[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-803-27":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":723},{"id":5,"name":6,"category":7,"favorite":8},803,"一建水利水电工程实务","建筑工程",0,27,50,1981,[13,38,53,67,82,97,112,127,142,155,164,179,194,209,224,238,253,268,282,296,307,321,335,349,363,375,389,403,418,432,446,461,475,489,503,517,531,540,555,569,584,597,611,625,638,652,666,680,694,708],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1151319,2,"多选题","(2014年)下列关于钢筋代换的说法，正确的有（）",[19,23,26,30,33],{"key":20,"text":21,"correct":22},"A","应按钢筋承载力设计值相等的原则进行代换",true,{"key":24,"text":25,"correct":22},"B","以高一级钢筋代换低一级钢筋时，宜采用改变钢筋直径的方法来减少钢筋截面积",{"key":27,"text":28,"correct":29},"C","以高一级钢筋代换低一级钢筋时，宜采用改变钢筋根数的方法来减少钢筋截面积",false,{"key":31,"text":32,"correct":22},"D","用同钢号某直径钢筋代替另一种直径的钢筋时，其直径变化范围不宜超过4mm",{"key":34,"text":35,"correct":22},"E","主筋采取同钢号的钢筋代换时，应保持间距不变","ABDE","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},1151320,"（2014年）下列措施中，属于大体积混凝土温控措施的有（ ）。",[42,44,46,48,50],{"key":20,"text":43,"correct":22},"采用干硬性贫混凝土",{"key":24,"text":45,"correct":22},"采用高效减水剂",{"key":27,"text":47,"correct":22},"采用低发热量水泥",{"key":31,"text":49,"correct":22},"采用薄层浇筑",{"key":34,"text":51,"correct":29},"采用预冷水泥","ABCD",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":66,"analysis":37},1151321,"（2017年）大体积混凝土施工中降低混凝土的发热量的措施有（ ）",[57,59,61,63,65],{"key":20,"text":58,"correct":29},"骨料预冷",{"key":24,"text":60,"correct":22},"采用低流态干硬性贫混凝土",{"key":27,"text":62,"correct":22},"增大骨料粒径",{"key":31,"text":64,"correct":22},"大量掺粉煤灰",{"key":34,"text":45,"correct":22},"BCDE",{"id":68,"libraryId":5,"type":15,"typeLabel":16,"stem":69,"options":70,"answer":81,"analysis":37},1151322,"（2010年）混凝土坝施工质量检查和监测的方法包括（ ）",[71,73,75,77,79],{"key":20,"text":72,"correct":22},"物理监测",{"key":24,"text":74,"correct":29},"化学监测",{"key":27,"text":76,"correct":22},"钻孔压水",{"key":31,"text":78,"correct":22},"大块取样",{"key":34,"text":80,"correct":22},"原型观测","ACDE",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":96,"analysis":37},1151323,"（2006年）河道护岸工程的主要形式包括（）。",[86,88,90,92,94],{"key":20,"text":87,"correct":22},"平顺护岸",{"key":24,"text":89,"correct":29},"顺向护岸",{"key":27,"text":91,"correct":29},"逆向护岸",{"key":31,"text":93,"correct":22},"丁坝护岸",{"key":34,"text":95,"correct":22},"矶头护岸","ADE",{"id":98,"libraryId":5,"type":15,"typeLabel":16,"stem":99,"options":100,"answer":111,"analysis":37},1151324,"（2011年）关于新筑堤防作业的说法，正确的有（）。",[101,103,105,107,109],{"key":20,"text":102,"correct":22},"作业面应水平分层，不得顺坡铺填",{"key":24,"text":104,"correct":22},"机械施工时，分段作业面长度不应小于100m",{"key":27,"text":106,"correct":22},"分段作业面上、下层不得在同一位置分段",{"key":31,"text":108,"correct":29},"碾压机具行走方向，不得平行于堤轴线",{"key":34,"text":110,"correct":22},"土料铺填与压实工序应连续进行","ABCE",{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":126,"analysis":37},1151325,"（2013年）关于疏浚工程断面质量控制标准的说法，正确的有（ ）。",[116,118,120,122,124],{"key":20,"text":117,"correct":29},"横断面中心线偏移不得大于1.5m",{"key":24,"text":119,"correct":22},"水下横断面边坡按台阶形开挖时，允许下超上欠，超欠比应控制在1～1.5",{"key":27,"text":121,"correct":29},"局部欠挖部位的欠挖厚度小于设计水深的5％，且不大于50cm",{"key":31,"text":123,"correct":22},"纵断面上不得有连续两个欠挖点，且欠挖值不得大于30cm",{"key":34,"text":125,"correct":29},"纵断面测点间距不应大于200m","BD",{"id":128,"libraryId":5,"type":15,"typeLabel":16,"stem":129,"options":130,"answer":141,"analysis":37},1151326,"（2016年）水闸混凝土工程施工的原则包括（ ）。",[131,133,135,137,139],{"key":20,"text":132,"correct":29},"先浅后深",{"key":24,"text":134,"correct":22},"先重后轻",{"key":27,"text":136,"correct":22},"先高后矮",{"key":31,"text":138,"correct":22},"先主后次",{"key":34,"text":140,"correct":29},"先上游后下游","BCD",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":154,"analysis":37},1151327,"（2013年）下列关于水闸混凝土工程施工原则的说法，正确的有（ ）。",[146,148,150,151,152],{"key":20,"text":147,"correct":22},"先深后浅",{"key":24,"text":149,"correct":29},"先轻后重",{"key":27,"text":136,"correct":22},{"key":31,"text":138,"correct":22},{"key":34,"text":153,"correct":29},"先大后小","ACD",{"id":156,"libraryId":5,"type":15,"typeLabel":16,"stem":157,"options":158,"answer":154,"analysis":37},1151328,"（2013年）关于水闸混凝土工程施工原则的说法中，正确的是（）。",[159,160,161,162,163],{"key":20,"text":147,"correct":22},{"key":24,"text":149,"correct":29},{"key":27,"text":136,"correct":22},{"key":31,"text":138,"correct":22},{"key":34,"text":153,"correct":29},{"id":165,"libraryId":5,"type":15,"typeLabel":16,"stem":166,"options":167,"answer":178,"analysis":37},1151329,"（2014年）水电站平水建筑物包括（ ）。",[168,170,172,174,176],{"key":20,"text":169,"correct":29},"溢洪道",{"key":24,"text":171,"correct":29},"泄洪隧洞",{"key":27,"text":173,"correct":22},"调压室",{"key":31,"text":175,"correct":29},"放水底孔",{"key":34,"text":177,"correct":22},"压力前池","CE",{"id":180,"libraryId":5,"type":15,"typeLabel":16,"stem":181,"options":182,"answer":193,"analysis":37},1151330,"（2007年）冲击式水轮机按射流冲击转轮的方式不同分为（ ）。",[183,185,187,189,191],{"key":20,"text":184,"correct":29},"混流式",{"key":24,"text":186,"correct":22},"水斗式",{"key":27,"text":188,"correct":29},"斜流式",{"key":31,"text":190,"correct":22},"斜击式",{"key":34,"text":192,"correct":22},"双击式","BDE",{"id":195,"libraryId":5,"type":15,"typeLabel":16,"stem":196,"options":197,"answer":208,"analysis":37},1151331,"（2014年）下列关于爆破作业的说法，正确的有（ ）。",[198,200,202,204,206],{"key":20,"text":199,"correct":29},"装药和堵塞可使用木、竹、铝制作的炮棍",{"key":24,"text":201,"correct":29},"点燃导火索可使用香烟",{"key":27,"text":203,"correct":22},"雷雨天严禁使用电爆网路",{"key":31,"text":205,"correct":22},"导爆索可用快刀切割",{"key":34,"text":207,"correct":22},"禁止导爆管打结","CDE",{"id":210,"libraryId":5,"type":15,"typeLabel":16,"stem":211,"options":212,"answer":223,"analysis":37},1151332,"(2011年)关于爆破作业的说法，正确的有（）。",[213,215,217,219,221],{"key":20,"text":214,"correct":22},"装药、堵塞严禁使用金属棍棒",{"key":24,"text":216,"correct":22},"可使用香点燃导火索",{"key":27,"text":218,"correct":22},"电力起爆网路中导线应绝缘",{"key":31,"text":220,"correct":29},"导爆索宜使用锋利的剪刀切断",{"key":34,"text":222,"correct":29},"连接导爆索中间允许出现打结现象","ABC",{"id":225,"libraryId":5,"type":15,"typeLabel":16,"stem":226,"options":227,"answer":96,"analysis":37},1151333,"（2018年真题）关于施工现场临时10kV变压器安装的说法中，正确的是（）。",[228,230,232,234,236],{"key":20,"text":229,"correct":22},"变压器装于地面时，应再0.5m的高台",{"key":24,"text":231,"correct":29},"装于地面的变压器周围应装设栅栏",{"key":27,"text":233,"correct":29},"杆上变压器安装的高度应不低于1.0m",{"key":31,"text":235,"correct":22},"杆上变压器应挂有“止步，高压危险”的警示标志",{"key":34,"text":237,"correct":22},"变压器的引线应采用绝缘导线",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":252,"analysis":37},1151334,"（2016年）下列水利工程建设程序中，立项过程包括（ ）阶段。",[242,244,246,248,250],{"key":20,"text":243,"correct":29},"项目规划",{"key":24,"text":245,"correct":22},"项目建议书",{"key":27,"text":247,"correct":22},"可行性研究报告",{"key":31,"text":249,"correct":29},"初步设计",{"key":34,"text":251,"correct":29},"招标设计","BC",{"id":254,"libraryId":5,"type":15,"typeLabel":16,"stem":255,"options":256,"answer":267,"analysis":37},1151335,"（2017年）根据《水利建设项目后评价管理办法（试行）》（水规计（2010）51号），项目后评价中的过程评价包括（）等内容。",[257,259,261,263,265],{"key":20,"text":258,"correct":29},"社会影响评价",{"key":24,"text":260,"correct":29},"环境影响评价",{"key":27,"text":262,"correct":29},"财务评价",{"key":31,"text":264,"correct":22},"运行管理评价",{"key":34,"text":266,"correct":22},"建设实施评价","DE",{"id":269,"libraryId":5,"type":15,"typeLabel":16,"stem":270,"options":271,"answer":126,"analysis":37},1151336,"（2016年）根据《关于鼓励和引导社会资本参与重大水利工程建设运营的实施意见》（发改农经[2015]488号），重大水利工程建设投入中的政府投资和社会资本，原则上按（ ）进行合理分摊和筹措。",[272,274,276,278,280],{"key":20,"text":273,"correct":29},"运营费用",{"key":24,"text":275,"correct":22},"功能",{"key":27,"text":277,"correct":29},"建设成本",{"key":31,"text":279,"correct":22},"效益",{"key":34,"text":281,"correct":29},"政府财政承受能力",{"id":283,"libraryId":5,"type":15,"typeLabel":16,"stem":284,"options":285,"answer":52,"analysis":37},1151337,"（2016年）根据《水利基本建设项目稽察暂行办法》（水利部令第11号）建设项目的稽察内容包括（ ）等。",[286,288,290,292,294],{"key":20,"text":287,"correct":22},"项目设计工作",{"key":24,"text":289,"correct":22},"项目建设管理",{"key":27,"text":291,"correct":22},"项目工程质量",{"key":31,"text":293,"correct":22},"项目资金使用",{"key":34,"text":295,"correct":29},"项目运行管理",{"id":297,"libraryId":5,"type":15,"typeLabel":16,"stem":298,"options":299,"answer":223,"analysis":37},1151338,"（2012年）根据《水利工程建设项目管理规定》（水建[1995]128号），在水利工程建设程序中，属于前期工作的有（ ）。",[300,302,303,304,305],{"key":20,"text":301,"correct":22},"项目建设书",{"key":24,"text":247,"correct":22},{"key":27,"text":249,"correct":22},{"key":31,"text":251,"correct":29},{"key":34,"text":306,"correct":29},"生产准备",{"id":308,"libraryId":5,"type":15,"typeLabel":16,"stem":309,"options":310,"answer":52,"analysis":37},1151339,"（2014年）根据《水利工程建设项目勘察（测）设计招标投标管理办法》（水总〔2004〕511号），经批准后，水利工程建设项目勘察（测）设计可不招标的情况包括（ ）。",[311,313,315,317,319],{"key":20,"text":312,"correct":22},"工程项目涉及国家安全的",{"key":24,"text":314,"correct":22},"抢险救灾的",{"key":27,"text":316,"correct":22},"主要工艺采用专有技术的",{"key":31,"text":318,"correct":22},"技术复杂，能够满足条件的勘察设计单位少于三家的",{"key":34,"text":320,"correct":29},"专业性较强，符合条件的潜在投标人数量有限的",{"id":322,"libraryId":5,"type":15,"typeLabel":16,"stem":323,"options":324,"answer":223,"analysis":37},1151340,"（2017年）根据《水利工程建设项目管理暂行规定》（水建（1995)28号)，水利工程项目建设实行（ )等制度。",[325,327,329,331,333],{"key":20,"text":326,"correct":22},"项目法人责任制",{"key":24,"text":328,"correct":22},"招标投标制",{"key":27,"text":330,"correct":22},"建设监理制",{"key":31,"text":332,"correct":29},"代建制",{"key":34,"text":334,"correct":29},"PPP制",{"id":336,"libraryId":5,"type":15,"typeLabel":16,"stem":337,"options":338,"answer":141,"analysis":37},1151341,"（2010年）水利工程建设项目审计按建设过程分为（）审计。",[339,341,343,345,347],{"key":20,"text":340,"correct":29},"前期工作",{"key":24,"text":342,"correct":22},"开工",{"key":27,"text":344,"correct":22},"建设期间",{"key":31,"text":346,"correct":22},"竣工决算",{"key":34,"text":348,"correct":29},"竣工后",{"id":350,"libraryId":5,"type":15,"typeLabel":16,"stem":351,"options":352,"answer":208,"analysis":37},1151342,"（2014年）水利工程基本建设项目竣工决算审计的目的是监督和评价其竣工决算的（）。",[353,355,357,359,361],{"key":20,"text":354,"correct":29},"安全性",{"key":24,"text":356,"correct":29},"可靠性",{"key":27,"text":358,"correct":22},"真实性",{"key":31,"text":360,"correct":22},"合法性",{"key":34,"text":362,"correct":22},"效益性",{"id":364,"libraryId":5,"type":15,"typeLabel":16,"stem":365,"options":366,"answer":374,"analysis":37},1151343,"（2016年）水利工程建设程序中，立项过程包括（）。",[367,368,369,370,372],{"key":20,"text":245,"correct":22},{"key":24,"text":247,"correct":22},{"key":27,"text":249,"correct":29},{"key":31,"text":371,"correct":29},"施工准备",{"key":34,"text":373,"correct":29},"施工招标","AB",{"id":376,"libraryId":5,"type":15,"typeLabel":16,"stem":377,"options":378,"answer":208,"analysis":37},1151344,"（2018年真题）根据《水利工程设计变更管理暂行办法》（水规计[2012]93号）下列设计变更中属于一般设计变更的是（）。",[379,381,383,385,387],{"key":20,"text":380,"correct":29},"河道治理范围变化",{"key":24,"text":382,"correct":29},"除险加固工程主要技术方案变化",{"key":27,"text":384,"correct":22},"小型泵站装机容量变化",{"key":31,"text":386,"correct":22},"堤防线路局部变化",{"key":34,"text":388,"correct":22},"金属结构附属设备变化",{"id":390,"libraryId":5,"type":15,"typeLabel":16,"stem":391,"options":392,"answer":52,"analysis":37},1151345,"（2019年真题）水利PPP项目实施程序主要包括()。",[393,395,397,399,401],{"key":20,"text":394,"correct":22},"项目储备",{"key":24,"text":396,"correct":22},"项目论证",{"key":27,"text":398,"correct":22},"社会资本方选择",{"key":31,"text":400,"correct":22},"项目执行",{"key":34,"text":402,"correct":29},"设备采购",{"id":404,"libraryId":5,"type":15,"typeLabel":16,"stem":405,"options":406,"answer":417,"analysis":37},1151346,"（2015年）水利工程项目施工管理机构中，必须是承包人本单位的人员有（）等。",[407,409,411,413,415],{"key":20,"text":408,"correct":22},"财务负责人员",{"key":24,"text":410,"correct":29},"进度管理人员",{"key":27,"text":412,"correct":22},"质量管理人员",{"key":31,"text":414,"correct":29},"资料管理人员",{"key":34,"text":416,"correct":22},"安全管理人员","ACE",{"id":419,"libraryId":5,"type":15,"typeLabel":16,"stem":420,"options":421,"answer":267,"analysis":37},1151347,"（2018年真题）根据《水利基本建设项目竣工决算审计规程》（SL557-2012）,审计终结阶段要进行的工作包括（）。",[422,424,426,428,430],{"key":20,"text":423,"correct":29},"下达审计结论",{"key":24,"text":425,"correct":29},"征求意见",{"key":27,"text":427,"correct":29},"出具审计报告",{"key":31,"text":429,"correct":22},"整改落实",{"key":34,"text":431,"correct":22},"后续审计",{"id":433,"libraryId":5,"type":15,"typeLabel":16,"stem":434,"options":435,"answer":374,"analysis":37},1151348,"（2019年真题）根据《水利建设工程施工分包管理规定》，水利工程施工分包按分包的性质分为()。",[436,438,440,442,444],{"key":20,"text":437,"correct":22},"工程分包",{"key":24,"text":439,"correct":22},"劳务作业分包",{"key":27,"text":441,"correct":29},"设备分包",{"key":31,"text":443,"correct":29},"材料分包",{"key":34,"text":445,"correct":29},"质量检验分包",{"id":447,"libraryId":5,"type":15,"typeLabel":16,"stem":448,"options":449,"answer":460,"analysis":37},1151349,"（2018年真题）根据《国务院关于在市场体系建设监理公平竞争审查制度的意见》，下列行为属于排斥外地经营者参加本地投标活动的有（）。",[450,452,454,456,458],{"key":20,"text":451,"correct":29},"限定个人只能购买本地企业的服务",{"key":24,"text":453,"correct":29},"在边界设置关卡，阻碍本地产品运出",{"key":27,"text":455,"correct":22},"不依法及时发布招标信息",{"key":31,"text":457,"correct":22},"直接拒绝外地经营者参加本地投标",{"key":34,"text":459,"correct":29},"限制外地经营者在本地设立分支机构","CD",{"id":462,"libraryId":5,"type":15,"typeLabel":16,"stem":463,"options":464,"answer":111,"analysis":37},1151350,"（2017年）根据《关于清理规工程建设领域保障金的通知》（国办发[2016]49号)，建筑业企业在工程建设中需缴纳的保证金有（ )。",[465,467,469,471,473],{"key":20,"text":466,"correct":22},"投标保证金",{"key":24,"text":468,"correct":22},"履约保证金",{"key":27,"text":470,"correct":22},"工程质量保证金",{"key":31,"text":472,"correct":29},"信用保证金",{"key":34,"text":474,"correct":22},"农民工工资保证金",{"id":476,"libraryId":5,"type":15,"typeLabel":16,"stem":477,"options":478,"answer":223,"analysis":37},1151351,"（2016年）根据《贯彻质量发展纲要提升水利工程质量的实施意见》（水建管[2012]581号），到2020年，水利工程质量发展的具体目标包括（ ）。",[479,481,483,485,487],{"key":20,"text":480,"correct":22},"水利工程质量水平全面提升",{"key":24,"text":482,"correct":22},"人民群众对水利工程质量满意度显著提高",{"key":27,"text":484,"correct":22},"国家重点水利工程质量达到国际先进水平",{"key":31,"text":486,"correct":29},"大中型水利工程项目一次性验收合格率达到98%以上",{"key":34,"text":488,"correct":29},"小型水利工程项目一次验收合格率达到100%",{"id":490,"libraryId":5,"type":15,"typeLabel":16,"stem":491,"options":492,"answer":81,"analysis":37},1151352,"（2015年）根据水利部对水利工程质量管理体制建设的总体要求，水利工程质量工作格局包括（）等。",[493,495,497,499,501],{"key":20,"text":494,"correct":22},"政府监管",{"key":24,"text":496,"correct":29},"项目法人负责",{"key":27,"text":498,"correct":22},"企业主体",{"key":31,"text":500,"correct":22},"市场调节",{"key":34,"text":502,"correct":22},"行业自律",{"id":504,"libraryId":5,"type":15,"typeLabel":16,"stem":505,"options":506,"answer":154,"analysis":37},1151353,"（2014年）根据《水利工程质量监督规定》（水建[1997]339号），按照分级管理的原则，水利工程质量监督机构设置为（）。",[507,509,511,513,515],{"key":20,"text":508,"correct":22},"总站",{"key":24,"text":510,"correct":29},"流域站",{"key":27,"text":512,"correct":22},"中心站",{"key":31,"text":514,"correct":22},"站",{"key":34,"text":516,"correct":29},"项目站",{"id":518,"libraryId":5,"type":15,"typeLabel":16,"stem":519,"options":520,"answer":52,"analysis":37},1151354,"（2019年真题）根据《水利工程质量事故处理暂行规定》，质量事故分为()。",[521,523,525,527,529],{"key":20,"text":522,"correct":22},"特大质量事故",{"key":24,"text":524,"correct":22},"较大质量事故",{"key":27,"text":526,"correct":22},"重大质量事故",{"key":31,"text":528,"correct":22},"一般质量事故",{"key":34,"text":530,"correct":29},"常规质量事故",{"id":532,"libraryId":5,"type":15,"typeLabel":16,"stem":533,"options":534,"answer":154,"analysis":37},1151355,"（2014年）根据《水利工程质量监督规定》（水建〔1997〕339号），按照分级管理的原则，水利工程质量监督机构设置为（ ）。",[535,536,537,538,539],{"key":20,"text":508,"correct":22},{"key":24,"text":510,"correct":29},{"key":27,"text":512,"correct":22},{"key":31,"text":514,"correct":22},{"key":34,"text":516,"correct":29},{"id":541,"libraryId":5,"type":15,"typeLabel":16,"stem":542,"options":543,"answer":554,"analysis":37},1151356,"（2015年）根据《水利水电工程施工企业主要负责人、项目负责人和专职安全生产管理人员安全生产考核管理办法》（水安监〔2011〕374号），“三类人员”安全生产知识考核主要测试申请人对（ ）等知识的掌握情况。",[544,546,548,550,552],{"key":20,"text":545,"correct":29},"文化",{"key":24,"text":547,"correct":22},"法律法规",{"key":27,"text":549,"correct":22},"安全生产管理",{"key":31,"text":551,"correct":29},"施工技术",{"key":34,"text":553,"correct":22},"安全生产技术","BCE",{"id":556,"libraryId":5,"type":15,"typeLabel":16,"stem":557,"options":558,"answer":66,"analysis":37},1151357,"（2018年真题）根据《大中型水电工程建设风险管理规范》（GB\u002FT50297-2013），水利水电工程建设风险类型包括（）。",[559,561,563,565,567],{"key":20,"text":560,"correct":29},"质量事故风险",{"key":24,"text":562,"correct":22},"工期延误风险",{"key":27,"text":564,"correct":22},"人员伤亡风险",{"key":31,"text":566,"correct":22},"经济损失风险",{"key":34,"text":568,"correct":22},"社会影响风险",{"id":570,"libraryId":5,"type":15,"typeLabel":16,"stem":571,"options":572,"answer":583,"analysis":37},1151358,"（2018年真题）根据《节水供水重大水利工程建设质量监督巡查实施细则》对勘察设计单位巡查的内容包括（）。",[573,575,577,579,581],{"key":20,"text":574,"correct":22},"现场服务情况",{"key":24,"text":576,"correct":29},"现场质量控制情况",{"key":27,"text":578,"correct":29},"施工资料完整情况",{"key":31,"text":580,"correct":29},"工程实体质量情况",{"key":34,"text":582,"correct":22},"设计变更是否符合规定","AE",{"id":585,"libraryId":5,"type":15,"typeLabel":16,"stem":586,"options":587,"answer":223,"analysis":37},1151359,"（2019年真题）根据《水电建设工程质量管理暂行办法》，按对工程的()的影响程度，检查、处理事故对工期的影响时间长短和直接经济损失的大小，划分工程质量事故。",[588,590,591,593,595],{"key":20,"text":589,"correct":22},"耐久性",{"key":24,"text":356,"correct":22},{"key":27,"text":592,"correct":22},"正常使用",{"key":31,"text":594,"correct":29},"外观",{"key":34,"text":596,"correct":29},"工程效益",{"id":598,"libraryId":5,"type":15,"typeLabel":16,"stem":599,"options":600,"answer":141,"analysis":37},1151360,"（2013年）水利工程法人验收包括（ ）。",[601,603,605,607,609],{"key":20,"text":602,"correct":29},"单元工程验收",{"key":24,"text":604,"correct":22},"分部工程验收",{"key":27,"text":606,"correct":22},"单位工程验收",{"key":31,"text":608,"correct":22},"合同工程完工验收",{"key":34,"text":610,"correct":29},"竣工验收",{"id":612,"libraryId":5,"type":15,"typeLabel":16,"stem":613,"options":614,"answer":208,"analysis":37},1151361,"（2019年真题）水利工程档案的保管期限分为()。",[615,617,619,621,623],{"key":20,"text":616,"correct":29},"3年",{"key":24,"text":618,"correct":29},"10年",{"key":27,"text":620,"correct":22},"长期",{"key":31,"text":622,"correct":22},"永久",{"key":34,"text":624,"correct":22},"短期",{"id":626,"libraryId":5,"type":15,"typeLabel":16,"stem":627,"options":628,"answer":96,"analysis":37},1151362,"（2015年）根据《水电工程验收管理办法》（国能新能〔2011〕263号），下列验收由省级人民政府能源主管部门负责的有（ ）。",[629,631,633,635,637],{"key":20,"text":630,"correct":22},"工程蓄水验收",{"key":24,"text":632,"correct":29},"工程截流验收",{"key":27,"text":634,"correct":29},"水轮发电机组启动验收",{"key":31,"text":636,"correct":22},"枢纽工程专项验收",{"key":34,"text":610,"correct":22},{"id":639,"libraryId":5,"type":15,"typeLabel":16,"stem":640,"options":641,"answer":36,"analysis":37},1151363,"（2016年）根据《水利工程施工监理规范》（SL288-2014），水利工程施工实施阶段监理工作的内容中，开工条件的控制涉及（ ）。",[642,644,646,648,650],{"key":20,"text":643,"correct":22},"签发开工通知",{"key":24,"text":645,"correct":22},"分部工程开工",{"key":27,"text":647,"correct":29},"分项工程开工",{"key":31,"text":649,"correct":22},"单元工程开工",{"key":34,"text":651,"correct":22},"混凝土浇筑开仓",{"id":653,"libraryId":5,"type":15,"typeLabel":16,"stem":654,"options":655,"answer":66,"analysis":37},1151364,"（2013年）根据《水电水利工程施工监理规范》（DL\u002FT5111-2000），水电工程项目划分为（）工程。",[656,658,660,662,664],{"key":20,"text":657,"correct":29},"主体",{"key":24,"text":659,"correct":22},"单位",{"key":27,"text":661,"correct":22},"分部",{"key":31,"text":663,"correct":22},"分项",{"key":34,"text":665,"correct":22},"单元",{"id":667,"libraryId":5,"type":15,"typeLabel":16,"stem":668,"options":669,"answer":52,"analysis":37},1151365,"（2014年）根据《水电水利工程施工监理规范》（DL\u002FT5111—2000），水力发电工程的工程变更分为（）。",[670,672,674,676,678],{"key":20,"text":671,"correct":22},"常规设计变更",{"key":24,"text":673,"correct":22},"一般工程变更",{"key":27,"text":675,"correct":22},"较大工程变更",{"key":31,"text":677,"correct":22},"重大工程变更",{"key":34,"text":679,"correct":29},"特别重大工程变更",{"id":681,"libraryId":5,"type":15,"typeLabel":16,"stem":682,"options":683,"answer":36,"analysis":37},1151366,"（2017年）根据《关于全面推行河长制的意见》，各级河长的职责主要有（ )。",[684,686,688,690,692],{"key":20,"text":685,"correct":22},"水资源保护",{"key":24,"text":687,"correct":22},"水域岸线管理",{"key":27,"text":689,"correct":29},"编制防洪规划",{"key":31,"text":691,"correct":22},"水环境治理",{"key":34,"text":693,"correct":22},"水污染防治",{"id":695,"libraryId":5,"type":15,"typeLabel":16,"stem":696,"options":697,"answer":223,"analysis":37},1151367,"（2010年）根据《大中型水利水电工程建设征地补偿和移民安置条例》，移民安置工作的管理体制包括（）。",[698,700,702,704,706],{"key":20,"text":699,"correct":22},"政府领导",{"key":24,"text":701,"correct":22},"分级负责",{"key":27,"text":703,"correct":22},"县为基础",{"key":31,"text":705,"correct":29},"项目法人实施",{"key":34,"text":707,"correct":29},"施工单位参与",{"id":709,"libraryId":5,"type":15,"typeLabel":16,"stem":710,"options":711,"answer":722,"analysis":37},1151368,"（2011年）根据《水法》，1级堤防工程的护堤地属于（）。",[712,714,716,718,720],{"key":20,"text":713,"correct":22},"工程管理范围",{"key":24,"text":715,"correct":29},"工程保护范围",{"key":27,"text":717,"correct":22},"堤防设施组成部分",{"key":31,"text":719,"correct":29},"限制生产建设活动范围",{"key":34,"text":721,"correct":29},"可耕地范围","AC",[724,728,731,734,737,740],{"id":725,"name":726,"category":7,"favorite":727},1,"领导干部任职前廉政法规知识测试题",92,{"id":729,"name":730,"category":7,"favorite":725},595,"建筑结构与设备",{"id":732,"name":733,"category":7,"favorite":725},715,"招标采购专业知识与法律法规",{"id":735,"name":736,"category":7,"favorite":725},848,"市政方向-通用基础",{"id":738,"name":739,"category":7,"favorite":8},534,"BIM工程师",{"id":741,"name":739,"category":7,"favorite":8},535]