[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-803-28":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":737},{"id":5,"name":6,"category":7,"favorite":8},803,"一建水利水电工程实务","建筑工程",0,28,50,1981,[13,38,53,68,83,98,112,127,142,157,171,185,199,214,229,244,259,274,288,302,315,329,344,359,374,388,402,416,430,445,459,473,482,496,510,524,539,553,567,581,596,610,624,638,650,665,679,694,708,723],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1151369,2,"多选题","（2011年）根据《水土保持法》，生产建设项目中的水土保持设施应当与主体工程同时（）。",[19,23,27,30,33],{"key":20,"text":21,"correct":22},"A","设计",true,{"key":24,"text":25,"correct":26},"B","批复",false,{"key":28,"text":29,"correct":22},"C","施工",{"key":31,"text":32,"correct":26},"D","验收",{"key":34,"text":35,"correct":22},"E","投产使用","ACE","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},1151370,"（2018真题）根据《水工程建设规划同意书制度管理办法（试行）》（水利部令第31号），水利工程不用办理规划同意书的有（）。",[42,44,46,48,50],{"key":20,"text":43,"correct":22},"桥梁",{"key":24,"text":45,"correct":26},"堤防",{"key":28,"text":47,"correct":26},"水电站",{"key":31,"text":49,"correct":22},"码头",{"key":34,"text":51,"correct":26},"水库","AD",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":37},1151371,"（2018年真题）《水利水电规程施工安全防护设施技术规范》（SL714-2015）中，载人提升机械应设计的安全装置包括（）。",[57,59,61,63,65],{"key":20,"text":58,"correct":22},"超载保护装置",{"key":24,"text":60,"correct":22},"断绳保护装置",{"key":28,"text":62,"correct":26},"防爆保护装置",{"key":31,"text":64,"correct":22},"限速保护装置",{"key":34,"text":66,"correct":26},"防雨保护装置","ABD",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":82,"analysis":37},1151372,"（2019年真题）按照《取水许可制度实施办法》，在()取水需要办理取水许可。",[72,74,76,78,80],{"key":20,"text":73,"correct":22},"江河",{"key":24,"text":75,"correct":22},"湖泊",{"key":28,"text":77,"correct":22},"地下水",{"key":31,"text":79,"correct":26},"农村集体水库",{"key":34,"text":81,"correct":26},"农村集体水塘","ABC",{"id":84,"libraryId":5,"type":15,"typeLabel":16,"stem":85,"options":86,"answer":97,"analysis":37},1151373,"截流工程中，可以减小截流难度的技术措施包括（ ）。",[87,89,91,93,95],{"key":20,"text":88,"correct":26},"减少分流量",{"key":24,"text":90,"correct":22},"改善龙口水力条件",{"key":28,"text":92,"correct":22},"增大抛投块料的稳定性",{"key":31,"text":94,"correct":26},"降低截流施工强度",{"key":34,"text":96,"correct":22},"合理选择截流时段","BCE",{"id":99,"libraryId":5,"type":15,"typeLabel":16,"stem":100,"options":101,"answer":67,"analysis":37},1151374,"钢板桩格形围堰按挡水高度不同，平面形式有（ ）。",[102,104,106,108,110],{"key":20,"text":103,"correct":22},"圆筒形格体",{"key":24,"text":105,"correct":22},"扇形格体",{"key":28,"text":107,"correct":26},"三角形格体",{"key":31,"text":109,"correct":22},"花瓣形格体",{"key":34,"text":111,"correct":26},"矩形格体",{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":126,"analysis":37},1151375,"下列属于分段围堰法导流的有（ ）。",[116,118,120,122,124],{"key":20,"text":117,"correct":22},"束窄河床导流",{"key":24,"text":119,"correct":22},"通过建筑物导流",{"key":28,"text":121,"correct":26},"明渠导流",{"key":31,"text":123,"correct":26},"隧洞导流",{"key":34,"text":125,"correct":26},"涵管导流","AB",{"id":128,"libraryId":5,"type":15,"typeLabel":16,"stem":129,"options":130,"answer":141,"analysis":37},1151376,"截流工程中，分流条件的好坏直接影响到截流过程中龙口的（ ）。",[131,133,135,137,139],{"key":20,"text":132,"correct":22},"流量",{"key":24,"text":134,"correct":26},"稳定性",{"key":28,"text":136,"correct":26},"截流强度",{"key":31,"text":138,"correct":22},"落差",{"key":34,"text":140,"correct":22},"流速","ADE",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":156,"analysis":37},1151377,"土坝截流施工中，改善龙口水力条件的措施包括（ ）。",[146,148,150,152,154],{"key":20,"text":147,"correct":26},"定向爆破",{"key":24,"text":149,"correct":22},"双戗截流",{"key":28,"text":151,"correct":22},"三戗截流",{"key":31,"text":153,"correct":22},"宽戗截流",{"key":34,"text":155,"correct":22},"平抛垫底","BCDE",{"id":158,"libraryId":5,"type":15,"typeLabel":16,"stem":159,"options":160,"answer":156,"analysis":37},1151378,"基坑排水技术中，初期排水应考虑的因素有（ ）。",[161,163,165,167,169],{"key":20,"text":162,"correct":26},"施工弃水量",{"key":24,"text":164,"correct":22},"围堰渗水量",{"key":28,"text":166,"correct":22},"堰身含水量",{"key":31,"text":168,"correct":22},"基坑积水量",{"key":34,"text":170,"correct":22},"可能的降水量",{"id":172,"libraryId":5,"type":15,"typeLabel":16,"stem":173,"options":174,"answer":52,"analysis":37},1151379,"以下关于帷幕灌浆和固结灌浆质量检查的说法中，正确的是（ ）。",[175,177,179,181,183],{"key":20,"text":176,"correct":22},"两种灌浆方式均采用压水试验进行检查",{"key":24,"text":178,"correct":26},"两种灌浆方式检查孔的数量均不宜少于灌浆孔总数的5%",{"key":28,"text":180,"correct":26},"帷幕灌浆坝体混凝土与基岩接触段的透水率的合格率应达到98%以上",{"key":31,"text":182,"correct":22},"两种灌浆方式不合格孔段的透水率均不应超过设计规定值的150%，且不集中",{"key":34,"text":184,"correct":26},"固结灌浆中单元工程内检查孔各段的合格率应达到90%以上",{"id":186,"libraryId":5,"type":15,"typeLabel":16,"stem":187,"options":188,"answer":82,"analysis":37},1151380,"砂砾石地基的特点包括（ ）。",[189,191,193,195,197],{"key":20,"text":190,"correct":22},"空隙大",{"key":24,"text":192,"correct":22},"孔隙率高",{"key":28,"text":194,"correct":22},"渗透性强",{"key":31,"text":196,"correct":26},"含水量大",{"key":34,"text":198,"correct":26},"触变性强",{"id":200,"libraryId":5,"type":15,"typeLabel":16,"stem":201,"options":202,"answer":213,"analysis":37},1151381,"确定帷幕灌浆中各类钻孔孔径的依据有（ ）。",[203,205,207,209,211],{"key":20,"text":204,"correct":22},"地质条件",{"key":24,"text":206,"correct":22},"钻孔深度",{"key":28,"text":208,"correct":22},"钻孔方法",{"key":31,"text":210,"correct":26},"钻孔用途",{"key":34,"text":212,"correct":22},"灌浆方法","ABCE",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":228,"analysis":37},1151382,"灌浆按浆液材料可分为（ ）。",[218,220,222,224,226],{"key":20,"text":219,"correct":22},"水泥灌浆",{"key":24,"text":221,"correct":22},"黏土灌浆",{"key":28,"text":223,"correct":26},"帷幕灌浆",{"key":31,"text":225,"correct":26},"固结灌浆",{"key":34,"text":227,"correct":22},"化学灌浆","ABE",{"id":230,"libraryId":5,"type":15,"typeLabel":16,"stem":231,"options":232,"answer":243,"analysis":37},1151383,"下列属于高压喷射灌浆基本方法的有（ ）。",[233,235,237,239,241],{"key":20,"text":234,"correct":22},"单管法",{"key":24,"text":236,"correct":22},"二管法",{"key":28,"text":238,"correct":26},"新二管法",{"key":31,"text":240,"correct":22},"三管法",{"key":34,"text":242,"correct":22},"新三管法","ABDE",{"id":245,"libraryId":5,"type":15,"typeLabel":16,"stem":246,"options":247,"answer":258,"analysis":37},1151385,"关于爆破后检查说法不正确的是（ ）。",[248,250,252,254,256],{"key":20,"text":249,"correct":26},"明挖爆破时，应在爆破后5min 进入工作面",{"key":24,"text":251,"correct":22},"明挖爆破，当不能确定有无盲炮时，应在爆破后10min 进入工作面",{"key":28,"text":253,"correct":22},"地下洞室爆破应在爆破后10min，并经检查确认洞室内空气合格后，方可准许人员进入工作面",{"key":31,"text":255,"correct":26},"拆除爆破应等待倒塌建( 构) 筑物稳定之后, 方可准许人员进入现场",{"key":34,"text":257,"correct":26},"拆除爆破应等待倒保留建( 构) 筑物稳定之后, 方可准许人员进入现场","BC",{"id":260,"libraryId":5,"type":15,"typeLabel":16,"stem":261,"options":262,"answer":273,"analysis":37},1151386,"对土料场的质量检查和控制中，应经常检查的项目包括（ ）。",[263,265,267,269,271],{"key":20,"text":264,"correct":22},"土块大小",{"key":24,"text":266,"correct":22},"杂质含量",{"key":28,"text":268,"correct":22},"含水量",{"key":31,"text":270,"correct":22},"土质情况",{"key":34,"text":272,"correct":26},"铺土厚度","ABCD",{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":213,"analysis":37},1151387,"铲运机是一种循环作业机械，由（ ）等过程组成。",[278,280,282,284,286],{"key":20,"text":279,"correct":22},"铲土",{"key":24,"text":281,"correct":22},"运土",{"key":28,"text":283,"correct":22},"卸土",{"key":31,"text":285,"correct":26},"掉头",{"key":34,"text":287,"correct":22},"回驶",{"id":289,"libraryId":5,"type":15,"typeLabel":16,"stem":290,"options":291,"answer":156,"analysis":37},1151388,"关于土石坝填筑作业的说法，正确的有（ ）。",[292,294,296,298,300],{"key":20,"text":293,"correct":26},"铺料宜垂直于坝轴线进行，超径块料应打碎",{"key":24,"text":295,"correct":22},"按碾压测试确定的厚度铺料.整平",{"key":28,"text":297,"correct":22},"黏性土含水量较低，主要应在料场加水",{"key":31,"text":299,"correct":22},"石渣料压实前应充分加水",{"key":34,"text":301,"correct":22},"采用气胎碾压实的土层，应刨毛处理，以利层间结合",{"id":303,"libraryId":5,"type":15,"typeLabel":16,"stem":304,"options":305,"answer":258,"analysis":37},1151389,"黏土心墙土石坝在碾压黏土防渗体与坝壳料交界处，应先确定的压实参数包括（ ）。",[306,308,310,311,313],{"key":20,"text":307,"correct":26},"含水率",{"key":24,"text":309,"correct":22},"碾压遍数",{"key":28,"text":272,"correct":22},{"key":31,"text":312,"correct":26},"振动频率",{"key":34,"text":314,"correct":26},"行走速率",{"id":316,"libraryId":5,"type":15,"typeLabel":16,"stem":317,"options":318,"answer":258,"analysis":37},1151390,"以下关于后退法相较于进占法卸料的优点，正确的是（ ）。",[319,321,323,325,327],{"key":20,"text":320,"correct":26},"可以加快施工进度",{"key":24,"text":322,"correct":22},"对轮胎磨损比较轻",{"key":28,"text":324,"correct":22},"可以减轻物料的分离",{"key":31,"text":326,"correct":26},"会增大物料的分离",{"key":34,"text":328,"correct":26},"可显著减轻推土机的摊平工作量",{"id":330,"libraryId":5,"type":15,"typeLabel":16,"stem":331,"options":332,"answer":343,"analysis":37},1151391,"以下属于土石坝施工作业中辅助作业的有（ ）。",[333,335,337,339,341],{"key":20,"text":334,"correct":26},"场内通水通电",{"key":24,"text":336,"correct":26},"排水清基",{"key":28,"text":338,"correct":22},"层间刨毛",{"key":31,"text":340,"correct":26},"坝坡修整",{"key":34,"text":342,"correct":22},"坝面排水","CE",{"id":345,"libraryId":5,"type":15,"typeLabel":16,"stem":346,"options":347,"answer":358,"analysis":37},1151392,"压实机械分为（ ）等几种。",[348,350,352,354,356],{"key":20,"text":349,"correct":22},"静压碾压",{"key":24,"text":351,"correct":26},"羊脚碾",{"key":28,"text":353,"correct":22},"振动碾压",{"key":31,"text":355,"correct":22},"夯击",{"key":34,"text":357,"correct":26},"气胎碾","ACD",{"id":360,"libraryId":5,"type":15,"typeLabel":16,"stem":361,"options":362,"answer":373,"analysis":37},1151393,"土石坝根据施工方法可分为（ ）。",[363,365,367,369,371],{"key":20,"text":364,"correct":22},"干填碾压式",{"key":24,"text":366,"correct":26},"湿填碾压式",{"key":28,"text":368,"correct":22},"水中填土",{"key":31,"text":370,"correct":22},"水力冲填",{"key":34,"text":372,"correct":22},"定向爆破修筑","ACDE",{"id":375,"libraryId":5,"type":15,"typeLabel":16,"stem":376,"options":377,"answer":273,"analysis":37},1151394,"堆石坝坝体材料分区基本定型，主要有（ ）。",[378,380,382,384,386],{"key":20,"text":379,"correct":22},"垫层区",{"key":24,"text":381,"correct":22},"过渡区",{"key":28,"text":383,"correct":22},"主堆石区",{"key":31,"text":385,"correct":22},"下游堆石区",{"key":34,"text":387,"correct":26},"底层区",{"id":389,"libraryId":5,"type":15,"typeLabel":16,"stem":390,"options":391,"answer":273,"analysis":37},1151395,"沥青混凝土施工必须根据材料的（ ），通过试验确定不同温度的控制标准。",[392,394,396,398,400],{"key":20,"text":393,"correct":22},"性质",{"key":24,"text":395,"correct":22},"配比",{"key":28,"text":397,"correct":22},"不同地区",{"key":31,"text":399,"correct":22},"不同季节",{"key":34,"text":401,"correct":26},"放置时间",{"id":403,"libraryId":5,"type":15,"typeLabel":16,"stem":404,"options":405,"answer":258,"analysis":37},1151396,"混凝土坝的混凝土铺料间隔时间主要受混凝土（ ）的限制。",[406,408,410,412,414],{"key":20,"text":407,"correct":26},"终凝时间",{"key":24,"text":409,"correct":22},"初凝时间",{"key":28,"text":411,"correct":22},"温控要求",{"key":31,"text":413,"correct":26},"运输能力",{"key":34,"text":415,"correct":26},"浇筑能力",{"id":417,"libraryId":5,"type":15,"typeLabel":16,"stem":418,"options":419,"answer":82,"analysis":37},1151397,"混凝土坝出现冷缝时，会使层间的（ ）明显降低。",[420,422,424,426,428],{"key":20,"text":421,"correct":22},"抗渗能力",{"key":24,"text":423,"correct":22},"抗剪能力",{"key":28,"text":425,"correct":22},"抗拉能力",{"key":31,"text":427,"correct":26},"抗压能力",{"key":34,"text":429,"correct":26},"抗冻能力",{"id":431,"libraryId":5,"type":15,"typeLabel":16,"stem":432,"options":433,"answer":444,"analysis":37},1151398,"钢筋连接时，直径小于等于28mm的热轧钢筋接头，可以采用的焊接方式有（ ）。",[434,436,438,440,442],{"key":20,"text":435,"correct":26},"熔槽焊",{"key":24,"text":437,"correct":26},"窄间隙焊",{"key":28,"text":439,"correct":26},"帮条焊",{"key":31,"text":441,"correct":22},"手工电弧搭接焊",{"key":34,"text":443,"correct":22},"闪光对焊","DE",{"id":446,"libraryId":5,"type":15,"typeLabel":16,"stem":447,"options":448,"answer":273,"analysis":37},1151399,"模板根据架立和工作特征可分为（ ）。",[449,451,453,455,457],{"key":20,"text":450,"correct":22},"固定式",{"key":24,"text":452,"correct":22},"拆移式",{"key":28,"text":454,"correct":22},"移动式",{"key":31,"text":456,"correct":22},"滑升式",{"key":34,"text":458,"correct":26},"折叠式",{"id":460,"libraryId":5,"type":15,"typeLabel":16,"stem":461,"options":462,"answer":444,"analysis":37},1151400,"在混凝土的质量控制中，应按试件强度的（ ）进行控制。",[463,465,467,469,471],{"key":20,"text":464,"correct":26},"平均值",{"key":24,"text":466,"correct":26},"中位数",{"key":28,"text":468,"correct":26},"极差",{"key":31,"text":470,"correct":22},"标准差",{"key":34,"text":472,"correct":22},"离差系数",{"id":474,"libraryId":5,"type":15,"typeLabel":16,"stem":475,"options":476,"answer":126,"analysis":37},1151401,"堤防压实作业前碾压试验需确定的碾压参数包括（ ）。",[477,478,479,480,481],{"key":20,"text":309,"correct":22},{"key":24,"text":272,"correct":22},{"key":28,"text":307,"correct":26},{"key":31,"text":312,"correct":26},{"key":34,"text":314,"correct":26},{"id":483,"libraryId":5,"type":15,"typeLabel":16,"stem":484,"options":485,"answer":373,"analysis":37},1151403,"下列关于护岸护坡形式及施工方法的说法正确的是（ ）。",[486,488,490,492,494],{"key":20,"text":487,"correct":22},"护岸工程施工应先护脚后护坡",{"key":24,"text":489,"correct":26},"上下层砌筑的干砌石护坡应齐缝砌筑",{"key":28,"text":491,"correct":22},"浆砌石护坡需设排水孔",{"key":31,"text":493,"correct":22},"游荡性河流护岸宜采用坝式护岸",{"key":34,"text":495,"correct":22},"原坡面为砾、卵石的浆砌石护坡可不设垫层",{"id":497,"libraryId":5,"type":15,"typeLabel":16,"stem":498,"options":499,"answer":273,"analysis":37},1151404,"坝式防护分为（ ）四种形式。",[500,502,504,506,508],{"key":20,"text":501,"correct":22},"丁坝护岸",{"key":24,"text":503,"correct":22},"顺坝护岸",{"key":28,"text":505,"correct":22},"丁顺坝护岸",{"key":31,"text":507,"correct":22},"潜坝护岸",{"key":34,"text":509,"correct":26},"平顺护岸",{"id":511,"libraryId":5,"type":15,"typeLabel":16,"stem":512,"options":513,"answer":213,"analysis":37},1151405,"以下应包含在闸门标志中的内容有（ ）。",[514,516,518,520,522],{"key":20,"text":515,"correct":22},"制造厂名",{"key":24,"text":517,"correct":22},"产品名称",{"key":28,"text":519,"correct":22},"制造日期",{"key":31,"text":521,"correct":26},"尺寸大小",{"key":34,"text":523,"correct":22},"闸门总重量",{"id":525,"libraryId":5,"type":15,"typeLabel":16,"stem":526,"options":527,"answer":538,"analysis":37},1151406,"冲击式水轮机按射流冲击转轮的方向不同分为（ ）。",[528,530,532,534,536],{"key":20,"text":529,"correct":26},"混流式",{"key":24,"text":531,"correct":22},"水斗式",{"key":28,"text":533,"correct":26},"轴流式",{"key":31,"text":535,"correct":22},"斜击式",{"key":34,"text":537,"correct":22},"双击式","BDE",{"id":540,"libraryId":5,"type":15,"typeLabel":16,"stem":541,"options":542,"answer":373,"analysis":37},1151407,"水闸混凝土工程施工的原则包括（ ）。",[543,545,547,549,551],{"key":20,"text":544,"correct":22},"先深后浅",{"key":24,"text":546,"correct":26},"先轻后重",{"key":28,"text":548,"correct":22},"先高后矮",{"key":31,"text":550,"correct":22},"先主后次",{"key":34,"text":552,"correct":22},"先上游后下游",{"id":554,"libraryId":5,"type":15,"typeLabel":16,"stem":555,"options":556,"answer":273,"analysis":37},1151408,"水闸下游连接段主要包括（ ）。",[557,559,561,563,565],{"key":20,"text":558,"correct":22},"护坦",{"key":24,"text":560,"correct":22},"海漫",{"key":28,"text":562,"correct":22},"下游防冲槽",{"key":31,"text":564,"correct":22},"下游翼墙",{"key":34,"text":566,"correct":26},"工作桥",{"id":568,"libraryId":5,"type":15,"typeLabel":16,"stem":569,"options":570,"answer":343,"analysis":37},1151409,"移动式启闭机形式主要有（ ）。",[571,573,575,577,579],{"key":20,"text":572,"correct":26},"卷扬式启闭机",{"key":24,"text":574,"correct":26},"螺杆式启闭机",{"key":28,"text":576,"correct":22},"门式启闭机",{"key":31,"text":578,"correct":26},"油压式启闭机",{"key":34,"text":580,"correct":22},"桥式启闭机",{"id":582,"libraryId":5,"type":15,"typeLabel":16,"stem":583,"options":584,"answer":595,"analysis":37},1151411,"下列作业中，不属于特殊高处作业的是（ ）。",[585,587,589,591,593],{"key":20,"text":586,"correct":22},"高原高处作业",{"key":24,"text":588,"correct":26},"悬空高处作业",{"key":28,"text":590,"correct":26},"强风高处作业",{"key":31,"text":592,"correct":26},"夜间高处作业",{"key":34,"text":594,"correct":22},"抢修高处作业","AE",{"id":597,"libraryId":5,"type":15,"typeLabel":16,"stem":598,"options":599,"answer":52,"analysis":37},1151412,"以下关于爆破作业的说法，错误的是（ ）。",[600,602,604,606,608],{"key":20,"text":601,"correct":22},"禁止使用翻斗车、拖车、机动车等运输爆破器材，只可使用自卸汽车运输",{"key":24,"text":603,"correct":26},"电力起爆时，用于同一爆破网路内的电雷管，电阻值应相同",{"key":28,"text":605,"correct":26},"雷雨天严禁采用电爆网路",{"key":31,"text":607,"correct":22},"导爆索只能用剪刀剪断",{"key":34,"text":609,"correct":26},"火花起爆时，当信号炮响后，全体人员应立即撤出炮区",{"id":611,"libraryId":5,"type":15,"typeLabel":16,"stem":612,"options":613,"answer":243,"analysis":37},1151413,"关于施工现场临时10kv 变压器安装的说法中，正确的是（ ）。",[614,616,618,620,622],{"key":20,"text":615,"correct":22},"变压器装于地面时，应有0.5m 的高台",{"key":24,"text":617,"correct":22},"装于地面的变压器周围应装设栅栏",{"key":28,"text":619,"correct":26},"杆上变压器安装的高度应不低于1.0m",{"key":31,"text":621,"correct":22},"杆上变压器应挂有“止步、高压危险”的警示标志",{"key":34,"text":623,"correct":22},"变压器的引线应采用绝缘导线",{"id":625,"libraryId":5,"type":15,"typeLabel":16,"stem":626,"options":627,"answer":373,"analysis":37},1151414,"下列关于安全工具检验周期的说法正确的是（ ）。",[628,630,632,634,636],{"key":20,"text":629,"correct":22},"新安全带使用一年后抽样试验",{"key":24,"text":631,"correct":26},"塑料安全帽应半年检验一次",{"key":28,"text":633,"correct":22},"旧安全带每隔6 个月抽查试验一次",{"key":31,"text":635,"correct":22},"安全带在每次使用前均应检查",{"key":34,"text":637,"correct":22},"安全网应每年检查一次，且在每次使用前进行外表检查",{"id":639,"libraryId":5,"type":15,"typeLabel":16,"stem":640,"options":641,"answer":213,"analysis":37},1151415,"下列属于特殊高处作业的有（ ）。",[642,643,645,647,649],{"key":20,"text":590,"correct":22},{"key":24,"text":644,"correct":22},"异温高处作业",{"key":28,"text":646,"correct":22},"雪天高处作业",{"key":31,"text":648,"correct":26},"雾天高处作业",{"key":34,"text":592,"correct":22},{"id":651,"libraryId":5,"type":15,"typeLabel":16,"stem":652,"options":653,"answer":664,"analysis":37},1151416,"下列不能用于点燃导火索的工具有（ ）。",[654,656,658,660,662],{"key":20,"text":655,"correct":26},"香",{"key":24,"text":657,"correct":26},"专用点火工具",{"key":28,"text":659,"correct":22},"火柴",{"key":31,"text":661,"correct":22},"香烟",{"key":34,"text":663,"correct":22},"打火机","CDE",{"id":666,"libraryId":5,"type":15,"typeLabel":16,"stem":667,"options":668,"answer":343,"analysis":37},1151417,"进行如下（ ）高处作业时，可不制定专项安全技术措施。",[669,671,673,675,677],{"key":20,"text":670,"correct":26},"三级",{"key":24,"text":672,"correct":26},"特级",{"key":28,"text":674,"correct":22},"夜间",{"key":31,"text":676,"correct":26},"悬空",{"key":34,"text":678,"correct":22},"带电",{"id":680,"libraryId":5,"type":15,"typeLabel":16,"stem":681,"options":682,"answer":693,"analysis":37},1151418,"下列材料用量对比关系中，不属于混凝土配合比设计内容的是（ ）。",[683,685,687,689,691],{"key":20,"text":684,"correct":26},"砂率",{"key":24,"text":686,"correct":22},"水砂比",{"key":28,"text":688,"correct":26},"水胶比",{"key":31,"text":690,"correct":26},"浆骨比",{"key":34,"text":692,"correct":22},"砂石化","BE",{"id":695,"libraryId":5,"type":15,"typeLabel":16,"stem":696,"options":697,"answer":664,"analysis":37},1151419,"水利工程施工中，钢绞线质量检验的主要指标包括（ ）",[698,700,702,704,706],{"key":20,"text":699,"correct":26},"含碳量",{"key":24,"text":701,"correct":26},"屈服强度",{"key":28,"text":703,"correct":22},"极限强度",{"key":31,"text":705,"correct":22},"伸长率",{"key":34,"text":707,"correct":22},"冷弯性能",{"id":709,"libraryId":5,"type":15,"typeLabel":16,"stem":710,"options":711,"answer":722,"analysis":37},1151420,"大坝混凝土粗骨料最大粒径为80mm 时，施工中粒径分级宜包括（ ）。",[712,714,716,718,720],{"key":20,"text":713,"correct":26},"D10",{"key":24,"text":715,"correct":22},"D20",{"key":28,"text":717,"correct":22},"D40",{"key":31,"text":719,"correct":22},"D80",{"key":34,"text":721,"correct":26},"D120","BCD",{"id":724,"libraryId":5,"type":15,"typeLabel":16,"stem":725,"options":726,"answer":36,"analysis":37},1151421,"关于水利工程施工期间外部变形监测的说法，正确的是（ ）",[727,729,731,733,735],{"key":20,"text":728,"correct":22},"监测控制点的精度应不低于四等网的标准",{"key":24,"text":730,"correct":26},"基点必须建立在变形区以内稳固的基岩上",{"key":28,"text":732,"correct":22},"测点应与变形件牢固结合",{"key":31,"text":734,"correct":26},"滑坡测点宜设在滑动量小的部位",{"key":34,"text":736,"correct":22},"山体裂缝观测点应埋设在裂缝两侧",[738,742,745,748,751,754],{"id":739,"name":740,"category":7,"favorite":741},1,"领导干部任职前廉政法规知识测试题",92,{"id":743,"name":744,"category":7,"favorite":739},595,"建筑结构与设备",{"id":746,"name":747,"category":7,"favorite":739},715,"招标采购专业知识与法律法规",{"id":749,"name":750,"category":7,"favorite":739},848,"市政方向-通用基础",{"id":752,"name":753,"category":7,"favorite":8},534,"BIM工程师",{"id":755,"name":753,"category":7,"favorite":8},535]