[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-803-3":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":583},{"id":5,"name":6,"category":7,"favorite":8},803,"一建水利水电工程实务","建筑工程",0,3,50,1981,[13,34,46,58,70,80,92,104,116,128,140,152,164,176,185,197,209,221,233,245,253,261,273,285,297,309,321,331,342,350,362,374,383,395,405,417,429,437,449,460,472,483,493,505,516,528,539,551,563,575],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},1150094,1,"单选题","（2019年真题）混凝土入仓温度是指混凝土下料后平仓前测得的深()cm处的温度。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","3~5",false,{"key":24,"text":25,"correct":26},"B","5~10",true,{"key":28,"text":29,"correct":22},"C","10~15",{"key":31,"text":32,"correct":22},"D","15~20","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},1150095,"（2014年）VeBe仪用于测定碾压混凝土的（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":26},"稠度",{"key":24,"text":41,"correct":22},"干密度",{"key":28,"text":43,"correct":22},"压实度",{"key":31,"text":45,"correct":22},"湿密度",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":28,"analysis":33},1150096,"（2012年）碾压混凝土坝的混凝土强度在施工过程中是以（ ）进行控制的。",[50,52,54,56],{"key":20,"text":51,"correct":22},"钻孔取芯",{"key":24,"text":53,"correct":22},"压水试验",{"key":28,"text":55,"correct":26},"监测密度",{"key":31,"text":57,"correct":22},"留置试块",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":28,"analysis":33},1150097,"（2011年）根据《水工碾压混凝土施工规范》（DL／T 5112—2000)，碾压混凝土压实质量的评价指标是（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":22},"最大干密度",{"key":24,"text":65,"correct":22},"压实重度",{"key":28,"text":67,"correct":26},"相对压实度",{"key":31,"text":69,"correct":22},"相对密度",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":24,"analysis":33},1150098,"（2010年）VC值是评价碾压混凝土（）的指标。",[74,75,77,78],{"key":20,"text":45,"correct":22},{"key":24,"text":76,"correct":26},"干湿度",{"key":28,"text":43,"correct":22},{"key":31,"text":79,"correct":22},"均匀性",{"id":81,"libraryId":5,"type":15,"typeLabel":16,"stem":82,"options":83,"answer":24,"analysis":33},1150099,"（2013年）堤防黏性土料埴筑中，在新层铺料前，对出现的光面应进行（ ）处理。",[84,86,88,90],{"key":20,"text":85,"correct":22},"挖除",{"key":24,"text":87,"correct":26},"刨毛",{"key":28,"text":89,"correct":22},"碾压",{"key":31,"text":91,"correct":22},"洒水",{"id":93,"libraryId":5,"type":15,"typeLabel":16,"stem":94,"options":95,"answer":28,"analysis":33},1150100,"（2016年）根据《堤防工程施工规范》（SL260-2014），填筑堤防横断面的地面坡度较陡，施工时应将地面坡度削至缓于（ ）。",[96,98,100,102],{"key":20,"text":97,"correct":22},"1:3",{"key":24,"text":99,"correct":22},"1:4",{"key":28,"text":101,"correct":26},"1:5",{"key":31,"text":103,"correct":22},"1:6",{"id":105,"libraryId":5,"type":15,"typeLabel":16,"stem":106,"options":107,"answer":24,"analysis":33},1150101,"（2015年）自航耙吸式挖泥船处理疏浚泥土的方法属于（ ）。",[108,110,112,114],{"key":20,"text":109,"correct":22},"吹填法",{"key":24,"text":111,"correct":26},"边拋法",{"key":28,"text":113,"correct":22},"水上拋泥法",{"key":31,"text":115,"correct":22},"水下拋泥法",{"id":117,"libraryId":5,"type":15,"typeLabel":16,"stem":118,"options":119,"answer":20,"analysis":33},1150102,"（2016年）某疏浚工程施工的排泥方式是经过排泥管输送泥浆至排泥区，相应的挖泥船类型为（ ）。",[120,122,124,126],{"key":20,"text":121,"correct":26},"绞吸式挖泥船",{"key":24,"text":123,"correct":22},"链斗式挖泥船",{"key":28,"text":125,"correct":22},"抓扬式挖泥船",{"key":31,"text":127,"correct":22},"耙吸式挖泥船",{"id":129,"libraryId":5,"type":15,"typeLabel":16,"stem":130,"options":131,"answer":31,"analysis":33},1150103,"（2006年）水闸的排水反滤设施一般布置在（）部位。",[132,134,136,138],{"key":20,"text":133,"correct":22},"上游铺盖",{"key":24,"text":135,"correct":22},"下游海漫",{"key":28,"text":137,"correct":22},"闸室底板",{"key":31,"text":139,"correct":26},"下游护坦（消力池）",{"id":141,"libraryId":5,"type":15,"typeLabel":16,"stem":142,"options":143,"answer":20,"analysis":33},1150104,"（2017年）型号为QL2*80D的启闭机属于（ )",[144,146,148,150],{"key":20,"text":145,"correct":26},"螺杆式启闭机",{"key":24,"text":147,"correct":22},"液压式启闭机",{"key":28,"text":149,"correct":22},"卷扬式启闭机",{"key":31,"text":151,"correct":22},"移动式启闭机",{"id":153,"libraryId":5,"type":15,"typeLabel":16,"stem":154,"options":155,"answer":31,"analysis":33},1150105,"（2016年）下列水泵类型中，不属于叶片泵的是（ ）。",[156,158,160,162],{"key":20,"text":157,"correct":22},"离心泵",{"key":24,"text":159,"correct":22},"轴流泵",{"key":28,"text":161,"correct":22},"混流泵",{"key":31,"text":163,"correct":26},"容积泵",{"id":165,"libraryId":5,"type":15,"typeLabel":16,"stem":166,"options":167,"answer":24,"analysis":33},1150106,"（2011年）低水头、大流量水电站，通常选用（ ）水轮机。",[168,170,172,174],{"key":20,"text":169,"correct":22},"双击式",{"key":24,"text":171,"correct":26},"贯流式",{"key":28,"text":173,"correct":22},"斜流式",{"key":31,"text":175,"correct":22},"混流式",{"id":177,"libraryId":5,"type":15,"typeLabel":16,"stem":178,"options":179,"answer":24,"analysis":33},1150107,"（2016年）下列不属于叶片泵的是（）",[180,181,183,184],{"key":20,"text":157,"correct":22},{"key":24,"text":182,"correct":26},"漩涡泵",{"key":28,"text":159,"correct":22},{"key":31,"text":161,"correct":22},{"id":186,"libraryId":5,"type":15,"typeLabel":16,"stem":187,"options":188,"answer":31,"analysis":33},1150108,"（2019年真题）大型水斗机的应用水头约为()m",[189,191,193,195],{"key":20,"text":190,"correct":22},"50~100",{"key":24,"text":192,"correct":22},"20~50",{"key":28,"text":194,"correct":22},"40~250",{"key":31,"text":196,"correct":26},"300~1700",{"id":198,"libraryId":5,"type":15,"typeLabel":16,"stem":199,"options":200,"answer":20,"analysis":33},1150109,"（2016年）下列抢护原则中，不适用于堤防防汛抢险施工的是（ ）。",[201,203,205,207],{"key":20,"text":202,"correct":26},"前导后堵",{"key":24,"text":204,"correct":22},"强身固脚",{"key":28,"text":206,"correct":22},"减载平压",{"key":31,"text":208,"correct":22},"缓流消浪",{"id":210,"libraryId":5,"type":15,"typeLabel":16,"stem":211,"options":212,"answer":28,"analysis":33},1150110,"（2006年）在规划土石坝施工料场时，实际可开采总量与坝体填筑量之比最大的材料是（）。",[213,215,217,219],{"key":20,"text":214,"correct":22},"土料",{"key":24,"text":216,"correct":22},"石料",{"key":28,"text":218,"correct":26},"反滤料",{"key":31,"text":220,"correct":22},"砂砾料",{"id":222,"libraryId":5,"type":15,"typeLabel":16,"stem":223,"options":224,"answer":28,"analysis":33},1150111,"（2015年）明挖爆破工程发出的信号为鸣10s、停、鸣10s、停、鸣10s，该信号属于（ ）。",[225,227,229,231],{"key":20,"text":226,"correct":22},"预告信号",{"key":24,"text":228,"correct":22},"准备信号",{"key":28,"text":230,"correct":26},"起爆信号",{"key":31,"text":232,"correct":22},"解除信号",{"id":234,"libraryId":5,"type":15,"typeLabel":16,"stem":235,"options":236,"answer":24,"analysis":33},1150112,"(2010年)在坠落高度基准面以上10m处的施工作业属于（）级高处作业。",[237,239,241,243],{"key":20,"text":238,"correct":22},"一",{"key":24,"text":240,"correct":26},"二",{"key":28,"text":242,"correct":22},"三",{"key":31,"text":244,"correct":22},"特",{"id":246,"libraryId":5,"type":15,"typeLabel":16,"stem":247,"options":248,"answer":20,"analysis":33},1150113,"（2016年）下列抢护原则中，不适用于堤防防汛抢险施工的是()。",[249,250,251,252],{"key":20,"text":202,"correct":26},{"key":24,"text":204,"correct":22},{"key":28,"text":206,"correct":22},{"key":31,"text":208,"correct":22},{"id":254,"libraryId":5,"type":15,"typeLabel":16,"stem":255,"options":256,"answer":24,"analysis":33},1150114,"（2018年真题）明挖爆破施工，施工单位发出“鸣10s，停，鸣10s”的音响信号属于（）。",[257,258,259,260],{"key":20,"text":226,"correct":22},{"key":24,"text":230,"correct":26},{"key":28,"text":228,"correct":22},{"key":31,"text":232,"correct":22},{"id":262,"libraryId":5,"type":15,"typeLabel":16,"stem":263,"options":264,"answer":24,"analysis":33},1150115,"（2015年）根据主体工程开工的有关规定，项目法人应当自工程开工之日起15个工作日之内，将（ ）。",[265,267,269,271],{"key":20,"text":266,"correct":22},"开工情况的书面报告上报上一级主管单位审批",{"key":24,"text":268,"correct":26},"开工情况的书面报告上报上一级主管单位备案",{"key":28,"text":270,"correct":22},"开工报告上报上一级主管单位备案",{"key":31,"text":272,"correct":22},"开工报告上报上一级主管单位审批",{"id":274,"libraryId":5,"type":15,"typeLabel":16,"stem":275,"options":276,"answer":31,"analysis":33},1150116,"（2015年）根据《水利工程建设项目勘察（测）设计招标投标管理办法》（水总〔2004〕511号），招标人采用未中标人投标文件中的技术方案，若招标文件规定给予补偿的，招标人应在与中标人签订合同后（ ）个工作日内予以补偿。",[277,279,281,283],{"key":20,"text":278,"correct":22},"14",{"key":24,"text":280,"correct":22},"10",{"key":28,"text":282,"correct":22},"7",{"key":31,"text":284,"correct":26},"5",{"id":286,"libraryId":5,"type":15,"typeLabel":16,"stem":287,"options":288,"answer":20,"analysis":33},1150117,"（2015年）根据《关于水利工程建设项目代建制管理的指导意见》（水建管〔2015〕91号），水利工程建设项目代建单位负责对水利工程建设项目（ ）的建设进行管理。",[289,291,293,295],{"key":20,"text":290,"correct":26},"施工准备至竣工验收",{"key":24,"text":292,"correct":22},"初步设计至竣工验收",{"key":28,"text":294,"correct":22},"可行性研究至竣工验收",{"key":31,"text":296,"correct":22},"可行性研究至后评价",{"id":298,"libraryId":5,"type":15,"typeLabel":16,"stem":299,"options":300,"answer":20,"analysis":33},1150118,"（2012年）根据《水工程建设规划同意书制度管理办法（试行）》（水利部令第31号），下列部门中，不受理申请和审査签署水工程建设规划同意书的是（ ）。",[301,303,305,307],{"key":20,"text":302,"correct":26},"水利部",{"key":24,"text":304,"correct":22},"流域管理机构",{"key":28,"text":306,"correct":22},"省水利局",{"key":31,"text":308,"correct":22},"市水利局",{"id":310,"libraryId":5,"type":15,"typeLabel":16,"stem":311,"options":312,"answer":24,"analysis":33},1150119,"（2013年）根据《水利建设项目后评价管理办法（试行）》（水规计【2010】51号），按层次进行划分，除项目法人的自我评价和主管部门的评价外，水利建设项目后评价还应包括（ ）的评价。",[313,315,317,319],{"key":20,"text":314,"correct":22},"融资方",{"key":24,"text":316,"correct":26},"项目行业",{"key":28,"text":318,"correct":22},"审查部门",{"key":31,"text":320,"correct":22},"运行管理单位",{"id":322,"libraryId":5,"type":15,"typeLabel":16,"stem":323,"options":324,"answer":24,"analysis":33},1150120,"（2016年）根据水利部《水利建设项目后评价管理办法（试行）》（水规计【2010】51号），项目后评价一般按（ ）个层次组织实施。",[325,326,327,329],{"key":20,"text":240,"correct":22},{"key":24,"text":242,"correct":26},{"key":28,"text":328,"correct":22},"四",{"key":31,"text":330,"correct":22},"五",{"id":332,"libraryId":5,"type":15,"typeLabel":16,"stem":333,"options":334,"answer":20,"analysis":33},1150121,"（2013年）根据《水利水电建设工程蓄水安全鉴定暂行办法》（水建管〔1999〕177号），水库蓄水安全鉴定由（ ）负责组织实施。",[335,337,339,341],{"key":20,"text":336,"correct":26},"项目法人",{"key":24,"text":338,"correct":22},"施工单位",{"key":28,"text":340,"correct":22},"水行政主管部门",{"key":31,"text":320,"correct":22},{"id":343,"libraryId":5,"type":15,"typeLabel":16,"stem":344,"options":345,"answer":28,"analysis":33},1150122,"（2014年）根据《水闸安全鉴定管理办法》（水建管〔2008〕214号），某水闸工程鉴定结论为：运用指标达不到设计标准，工程存在严重损坏，经除险加固后，才能达到正常运行。该水闸安全类别应为（ ）类闸。",[346,347,348,349],{"key":20,"text":238,"correct":22},{"key":24,"text":240,"correct":22},{"key":28,"text":242,"correct":26},{"key":31,"text":328,"correct":22},{"id":351,"libraryId":5,"type":15,"typeLabel":16,"stem":352,"options":353,"answer":28,"analysis":33},1150123,"（2017年）根据《水利部关于调整水利工程建设项目施工准备开工条件的通知》（水建管[2017]177号)，不属于施工准备条件的是（ )。",[354,356,358,360],{"key":20,"text":355,"correct":22},"可行性研究报告已批准",{"key":24,"text":357,"correct":22},"环境影响评价文件已批准",{"key":28,"text":359,"correct":26},"办理施工报建",{"key":31,"text":361,"correct":22},"年度水利投资计划下达",{"id":363,"libraryId":5,"type":15,"typeLabel":16,"stem":364,"options":365,"answer":20,"analysis":33},1150124,"（2017年）根据《关于水利工程建设项目代建制管理的指导意见》（水建管[2015]91号)，拟实施代建制的项目应在（ )阶段前选定代建单位。",[366,368,370,372],{"key":20,"text":367,"correct":26},"施工准备",{"key":24,"text":369,"correct":22},"开工建设",{"key":28,"text":371,"correct":22},"可行性研究报告",{"key":31,"text":373,"correct":22},"主体开工",{"id":375,"libraryId":5,"type":15,"typeLabel":16,"stem":376,"options":377,"answer":31,"analysis":33},1150125,"（2017年）水闸首次安全鉴定应在竣工验收后5年进行，以后每隔（ ）年进行一次全面安全鉴定。",[378,380,381,382],{"key":20,"text":379,"correct":22},"3",{"key":24,"text":284,"correct":22},{"key":28,"text":282,"correct":22},{"key":31,"text":280,"correct":26},{"id":384,"libraryId":5,"type":15,"typeLabel":16,"stem":385,"options":386,"answer":20,"analysis":33},1150126,"（2018年真题）根据《水利基本建设项目竣工财务决算编制规程》（SL19-2014），大型项目进行竣工决算时，未完工程投资和预留费用的比例不得超过（）的3%。",[387,389,391,393],{"key":20,"text":388,"correct":26},"总概算",{"key":24,"text":390,"correct":22},"总估算",{"key":28,"text":392,"correct":22},"预算总价",{"key":31,"text":394,"correct":22},"合同总价",{"id":396,"libraryId":5,"type":15,"typeLabel":16,"stem":397,"options":398,"answer":28,"analysis":33},1150127,"（2018年真题）水闸在首次安全鉴定后，以后应每隔（）年进行一次全面安全鉴定。",[399,400,402,403],{"key":20,"text":284,"correct":22},{"key":24,"text":401,"correct":22},"6",{"key":28,"text":280,"correct":26},{"key":31,"text":404,"correct":22},"15",{"id":406,"libraryId":5,"type":15,"typeLabel":16,"stem":407,"options":408,"answer":28,"analysis":33},1150128,"（2018年真题）根据《水利建设项目稽查办法》（水安监[2017]341号），稽查组应在现场结束后5个工作日内提交由（）签署的稽查报告。",[409,411,413,415],{"key":20,"text":410,"correct":22},"稽查专家",{"key":24,"text":412,"correct":22},"稽查人员",{"key":28,"text":414,"correct":26},"稽查特派员",{"key":31,"text":416,"correct":22},"特派员助理",{"id":418,"libraryId":5,"type":15,"typeLabel":16,"stem":419,"options":420,"answer":20,"analysis":33},1150129,"（2019年真题）根据《水利工程建设项目管理规定(试行)》，下列属于三项制度的是()。",[421,423,425,427],{"key":20,"text":422,"correct":26},"项目法人责任制、招标投标制、建设监理制",{"key":24,"text":424,"correct":22},"业主负责制、招标投标制、建设监理制",{"key":28,"text":426,"correct":22},"合同管理制、招标投标制、建设监理监督制",{"key":31,"text":428,"correct":22},"业主负责制、施工承包制、建设监理制",{"id":430,"libraryId":5,"type":15,"typeLabel":16,"stem":431,"options":432,"answer":24,"analysis":33},1150130,"（2019年真题）根据《水闸安全鉴定管理办法》，水闸首次安全鉴定应在竣工验收后()年内进行。",[433,434,435,436],{"key":20,"text":379,"correct":22},{"key":24,"text":284,"correct":26},{"key":28,"text":401,"correct":22},{"key":31,"text":280,"correct":22},{"id":438,"libraryId":5,"type":15,"typeLabel":16,"stem":439,"options":440,"answer":31,"analysis":33},1150131,"（2019年真题）工程静态总投资超过可行性研究报告相应估算静态总投资()，必须重新编制可行性研究报告并按原程序报批。",[441,443,445,447],{"key":20,"text":442,"correct":22},"5%",{"key":24,"text":444,"correct":22},"10%",{"key":28,"text":446,"correct":22},"12%",{"key":31,"text":448,"correct":26},"15%",{"id":450,"libraryId":5,"type":15,"typeLabel":16,"stem":451,"options":452,"answer":28,"analysis":33},1150132,"（2016年）已经通过审批的水利工程建设项目，重新招标时投标人仍少于3个的，经（ ）批准后可不再进行招标。",[453,455,456,458],{"key":20,"text":454,"correct":22},"地方人民政府",{"key":24,"text":340,"correct":22},{"key":28,"text":457,"correct":26},"行政监督部门",{"key":31,"text":459,"correct":22},"项目主管部门",{"id":461,"libraryId":5,"type":15,"typeLabel":16,"stem":462,"options":463,"answer":20,"analysis":33},1150133,"（2017年）根据水利部《水利工程施工转包违法分包等违法行为认定管理暂行办法》（水建管[2016]420号)，承包人未设立现场管理机构的属于（ ）。",[464,466,468,470],{"key":20,"text":465,"correct":26},"转包",{"key":24,"text":467,"correct":22},"违法分包",{"key":28,"text":469,"correct":22},"出借资质",{"key":31,"text":471,"correct":22},"借用资质",{"id":473,"libraryId":5,"type":15,"typeLabel":16,"stem":474,"options":475,"answer":20,"analysis":33},1150134,"（2015年）根据《水利工程设计变更管理暂行办法》（水规计［2012］93号），涉及工程规模发生较大变化的设计变更应事先征得（）的同意。",[476,478,480,482],{"key":20,"text":477,"correct":26},"原可行性研究报告批复部门",{"key":24,"text":479,"correct":22},"原初步设计审查部门",{"key":28,"text":481,"correct":22},"施工图设计审查部门",{"key":31,"text":459,"correct":22},{"id":484,"libraryId":5,"type":15,"typeLabel":16,"stem":485,"options":486,"answer":28,"analysis":33},1150135,"（2018年真题）根据《水利工程施工转包违法分包等违法行为认定查出管理暂行办法》（水建管[2016]420号）“工程款支付凭证上载明的单位与施工合同中载明的施工单位不一致”的情形属于（）。",[487,488,489,491],{"key":20,"text":465,"correct":22},{"key":24,"text":467,"correct":22},{"key":28,"text":490,"correct":26},"出借借用资质",{"key":31,"text":492,"correct":22},"其他违法行为",{"id":494,"libraryId":5,"type":15,"typeLabel":16,"stem":495,"options":496,"answer":28,"analysis":33},1150136,"（2013年）水利建设市场主体信用等级中的BBB级表示信用（）。",[497,499,501,503],{"key":20,"text":498,"correct":22},"好",{"key":24,"text":500,"correct":22},"较好",{"key":28,"text":502,"correct":26},"一般",{"key":31,"text":504,"correct":22},"差",{"id":506,"libraryId":5,"type":15,"typeLabel":16,"stem":507,"options":508,"answer":24,"analysis":33},1150137,"（2016年）根据《水利水电工程标准施工招标文件》（2009年版），在承包人索赔处理程序中，如承包人接受索赔处理结果，发包人最迟应在作出索赔处理结果答复后（）天内完成赔付。",[509,510,512,514],{"key":20,"text":278,"correct":22},{"key":24,"text":511,"correct":26},"28",{"key":28,"text":513,"correct":22},"42",{"key":31,"text":515,"correct":22},"56",{"id":517,"libraryId":5,"type":15,"typeLabel":16,"stem":518,"options":519,"answer":28,"analysis":33},1150138,"（2018年真题）根据《根据中华人民共和国招投标法实施条例》国务院令第613号，投标保证金最高不得超过（）万元。",[520,522,524,526],{"key":20,"text":521,"correct":22},"30",{"key":24,"text":523,"correct":22},"50",{"key":28,"text":525,"correct":26},"80",{"key":31,"text":527,"correct":22},"100",{"id":529,"libraryId":5,"type":15,"typeLabel":16,"stem":530,"options":531,"answer":28,"analysis":33},1150139,"（2016年）水利工程质量缺陷备案表由（ ）组织填写。",[532,533,535,537],{"key":20,"text":338,"correct":22},{"key":24,"text":534,"correct":22},"建设单位",{"key":28,"text":536,"correct":26},"监理单位",{"key":31,"text":538,"correct":22},"设计单位",{"id":540,"libraryId":5,"type":15,"typeLabel":16,"stem":541,"options":542,"answer":28,"analysis":33},1150140,"（2013年）根据《水利工程质量监督规定》（水建〔1997〕339号），水利工程建设项目质量监督方式以（ ）为主。",[543,545,547,549],{"key":20,"text":544,"correct":22},"跟踪",{"key":24,"text":546,"correct":22},"巡视",{"key":28,"text":548,"correct":26},"抽查",{"key":31,"text":550,"correct":22},"旁站",{"id":552,"libraryId":5,"type":15,"typeLabel":16,"stem":553,"options":554,"answer":28,"analysis":33},1150141,"（2009年）某水电站进水口边坡施工中发生质量事故，经调查，事故造成直接经济损失约20万元，处理后不影响工程正常使用和寿命。根据有关规定，该事故属于（）。",[555,557,559,561],{"key":20,"text":556,"correct":22},"重大质量事故",{"key":24,"text":558,"correct":22},"较大质量事故",{"key":28,"text":560,"correct":26},"一般质量事故",{"key":31,"text":562,"correct":22},"质量缺陷",{"id":564,"libraryId":5,"type":15,"typeLabel":16,"stem":565,"options":566,"answer":20,"analysis":33},1150142,"（2010年）根据《水利工程质量监督管理规定》，质量监督机构的兼职质量监督员可来自承担该工程任务的（）单位。",[567,569,571,573],{"key":20,"text":568,"correct":26},"招标代理",{"key":24,"text":570,"correct":22},"监理",{"key":28,"text":572,"correct":22},"设计",{"key":31,"text":574,"correct":22},"施工",{"id":576,"libraryId":5,"type":15,"typeLabel":16,"stem":577,"options":578,"answer":28,"analysis":33},1150143,"（2013年）根据《水利工程质量监督规定》（水建1997 339号），水利工程建设项目质量监督方式以（）为主。",[579,580,581,582],{"key":20,"text":544,"correct":22},{"key":24,"text":546,"correct":22},{"key":28,"text":548,"correct":26},{"key":31,"text":550,"correct":22},[584,587,590,593,596,599],{"id":15,"name":585,"category":7,"favorite":586},"领导干部任职前廉政法规知识测试题",92,{"id":588,"name":589,"category":7,"favorite":15},595,"建筑结构与设备",{"id":591,"name":592,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":594,"name":595,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":597,"name":598,"category":7,"favorite":8},534,"BIM工程师",{"id":600,"name":598,"category":7,"favorite":8},535]