct":22},"二级重大危险源",{"key":31,"text":93,"correct":22},"三级重大危险源",{"key":34,"text":95,"correct":26},"一般重大危险源","BCD",{"id":98,"libraryId":5,"type":15,"typeLabel":16,"stem":99,"options":100,"answer":111,"analysis":37},1151829,"安全生产管理制度的基本内容包括（ ）。",[101,103,105,107,109],{"key":20,"text":102,"correct":22},"工作内容",{"key":24,"text":104,"correct":22},"责任人（部门）的职责与权限",{"key":28,"text":106,"correct":26},"惩戒",{"key":31,"text":108,"correct":26},"奖励",{"key":34,"text":110,"correct":22},"基本工作程序及标准","ABE",{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":126,"analysis":37},1151830,"水利工程生产安全重大事故隐患判定方法分为（ ）。",[116,118,120,122,124],{"key":20,"text":117,"correct":26},"事故树法",{"key":24,"text":119,"correct":22},"直接判定法",{"key":28,"text":121,"correct":26},"间接判断法",{"key":31,"text":123,"correct":26},"推理法",{"key":34,"text":125,"correct":22},"综合判定法","BE",{"id":128,"libraryId":5,"type":15,"typeLabel":16,"stem":129,"options":130,"answer":141,"analysis":37},1151831,"安全生产要严格落实（ ）的要求。",[131,133,135,137,139],{"key":20,"text":132,"correct":22},"党政同责",{"key":24,"text":134,"correct":22},"一岗双责",{"key":28,"text":136,"correct":22},"齐抓共管",{"key":31,"text":138,"correct":22},"失职追责",{"key":34,"text":140,"correct":26},"源头防范","ABCD",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":96,"analysis":37},1151832,"安全生产的重点是（ ）。",[146,148,150,152,154],{"key":20,"text":147,"correct":26},"杜绝特别重大事故",{"key":24,"text":149,"correct":22},"防范重特大事故",{"key":28,"text":151,"correct":22},"减少较大",{"key":31,"text":153,"correct":22},"减少一般事故",{"key":34,"text":155,"correct":26},"根治重大事故隐患",{"id":157,"libraryId":5,"type":15,"typeLabel":16,"stem":158,"options":159,"answer":169,"analysis":37},1151833,"对于判定出的重大事故隐患，要做到整改（ ）落实。",[160,162,164,166,167],{"key":20,"text":161,"correct":22},"责任",{"key":24,"text":163,"correct":22},"资金、措施",{"key":28,"text":165,"correct":22},"时限和应急预案",{"key":31,"text":106,"correct":26},{"key":34,"text":168,"correct":26},"调查","ABC",{"id":171,"libraryId":5,"type":15,"typeLabel":16,"stem":172,"options":173,"answer":169,"analysis":37},1151834,"施工用电的重大事故隐患包括未按规定实行（ ）。",[174,176,178,180,182],{"key":20,"text":175,"correct":22},"三相五线制",{"key":24,"text":177,"correct":22},"三级配电",{"key":28,"text":179,"correct":22},"两级保护",{"key":31,"text":181,"correct":26},"内外电分开",{"key":34,"text":183,"correct":26},"高低压分开",{"id":185,"libraryId":5,"type":15,"typeLabel":16,"stem":186,"options":187,"answer":198,"analysis":37},1151835,"项目法人制订的项目安全生产目标包括（ ）。",[188,190,192,194,196],{"key":20,"text":189,"correct":26},"工程伤亡目标",{"key":24,"text":191,"correct":22},"生产安全事故控制目标",{"key":28,"text":193,"correct":22},"安全生产投入目标",{"key":31,"text":195,"correct":22},"安全生产隐患排查治理目标",{"key":34,"text":197,"correct":22},"文明施工管理目标","BCDE",{"id":200,"libraryId":5,"type":15,"typeLabel":16,"stem":201,"options":202,"answer":211,"analysis":37},1151836,"项目法人编制的保证安全生产措施方案，应当报（ ）备案。",[203,204,205,207,209],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"key":28,"text":206,"correct":26},"安全生产监督行政主管部门",{"key":31,"text":208,"correct":22},"水利工程建设安全生产监督机构",{"key":34,"text":210,"correct":26},"各参建单位","AD",{"id":213,"libraryId":5,"type":15,"typeLabel":16,"stem":214,"options":215,"answer":36,"analysis":37},1151837,"安全生产费用是指（ ）所需费用。",[216,218,220,222,224],{"key":20,"text":217,"correct":22},"安全作业环境",{"key":24,"text":219,"correct":26},"围堰",{"key":28,"text":221,"correct":26},"喷雾设备",{"key":31,"text":223,"correct":26},"消防云梯",{"key":34,"text":225,"correct":22},"安全施工措施",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":240,"analysis":37},1151838,"项目法人应当报水行政主管部门备案的材料有（ ）。",[230,232,234,236,238],{"key":20,"text":231,"correct":22},"保证安全生产的措施方案",{"key":24,"text":233,"correct":22},"拆除工程或者爆破工程施工有关材料",{"key":28,"text":235,"correct":26},"开工报告",{"key":31,"text":237,"correct":26},"安全监督申请",{"key":34,"text":239,"correct":26},"事故报告","AB",{"id":242,"libraryId":5,"type":15,"typeLabel":16,"stem":243,"options":244,"answer":255,"analysis":37},1151839,"项目法人应当向施工单位提供的资料有（ ）。",[245,247,249,251,253],{"key":20,"text":246,"correct":22},"施工现场及施工可能影响的毗邻区域内的地下管线资料",{"key":24,"text":248,"correct":22},"气象和水文观测资料",{"key":28,"text":250,"correct":22},"拟建工程可能影响的相邻建筑物地T工程的有关资料",{"key":31,"text":252,"correct":26},"拟建工程的批复资料",{"key":34,"text":254,"correct":22},"提供可能影响施工报价的资料","ABCE",{"id":257,"libraryId":5,"type":15,"typeLabel":16,"stem":258,"options":259,"answer":270,"analysis":37},1151840,"项目法人在对施工投标单位进行资格审查时，应当对投标单位（ ）安全生产考核合格证进行审查。",[260,262,264,266,268],{"key":20,"text":261,"correct":22},"主要负责人",{"key":24,"text":263,"correct":26},"主要施工人员",{"key":28,"text":265,"correct":22},"项目负责人",{"key":31,"text":267,"correct":22},"专职安全生产管理人员",{"key":34,"text":269,"correct":26},"专职安全生产监督员","ACD",{"id":272,"libraryId":5,"type":15,"typeLabel":16,"stem":273,"options":274,"answer":285,"analysis":37},1151841,"根据《水电建设工程质量管理暂行办法》，事故调查权限按以下原则确定（ ）。",[275,277,279,281,283],{"key":20,"text":276,"correct":26},"一般事故由监理单位负责调查",{"key":24,"text":278,"correct":22},"一般事故由项目法人或监理单位负责调查",{"key":28,"text":280,"correct":22},"较大事故由项目法人负责组织专家组进行调查",{"key":31,"text":282,"correct":26},"重大事故由省级以上水行政主管部门负责组织专家组进行调查",{"key":34,"text":284,"correct":22},"特大质量事故由质监总站负责组织专家组进行调查","BCE",{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":300,"analysis":37},1151842,"下列关于水电工程事故调查权限和处理方案的说法，正确的是（ ）。",[290,292,294,296,298],{"key":20,"text":291,"correct":26},"一般事故由施工单位负责调查",{"key":24,"text":293,"correct":26},"较大事故可由监理单位负责调查",{"key":28,"text":295,"correct":22},"特大事故由质监总站负责组织专家组进行调查",{"key":31,"text":297,"correct":22},"一般事故及较大事故的处理方案均由事故单位提出",{"key":34,"text":299,"correct":22},"重、特大事故由项目法人委托设计单位提出，项目法人组织专家审查批准后实施","CDE",{"id":302,"libraryId":5,"type":15,"typeLabel":16,"stem":303,"options":304,"answer":285,"analysis":37},1151843,"根据《水电建设工程质量管理暂行办法》（电水农[1997]220号），事故调查权限按以下原则确定（ ）。",[305,306,307,308,309],{"key":20,"text":276,"correct":26},{"key":24,"text":278,"correct":22},{"key":28,"text":280,"correct":22},{"key":31,"text":282,"correct":26},{"key":34,"text":310,"correct":22},"重大事故和特大事故由质监总站负责组织专家组进行调查",{"id":312,"libraryId":5,"type":15,"typeLabel":16,"stem":313,"options":314,"answer":255,"analysis":37},1151844,"水电建设工程质量监督总站负责水电建设工程的质量监督归口管理工作，其主要职责包括（ ）。",[315,317,319,321,323],{"key":20,"text":316,"correct":22},"监督、指导工程安全鉴定工作",{"key":24,"text":318,"correct":22},"组织重大、特大事故调查",{"key":28,"text":320,"correct":22},"监督有关质量管理办法、规定的实施",{"key":31,"text":322,"correct":26},"参加重要工程的质量管理",{"key":34,"text":324,"correct":22},"参加重要工程的蓄水验收和竣工验收",{"id":326,"libraryId":5,"type":15,"typeLabel":16,"stem":327,"options":328,"answer":141,"analysis":37},1151845,"在工程阶段验收和竣工验收时，（ ）、运行等单位应在提供的文件中，对工程质量进行翔实的介绍和评价，并对存在的质量问题提供自检资料。",[329,330,332,334,336],{"key":20,"text":29,"correct":22},{"key":24,"text":331,"correct":22},"设计",{"key":28,"text":333,"correct":22},"监理",{"key":31,"text":335,"correct":22},"施工",{"key":34,"text":25,"correct":26},{"id":338,"libraryId":5,"type":15,"typeLabel":16,"stem":339,"options":340,"answer":96,"analysis":37},1151846,"临时合同工应（ ）。",[341,343,345,347,349],{"key":20,"text":342,"correct":26},"作为劳务由施工单位分级管理",{"key":24,"text":344,"correct":22},"一般应用于承担非技术工种",{"key":28,"text":346,"correct":22},"需用于承担技术工种的，施工单位应对其进行质量教育和技能培训，持证上岗",{"key":31,"text":348,"correct":22},"承担技术工种应持证上岗，并报监理单位备案",{"key":34,"text":350,"correct":26},"不得用于主体工程施工中",{"id":352,"libraryId":5,"type":15,"typeLabel":16,"stem":353,"options":354,"answer":81,"analysis":37},1151847,"以下有关施工质量检查与工程验收的说法，正确的有（ ）。",[355,357,359,361,363],{"key":20,"text":356,"correct":22},"分部分项工程应由监理单位组织进行联合检查验收",{"key":24,"text":358,"correct":26},"分部分项工程应由项目法人签署验收结论",{"key":28,"text":360,"correct":22},"水库蓄水验收及工程竣工验收前应进行工程安全鉴定",{"key":31,"text":362,"correct":22},"设计、运行等单位均应在分部分项工程验收签证上签字或签署意见",{"key":34,"text":364,"correct":22},"工程阶段验收和竣工验收时，项目法人等单位应在提供的文件中对存在的质量问题提供自检资料",{"id":366,"libraryId":5,"type":15,"typeLabel":16,"stem":367,"options":368,"answer":169,"analysis":37},1151848,"设计单位派出的现场设计代表机构应（ ）。",[369,371,373,375,377],{"key":20,"text":370,"correct":22},"做到专业配套，人员相对稳定",{"key":24,"text":372,"correct":22},"至少应有一名负责人常驻工地",{"key":28,"text":374,"correct":22},"设计代表机构负责人一般由设计项目经理或设计总工程师（含副职）担任",{"key":31,"text":376,"correct":26},"设计代表机构人员可在监理单位和施工单位兼职",{"key":34,"text":378,"correct":26},"必须派出该项目负责人常驻工地",{"id":380,"libraryId":5,"type":15,"typeLabel":16,"stem":381,"options":382,"answer":96,"analysis":37},1151849,"涉及工程安全的重大问题的（ ）发生重大变更时，必须由项目法人报原设计审批部门审查批准。",[383,385,387,389,391],{"key":20,"text":384,"correct":26},"设计负责人",{"key":24,"text":386,"correct":22},"设计原则",{"key":28,"text":388,"correct":22},"设计标准",{"key":31,"text":390,"correct":22},"设计方案",{"key":34,"text":392,"correct":26},"设计理念",{"id":394,"libraryId":5,"type":15,"typeLabel":16,"stem":395,"options":396,"answer":407,"analysis":37},1151850,"对于参建单位和个人提出的一般设计变更建议，设计单位（ ）。",[397,399,401,403,405],{"key":20,"text":398,"correct":22},"应认真听取并加以论证，积极采纳合理化建议",{"key":24,"text":400,"correct":22},"对采纳建议所作的设计质量负责",{"key":28,"text":402,"correct":26},"对采纳建议所作的设计质量不负责",{"key":31,"text":404,"correct":22},"可以不采纳",{"key":34,"text":406,"correct":26},"必须采纳","ABD",{"id":409,"libraryId":5,"type":15,"typeLabel":16,"stem":410,"options":411,"answer":285,"analysis":37},1151851,"下列关于水利工程设计单位说法，正确的有（ ）。",[412,414,416,418,420],{"key":20,"text":413,"correct":26},"由两个或两个以上设计单位组成联营体的各自对所设计的内容负责",{"key":24,"text":415,"correct":22},"联营体的责任方是工程项目的总体设计单位",{"key":28,"text":417,"correct":22},"设计代表机构人员不得在监理单位和施工单位兼职",{"key":31,"text":419,"correct":26},"设计单位对水利工程材料和设备可以指定供货厂家",{"key":34,"text":421,"correct":22},"设计单位推荐材料和设备时应遵循“定型不定厂”的原则",{"id":423,"libraryId":5,"type":15,"typeLabel":16,"stem":424,"options":425,"answer":407,"analysis":37},1151852,"根据《水电建设工程质量管理暂行办法》（电水农[1997]220号），下列有关施工质量管理的说法正确的是（ ）。",[426,428,430,432,434],{"key":20,"text":427,"correct":22},"近一年内工程发生特大质量事故的施工单位不得独立中标承建大型水电站主体工程的施工任务",{"key":24,"text":429,"correct":22},"非水电专业施工单位不能独立承担具有水工专业特点的工程项目",{"key":28,"text":431,"correct":26},"大型水电项目的非主体工程可以转包",{"key":31,"text":433,"correct":22},"水电项目分包部分不宜超过合同工作量的30%",{"key":34,"text":435,"correct":26},"临时合同工不能作为劳务由施工单位统一管理",{"id":437,"libraryId":5,"type":15,"typeLabel":16,"stem":438,"options":439,"answer":450,"analysis":37},1151853,"下列关于水利工程质量管理责任的说法，正确的有（ ）。",[440,442,444,446,448],{"key":20,"text":441,"correct":26},"建设项目的项目法人单位质量分管领导对本单位的质量工作负领导责任",{"key":24,"text":443,"correct":22},"监理单位的工程项目技术负责人（总监）对质量工作负技术责任",{"key":28,"text":445,"correct":26},"监理单位的现场工程师对质量工作负技术责任",{"key":31,"text":447,"correct":22},"监理、设计、施工单位的具体工作人员为直接责任人",{"key":34,"text":449,"correct":22},"各单位在工程项目现场的行政负责人对本单位在工程建设中的质量工作负直接领导责任","BDE",{"id":452,"libraryId":5,"type":15,"typeLabel":16,"stem":453,"options":454,"answer":407,"analysis":37},1151854,"在工程建设期间，施工单位（ ）。",[455,457,459,461,463],{"key":20,"text":456,"correct":22},"对所承包项目的施工质量负责",{"key":24,"text":458,"correct":22},"在监理单位验收前对施工质量负全部责任",{"key":28,"text":460,"correct":26},"在监理单位验收后对施工质量负间接责任",{"key":31,"text":462,"correct":22},"在监理单位验收后，对其隐瞒或虚假部分负直接责任",{"key":34,"text":464,"correct":26},"对安装的设备质量负责",{"id":466,"libraryId":5,"type":15,"typeLabel":16,"stem":467,"options":468,"answer":479,"analysis":37},1151855,"工程建设实施过程中的工程质量由（ ）。",[469,471,473,475,477],{"key":20,"text":470,"correct":22},"项目法人负总责",{"key":24,"text":472,"correct":26},"主要由施工单位负责",{"key":28,"text":474,"correct":22},"监理、设计单位按照合同及有关规定对所承担的工作质量负责",{"key":31,"text":476,"correct":26},"主要由设计单位负责",{"key":34,"text":478,"correct":26},"由质量监督部门负责","AC",{"id":481,"libraryId":5,"type":15,"typeLabel":16,"stem":482,"options":483,"answer":169,"analysis":37},1151856,"在（ ）等前期工作中的工程质量由设计单位负责，设计审查单位负审查责任。",[484,486,488,490,492],{"key":20,"text":485,"correct":22},"可行性研究",{"key":24,"text":487,"correct":22},"可行性研究以前阶段的勘测设计",{"key":28,"text":489,"correct":22},"可行性研究以前阶段的规划设计",{"key":31,"text":491,"correct":26},"初步设计",{"key":34,"text":493,"correct":26},"初步设计及以前阶段的勘测设计",{"id":495,"libraryId":5,"type":15,"typeLabel":16,"stem":496,"options":497,"answer":52,"analysis":37},1151857,"监理单位对工程建设过程中的设计与施工质量负监督与控制责任，对其验收合格项目的施工质量负直接责任，其主要的职责包括（ ）。",[498,500,502,504,506],{"key":20,"text":499,"correct":22},"审批施工单位的施工组织设计、施工技术措施、施工详图",{"key":24,"text":501,"correct":22},"签发设计单位的施工设计文件（包括施工详图）",{"key":28,"text":503,"correct":26},"按规定负责组织施工单位职工的技术培训",{"key":31,"text":505,"correct":22},"进行施工质量监督与控制",{"key":34,"text":507,"correct":22},"组织设计交底",{"id":509,"libraryId":5,"type":15,"typeLabel":16,"stem":510,"options":511,"answer":450,"analysis":37},1151858,"工程建设过程中，监理单位的职责包括（ ）。",[512,514,516,518,520],{"key":20,"text":513,"correct":26},"参加设计单位组织的设计交底",{"key":24,"text":515,"correct":22},"签发设计单位的施工设计文件",{"key":28,"text":517,"correct":26},"负责进行施工单位资格审查",{"key":31,"text":519,"correct":22},"审批施工单位的施工组织设计、施工技术措施",{"key":34,"text":521,"correct":22},"按规定负责进行施工质量监督与控制",{"id":523,"libraryId":5,"type":15,"typeLabel":16,"stem":524,"options":525,"answer":169,"analysis":37},1151859,"项目法人在工程建设实施过程中应（ ）。",[526,528,530,532,534],{"key":20,"text":527,"correct":22},"组织好资金供应",{"key":24,"text":529,"correct":22},"保证合同规定的工程款到位",{"key":28,"text":531,"correct":22},"不得因资金短缺降低工程质量标准和影响工程安全",{"key":31,"text":533,"correct":26},"负责组织设计交底",{"key":34,"text":499,"correct":26},{"id":536,"libraryId":5,"type":15,"typeLabel":16,"stem":537,"options":538,"answer":96,"analysis":37},1151861,"下列关于施工质量评定表的使用说法正确的是（ ）。",[539,541,543,545,547],{"key":20,"text":540,"correct":26},"可使用圆珠笔填写",{"key":24,"text":542,"correct":22},"数字应使用阿拉伯数字",{"key":28,"text":544,"correct":22},"单位使用国家法定计量单位，并以规定的符号表示",{"key":31,"text":546,"correct":22},"合格率用百分数表示，小数点后保留一位",{"key":34,"text":548,"correct":26},"改错应使用改正液",{"id":550,"libraryId":5,"type":15,"typeLabel":16,"stem":551,"options":552,"answer":81,"analysis":37},1151862,"下列属于分部工程施工质量优良标准的必要条件的是（ ）。",[553,555,557,559,561],{"key":20,"text":554,"correct":22},"所含单元工程质量全部合格，其中70%以上达到优良等级",{"key":24,"text":556,"correct":26},"外观质量得分率达到85%以上",{"key":28,"text":558,"correct":22},"未发生过质量事故",{"key":31,"text":560,"correct":22},"中间产品质量全部合格",{"key":34,"text":562,"correct":22},"原材料质量、金属结构及启闭机制造质量合格",{"id":564,"libraryId":5,"type":15,"typeLabel":16,"stem":565,"options":566,"answer":81,"analysis":37},1151863,"根据《水利水电工程施工质量检验与评定规程》SL176-2007，下列关于分部工程优良标准的说法，正确的是（ ）。",[567,568,570,572,573],{"key":20,"text":554,"correct":22},{"key":24,"text":569,"correct":26},"重要隐蔽单元工程及关键部位单元工程质量优良，且未发生过质量事故",{"key":28,"text":571,"correct":22},"中间产品质量全部合格，其中混凝土试件质量达到优良等级",{"key":31,"text":562,"correct":22},{"key":34,"text":574,"correct":22},"机电产品质量合格",{"id":576,"libraryId":5,"type":15,"typeLabel":16,"stem":577,"options":578,"answer":270,"analysis":37},1151864,"根据《水利水电工程施工质量检验与评定规程》SL176-2007，下列关于工程项目质量评定标准的说法，正确的是（ ）。",[579,581,583,585,587],{"key":20,"text":580,"correct":22},"工程项目质量评定为合格时，单位工程质量须全部合格",{"key":24,"text":582,"correct":26},"工程项目质量评定为优良时，单位工程质量须全部合格，且有50%以上的单位工程优良",{"key":28,"text":584,"correct":22},"工程项目质量评定为优良时，单位工程质量须全部合格，且有70%以上的单位工程优良",{"key":31,"text":586,"correct":22},"工程项目质量评定为优良时，主要单位工程全部应为优良",{"key":34,"text":588,"correct":26},"工程项目质量评定为优良时，主要单位工程50%以上应为优良",{"id":590,"libraryId":5,"type":15,"typeLabel":16,"stem":591,"options":592,"answer":169,"analysis":37},1151865,"下列关于单元工程施工质量评定的说法，正确的是（ ）。",[593,595,597,599,601],{"key":20,"text":594,"correct":22},"单元（工序）工程质量在施工单位自评合格后，报监理单位复核，由监理工程师核定质量等级并签证认可",{"key":24,"text":596,"correct":22},"重要隐蔽单元工程及关键部位单元工程质量经施工单位自评合格、监理单位抽检后，由项目法人等单值组成联合小组，共同检查核定其质量等级并填写签证表，报工程质量监督机构核备",{"key":28,"text":598,"correct":22},"单元（工序）工程质量达不到合格标准时，应及时处理",{"key":31,"text":600,"correct":26},"划分工序的单元工程中，工序优良率达到70%及以上，其施工质量方可评定为优良",{"key":34,"text":602,"correct":26},"不划分工序的单元工程中，一般项目有70%及以上的检验点合格，其施工质量方可评定为优良",{"id":604,"libraryId":5,"type":15,"typeLabel":16,"stem":605,"options":606,"answer":81,"analysis":37},1151866,"根据《水利水电工程施工质量检验与评定规程》SL176-2007，下列关于单位工程优良标准的说法，正确的是（ ）。",[607,609,611,613,614],{"key":20,"text":608,"correct":22},"分部工程全部合格，其中70%以上达到优良",{"key":24,"text":610,"correct":26},"主要分部工程80%优良，且施工中未发生过重大质量事故",{"key":28,"text":612,"correct":22},"质量事故已按要求进行处理",{"key":31,"text":556,"correct":22},{"key":34,"text":615,"correct":22},"单位工程施工质量检验与评定资料齐全",{"id":617,"libraryId":5,"type":15,"typeLabel":16,"stem":618,"options":619,"answer":270,"analysis":37},1151867,"根据《水利水电工程施工质量检验与评定规程》SL176-2007，下列关于单位工程合格标准的说法，正确的是（ ）。",[620,622,623,624,626],{"key":20,"text":621,"correct":22},"分部工程质量全部合格",{"key":24,"text":610,"correct":26},{"key":28,"text":612,"correct":22},{"key":31,"text":625,"correct":22},"单位工程施工质量检验与评定资料基本齐全",{"key":34,"text":627,"correct":26},"外观质量得分率达到50%以上",{"id":629,"libraryId":5,"type":15,"typeLabel":16,"stem":630,"options":631,"answer":126,"analysis":37},1151868,"单元工程质量达不到《水利水电基本建设工程单元工程质量等级评定标准》时，必须及时处理。下列关于其质量等级确定的说法，正确的是（ ）。",[632,634,636,638,640],{"key":20,"text":633,"correct":26},"全部返工重做的，其质量也只能评定为合格",{"key":24,"text":635,"correct":22},"经加固补强并经鉴定能达到设计要求，其质量只能评为合格",{"key":28,"text":637,"correct":26},"经加固补强并经鉴定能达到设计要求，其质量可以评为优良",{"key":31,"text":639,"correct":26},"经鉴定达不到设计要求，但建设单位认为能基本满足安全和使用功能要求的，可不加固补强",{"key":34,"text":641,"correct":22},"经加固补强后，造成永久性缺陷的，经建设单位认为基本满足设计要求，其质量可按合格处理",{"id":643,"libraryId":5,"type":15,"typeLabel":16,"stem":644,"options":645,"answer":141,"analysis":37},1151869,"以下属于重要隐蔽单元工程的是（ ）。",[646,648,650,652,654],{"key":20,"text":647,"correct":22},"主要建筑物的地基开挖",{"key":24,"text":649,"correct":22},"地下洞室开挖",{"key":28,"text":651,"correct":22},"地基防渗",{"key":31,"text":653,"correct":22},"加固处理和排水工程",{"key":34,"text":655,"correct":26},"电站厂房",{"id":657,"libraryId":5,"type":15,"typeLabel":16,"stem":658,"options":659,"answer":52,"analysis":37},1151870,"下列关于分部工程及分部工程验收的说法，正确的是（ ）。",[660,662,664,666,668],{"key":20,"text":661,"correct":22},"分部工程是指在一个建筑物内能组织发挥一种功能的建筑安装工程，是组成单位工程的各个部分",{"key":24,"text":663,"correct":22},"分部工程验收的条件是该分部工程的全部单元工程已经完建且质量合格",{"key":28,"text":665,"correct":26},"分部工程是指具有独立发挥作用或独立施工条件的建筑物",{"key":31,"text":667,"correct":22},"分部工程验收工作组由项目法人或监理主持",{"key":34,"text":669,"correct":22},"分部工程验收的有关资料必须按照竣工验收的标准制备",{"id":671,"libraryId":5,"type":15,"typeLabel":16,"stem":672,"options":673,"answer":684,"analysis":37},1151871,"水利水电工程项目划分应结合（ ）要求进行。",[674,676,678,680,682],{"key":20,"text":675,"correct":22},"工程结构特点",{"key":24,"text":677,"correct":26},"施工工艺",{"key":28,"text":679,"correct":22},"施工部署",{"key":31,"text":681,"correct":26},"便于资源供应",{"key":34,"text":683,"correct":22},"施工合同要求","ACE",{"id":686,"libraryId":5,"type":15,"typeLabel":16,"stem":687,"options":688,"answer":450,"analysis":37},1151872,"根据《水利水电工程施工质量检验与评定规程》SL176-2007，关于工程项目划分的基本原则，以下说法正确的是（ ）。",[689,691,693,695,697],{"key":20,"text":690,"correct":26},"水利水电工程项目分为单位工程、分项工程、单元工程三级",{"key":24,"text":692,"correct":22},"应结合工程结构特点、施工部署及施工合同要求进行",{"key":28,"text":694,"correct":26},"外观质量得分率，指分部工程外观质量实际得分占应得分数的百分数",{"key":31,"text":696,"correct":22},"划分结果应有利于保证施工质量以及施工质量管理",{"key":34,"text":698,"correct":22},"水利水电工程项目分为单位工程、分部工程、单元工程三级",{"id":700,"libraryId":5,"type":15,"typeLabel":16,"stem":701,"options":702,"answer":285,"analysis":37},1151873,"根据《水电水利工程施工监理规范》DL\u002FT 5111-2000，水电工程项目划分为（ ）工程。",[703,705,707,709,711],{"key":20,"text":704,"correct":26},"主体",{"key":24,"text":706,"correct":22},"单位",{"key":28,"text":708,"correct":22},"分部",{"key":31,"text":710,"correct":26},"分项",{"key":34,"text":712,"correct":22},"单元",{"id":714,"libraryId":5,"type":15,"typeLabel":16,"stem":715,"options":716,"answer":52,"analysis":37},1151874,"下列关于竣工图编制的说法，正确的是（ ）。",[717,719,721,723,725],{"key":20,"text":718,"correct":22},"按施工图施工没有变动的，可在施工图上加盖并签署竣工图章即可",{"key":24,"text":720,"correct":22},"符合杠改或划改要求的，可在原施工图上更改",{"key":28,"text":722,"correct":26},"凡涉及结构形式、工艺、平面布置等重大改变，应重新绘制竣工图，且必须加盖竣工图章",{"key":31,"text":724,"correct":22},"图面变更超过1\u002F3的，应重新绘制竣工图，可不再加盖竣工图章",{"key":34,"text":726,"correct":22},"重绘的竣工图需要监理单位在图标上方加盖并签署“竣工图确认章”",[728,732,735,738,741,744],{"id":729,"name":730,"category":7,"favorite":731},1,"领导干部任职前廉政法规知识测试题",92,{"id":733,"name":734,"category":7,"favorite":729},595,"建筑结构与设备",{"id":736,"name":737,"category":7,"favorite":729},715,"招标采购专业知识与法律法规",{"id":739,"name":740,"category":7,"favorite":729},848,"市政方向-通用基础",{"id":742,"name":743,"category":7,"favorite":8},534,"BIM工程师",{"id":745,"name":743,"category":7,"favorite":8},535]