[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-803-24":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":597},{"id":5,"name":6,"category":7,"favorite":8},803,"一建水利水电工程实务","建筑工程",0,24,50,1981,[13,34,43,55,67,79,91,103,114,126,138,150,162,174,186,198,207,219,231,243,255,267,279,291,303,312,324,335,344,356,368,380,391,399,411,422,434,444,455,467,479,491,503,515,527,539,551,563,573,585],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},1151166,1,"单选题","根据《水电工程设计概算编制规定》（2013年版），施工管理费属于（ ）。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","基本直接费",false,{"key":24,"text":25,"correct":22},"B","其他直接费",{"key":27,"text":28,"correct":29},"C","间接费",true,{"key":31,"text":32,"correct":22},"D","现场经费","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},1151167,"根据《水电工程设计概算编制规定》（2013年版），材料费属于（ ）。",[38,39,40,42],{"key":20,"text":21,"correct":29},{"key":24,"text":25,"correct":22},{"key":27,"text":41,"correct":22},"直接工程费",{"key":31,"text":32,"correct":22},{"id":44,"libraryId":5,"type":15,"typeLabel":16,"stem":45,"options":46,"answer":20,"analysis":33},1151168,"水电工程设计概算项目划分为枢纽工程、建设征地和移民安置、（ ）三部分。",[47,49,51,53],{"key":20,"text":48,"correct":29},"独立费用",{"key":24,"text":50,"correct":22},"基本预备费",{"key":27,"text":52,"correct":22},"建设期贷款利息",{"key":31,"text":54,"correct":22},"项目建设管理费",{"id":56,"libraryId":5,"type":15,"typeLabel":16,"stem":57,"options":58,"answer":27,"analysis":33},1151169,"根据《水利建筑工程预算定额》，混凝土拌制定额均以（ ）计算。",[59,61,63,65],{"key":20,"text":60,"correct":22},"混凝土中间量",{"key":24,"text":62,"correct":22},"混凝土最终量",{"key":27,"text":64,"correct":29},"混凝土半成品量",{"key":31,"text":66,"correct":22},"混凝土成品量",{"id":68,"libraryId":5,"type":15,"typeLabel":16,"stem":69,"options":70,"answer":31,"analysis":33},1151170,"根据《水利建筑工程预算定额》，计算每100压实成品方需要的自然方量需要的数据不包括（ ）。",[71,73,75,77],{"key":20,"text":72,"correct":22},"天然干密度",{"key":24,"text":74,"correct":22},"设计干密度",{"key":27,"text":76,"correct":22},"土料损耗综合系数",{"key":31,"text":78,"correct":29},"压实遍数",{"id":80,"libraryId":5,"type":15,"typeLabel":16,"stem":81,"options":82,"answer":27,"analysis":33},1151171,"根据《水利建筑工程预算定额》，挖掘机挖土自卸汽车运输章节适用于（ ）类土。",[83,85,87,89],{"key":20,"text":84,"correct":22},"Ⅰ",{"key":24,"text":86,"correct":22},"Ⅱ",{"key":27,"text":88,"correct":29},"Ⅲ",{"key":31,"text":90,"correct":22},"Ⅳ",{"id":92,"libraryId":5,"type":15,"typeLabel":16,"stem":93,"options":94,"answer":24,"analysis":33},1151172,"根据《水利建筑工程预算定额》，推土机推松土时定额调整系数为（ ）。",[95,97,99,101],{"key":20,"text":96,"correct":22},"0.7",{"key":24,"text":98,"correct":29},"0.8",{"key":27,"text":100,"correct":22},"0.9",{"key":31,"text":102,"correct":22},"0.6",{"id":104,"libraryId":5,"type":15,"typeLabel":16,"stem":105,"options":106,"answer":24,"analysis":33},1151173,"根据《水利建筑工程预算定额》，汽车运输定额，运距超过10km，超过部分按增运1km的台时数乘以（ ）系数计算。",[107,109,111,113],{"key":20,"text":108,"correct":22},"0.70",{"key":24,"text":110,"correct":29},"0.75",{"key":27,"text":112,"correct":22},"0.85",{"key":31,"text":100,"correct":22},{"id":115,"libraryId":5,"type":15,"typeLabel":16,"stem":116,"options":117,"answer":27,"analysis":33},1151174,"如采用概算定额编制投资估算时，应乘以（ ）的投资估算调整系数。",[118,120,122,124],{"key":20,"text":119,"correct":22},"1.03",{"key":24,"text":121,"correct":22},"1.05",{"key":27,"text":123,"correct":29},"1.10",{"key":31,"text":125,"correct":22},"1.15",{"id":127,"libraryId":5,"type":15,"typeLabel":16,"stem":128,"options":129,"answer":31,"analysis":33},1151175,"直接用于施工生产的人工、材料、成品、半成品、机械消耗定额是（ ）。",[130,132,134,136],{"key":20,"text":131,"correct":22},"劳动定额",{"key":24,"text":133,"correct":22},"预算定额",{"key":27,"text":135,"correct":22},"施工定额",{"key":31,"text":137,"correct":29},"直接费定额",{"id":139,"libraryId":5,"type":15,"typeLabel":16,"stem":140,"options":141,"answer":27,"analysis":33},1151176,"监理机构对承包人检验结果的平行检测的检测数量，混凝土试样不应少于承包人检测数量的（ ），重要部位每种强度等级的混凝土最少取样（ ）组。",[142,144,146,148],{"key":20,"text":143,"correct":22},"1%、1",{"key":24,"text":145,"correct":22},"1%、2",{"key":27,"text":147,"correct":29},"3%、1",{"key":31,"text":149,"correct":22},"3%、2",{"id":151,"libraryId":5,"type":15,"typeLabel":16,"stem":152,"options":153,"answer":27,"analysis":33},1151177,"监理机构对承包人检验结果的跟踪检测的检测数量，土方试样不应少于承包人检测数量的（ ）。",[154,156,158,160],{"key":20,"text":155,"correct":22},"6%",{"key":24,"text":157,"correct":22},"8%",{"key":27,"text":159,"correct":29},"10%",{"key":31,"text":161,"correct":22},"12%",{"id":163,"libraryId":5,"type":15,"typeLabel":16,"stem":164,"options":165,"answer":27,"analysis":33},1151178,"签发进场通知、审批开工申请是施工监理（ ）阶段的工作内容。",[166,168,170,172],{"key":20,"text":167,"correct":22},"施工准备",{"key":24,"text":169,"correct":22},"施工计划",{"key":27,"text":171,"correct":29},"施工实施",{"key":31,"text":173,"correct":22},"项目审批",{"id":175,"libraryId":5,"type":15,"typeLabel":16,"stem":176,"options":177,"answer":24,"analysis":33},1151179,"水利工程施工中，后续单元工程凭（ ）方可开工。",[178,180,182,184],{"key":20,"text":179,"correct":22},"分部工程开工申请获批",{"key":24,"text":181,"correct":29},"监理机构签发的上一单元工程施工质量合格证明",{"key":27,"text":183,"correct":22},"上一单元工程自检合格证明",{"key":31,"text":185,"correct":22},"质量监督部门签发的上一单元工程施工质量合格证明",{"id":187,"libraryId":5,"type":15,"typeLabel":16,"stem":188,"options":189,"answer":27,"analysis":33},1151180,"监理单位与承建单位的关系是（ ）。",[190,192,194,196],{"key":20,"text":191,"correct":22},"合同委托与被委托的关系",{"key":24,"text":193,"correct":22},"协作、配合的关系",{"key":27,"text":195,"correct":29},"监理与被监理的关系",{"key":31,"text":197,"correct":22},"委托与被委托的关系",{"id":199,"libraryId":5,"type":15,"typeLabel":16,"stem":200,"options":201,"answer":20,"analysis":33},1151181,"检查由发包人提供的道路、供电、供水、通信等条件的完成情况是施工监理（ ）阶段的工作内容。",[202,203,204,205],{"key":20,"text":167,"correct":29},{"key":24,"text":169,"correct":22},{"key":27,"text":171,"correct":22},{"key":31,"text":206,"correct":22},"质量控制",{"id":208,"libraryId":5,"type":15,"typeLabel":16,"stem":209,"options":210,"answer":20,"analysis":33},1151182,"水利工程建设项目施工监理施工准备阶段监理工作的基本内容是（ ）。",[211,213,215,217],{"key":20,"text":212,"correct":29},"检查开工前由发包人准备的施工条件和承包人的施工准备情况",{"key":24,"text":214,"correct":22},"复核发包人提供的测量基准点，签发进场通知、审批开工申请",{"key":27,"text":216,"correct":22},"协助发包人编制年、月的合同付款计划，审批承包人提交的资金流计划",{"key":31,"text":218,"correct":22},"协助发包人编制控制性总进度计划，审批承包人提交的施工进度计划",{"id":220,"libraryId":5,"type":15,"typeLabel":16,"stem":221,"options":222,"answer":24,"analysis":33},1151183,"监理人员分类不包括（ ）。",[223,225,227,229],{"key":20,"text":224,"correct":22},"总监理工裎师",{"key":24,"text":226,"correct":29},"副总监理工程师",{"key":27,"text":228,"correct":22},"监理工程师",{"key":31,"text":230,"correct":22},"监理员",{"id":232,"libraryId":5,"type":15,"typeLabel":16,"stem":233,"options":234,"answer":24,"analysis":33},1151184,"淤地坝建设监理应当由同时具备（ ）专业资质的监理单位承担。",[235,237,239,241],{"key":20,"text":236,"correct":22},"水利工程施工监理和工程移民监理",{"key":24,"text":238,"correct":29},"水利工程施工监理和乙级以上水土保持工程施工监理",{"key":27,"text":240,"correct":22},"水利工程施工监理和建设环境保护监理",{"key":31,"text":242,"correct":22},"工程移民监理和建设环境保护监理",{"id":244,"libraryId":5,"type":15,"typeLabel":16,"stem":245,"options":246,"answer":27,"analysis":33},1151185,"根据《水利部关于修改＜水利工程建设监理单位资质管理办法＞的决定》（水利部令第40号），水利工程建设监理单位资质分为（ ）个专业。",[247,249,251,253],{"key":20,"text":248,"correct":22},"2",{"key":24,"text":250,"correct":22},"3",{"key":27,"text":252,"correct":29},"4",{"key":31,"text":254,"correct":22},"5",{"id":256,"libraryId":5,"type":15,"typeLabel":16,"stem":257,"options":258,"answer":20,"analysis":33},1151186,"两个以上具备承担招标项目相应能力的监理单位可以组成一个联合体承接工程建设监理业务，那么联合体的资质等级应以（ ）确定。",[259,261,263,265],{"key":20,"text":260,"correct":29},"资质等级较低的监理单位",{"key":24,"text":262,"correct":22},"资质等级较高的监理单位",{"key":27,"text":264,"correct":22},"与监理业务关系较大的监理单位",{"key":31,"text":266,"correct":22},"资质等级较低的监理单位提高一级",{"id":268,"libraryId":5,"type":15,"typeLabel":16,"stem":269,"options":270,"answer":24,"analysis":33},1151187,"监理机构在承包人自行检测的同时独立进行检测，以核验承包人的检测结果的工作方法是（ ）。",[271,273,275,277],{"key":20,"text":272,"correct":22},"跟踪检测",{"key":24,"text":274,"correct":29},"平行检测",{"key":27,"text":276,"correct":22},"巡视检验",{"key":31,"text":278,"correct":22},"旁站监理",{"id":280,"libraryId":5,"type":15,"typeLabel":16,"stem":281,"options":282,"answer":27,"analysis":33},1151188,"下列关于水利工程建设项目工程质量检验制度的说法，错误的是（ ）。",[283,285,287,289],{"key":20,"text":284,"correct":22},"承包人完成一道工序且自检合格后方可报监理单位复核检验",{"key":24,"text":286,"correct":22},"承包人完成一个单元工程且自检合格后方可报监理单位复核检验",{"key":27,"text":288,"correct":29},"上一单元工程自检合格后，可以进行下一个单元工程施工",{"key":31,"text":290,"correct":22},"复核不合格的单元工程不可以进行下一单元工程的施工",{"id":292,"libraryId":5,"type":15,"typeLabel":16,"stem":293,"options":294,"answer":31,"analysis":33},1151190,"在业主和工程承建合同文件授权的范围内，对工程分包进行审查的单位是（ ）。",[295,297,299,301],{"key":20,"text":296,"correct":22},"承建单位的主管部门",{"key":24,"text":298,"correct":22},"建设单位",{"key":27,"text":300,"correct":22},"质量监督机构",{"key":31,"text":302,"correct":29},"监理机构",{"id":304,"libraryId":5,"type":15,"typeLabel":16,"stem":305,"options":306,"answer":31,"analysis":33},1151191,"分包项目的施工措施计划必须报（ ）。",[307,309,310,311],{"key":20,"text":308,"correct":22},"总承包单位",{"key":24,"text":298,"correct":22},{"key":27,"text":300,"correct":22},{"key":31,"text":302,"correct":29},{"id":313,"libraryId":5,"type":15,"typeLabel":16,"stem":314,"options":315,"answer":31,"analysis":33},1151192,"在水力发电工程中，下列关于工程变更、合同索赔的说法错误的是（ ）。",[316,318,320,322],{"key":20,"text":317,"correct":22},"工程变更指令由业主或业主授权监理发出",{"key":24,"text":319,"correct":22},"监理机构可以拒绝或同意合同索赔的全部或部分要求",{"key":27,"text":321,"correct":22},"设计单位可以提出要求或建议",{"key":31,"text":323,"correct":29},"索赔争议仲裁、调解过程中，合同双方应停止工程承建合同文件规定的义务和责任",{"id":325,"libraryId":5,"type":15,"typeLabel":16,"stem":326,"options":327,"answer":31,"analysis":33},1151193,"施工进度计划的编制单位是（ ）。",[328,329,331,333],{"key":20,"text":298,"correct":22},{"key":24,"text":330,"correct":22},"设计单位",{"key":27,"text":332,"correct":22},"监理单位",{"key":31,"text":334,"correct":29},"承建单位",{"id":336,"libraryId":5,"type":15,"typeLabel":16,"stem":337,"options":338,"answer":20,"analysis":33},1151194,"工程变更指令一般由（ ）审查、批准后发出。",[339,341,342,343],{"key":20,"text":340,"correct":29},"业主或业主授权监理机构",{"key":24,"text":330,"correct":22},{"key":27,"text":300,"correct":22},{"key":31,"text":334,"correct":22},{"id":345,"libraryId":5,"type":15,"typeLabel":16,"stem":346,"options":347,"answer":20,"analysis":33},1151195,"工程价款支付一般按（ ）进行。",[348,350,352,354],{"key":20,"text":349,"correct":29},"月",{"key":24,"text":351,"correct":22},"季度",{"key":27,"text":353,"correct":22},"半年",{"key":31,"text":355,"correct":22},"年",{"id":357,"libraryId":5,"type":15,"typeLabel":16,"stem":358,"options":359,"answer":27,"analysis":33},1151196,"最后一笔保留金的支付时间是（ ）。",[360,362,364,366],{"key":20,"text":361,"correct":22},"合同项目完工并终止后",{"key":24,"text":363,"correct":22},"合同项目完工并签发工程移交证书之后",{"key":27,"text":365,"correct":29},"工程缺陷责任期满之后",{"key":31,"text":367,"correct":22},"最终决算",{"id":369,"libraryId":5,"type":15,"typeLabel":16,"stem":370,"options":371,"answer":24,"analysis":33},1151197,"工程价款支付属合同履行过程的（ ）。",[372,374,376,378],{"key":20,"text":373,"correct":22},"最终支付",{"key":24,"text":375,"correct":29},"中期支付",{"key":27,"text":377,"correct":22},"计日工支付",{"key":31,"text":379,"correct":22},"预付款支付",{"id":381,"libraryId":5,"type":15,"typeLabel":16,"stem":382,"options":383,"answer":27,"analysis":33},1151198,"工程变更支付的方式为（ ）。",[384,386,387,389],{"key":20,"text":385,"correct":22},"随计日工支付",{"key":24,"text":379,"correct":22},{"key":27,"text":388,"correct":29},"随工程价款支付",{"key":31,"text":390,"correct":22},"最终决算支付",{"id":392,"libraryId":5,"type":15,"typeLabel":16,"stem":393,"options":394,"answer":27,"analysis":33},1151199,"水力发电工程的工程项目划分一般分为（ ）级。",[395,396,397,398],{"key":20,"text":248,"correct":22},{"key":24,"text":250,"correct":22},{"key":27,"text":252,"correct":29},{"key":31,"text":254,"correct":22},{"id":400,"libraryId":5,"type":15,"typeLabel":16,"stem":401,"options":402,"answer":20,"analysis":33},1151200,"水力发电工程施工中，承建单位在下列工程开工前应向监理机构报送施工组织设计的是（ ）。",[403,405,407,409],{"key":20,"text":404,"correct":29},"单位工程",{"key":24,"text":406,"correct":22},"分部工程",{"key":27,"text":408,"correct":22},"分项工程",{"key":31,"text":410,"correct":22},"单元工程",{"id":412,"libraryId":5,"type":15,"typeLabel":16,"stem":413,"options":414,"answer":31,"analysis":33},1151201,"不合格单元工程必须经返工或补工合格并取得（ ）认证后，方准予进入下道工序或后序单元工程开工。",[415,417,419,421],{"key":20,"text":416,"correct":22},"项目法人",{"key":24,"text":418,"correct":22},"质监机构",{"key":27,"text":420,"correct":22},"水行政主管部门",{"key":31,"text":228,"correct":29},{"id":423,"libraryId":5,"type":15,"typeLabel":16,"stem":424,"options":425,"answer":31,"analysis":33},1151202,"工程项目划分及开工申报是施工监理（ ）的基本内容。",[426,428,430,432],{"key":20,"text":427,"correct":22},"工程费用控制",{"key":24,"text":429,"correct":22},"工程进度控制",{"key":27,"text":431,"correct":22},"合同商务管理",{"key":31,"text":433,"correct":29},"工程质量控制",{"id":435,"libraryId":5,"type":15,"typeLabel":16,"stem":436,"options":437,"answer":20,"analysis":33},1151203,"根据《国家电网公司水电建设项目法人单位安全生产管理规定》，工程建设安全管理第一责任者是（ ）。",[438,439,440,442],{"key":20,"text":416,"correct":29},{"key":24,"text":332,"correct":22},{"key":27,"text":441,"correct":22},"施工单位",{"key":31,"text":443,"correct":22},"质量监督单位",{"id":445,"libraryId":5,"type":15,"typeLabel":16,"stem":446,"options":447,"answer":20,"analysis":33},1151204,"在河道管理范围内建设桥梁、码头和其他拦河设施，工程建设方案应报经有关（ ）审查同意。",[448,449,451,453],{"key":20,"text":420,"correct":29},{"key":24,"text":450,"correct":22},"流域管理机构",{"key":27,"text":452,"correct":22},"河道堤防管理部门",{"key":31,"text":454,"correct":22},"地方人民政府",{"id":456,"libraryId":5,"type":15,"typeLabel":16,"stem":457,"options":458,"answer":24,"analysis":33},1151205,"水工程建设涉及防洪的，应依照（ ）的有关规定执行。",[459,461,463,465],{"key":20,"text":460,"correct":22},"《水法》",{"key":24,"text":462,"correct":29},"《防洪法》",{"key":27,"text":464,"correct":22},"《河道管理条例》",{"key":31,"text":466,"correct":22},"《防汛条例》",{"id":468,"libraryId":5,"type":15,"typeLabel":16,"stem":469,"options":470,"answer":27,"analysis":33},1151206,"为开发、利用、节约、保护水资源和防治水害，在流域范围内制定的防洪、治涝、水资源保护等规划属于（ ）。",[471,473,475,477],{"key":20,"text":472,"correct":22},"区域规划",{"key":24,"text":474,"correct":22},"水资源综合规划",{"key":27,"text":476,"correct":29},"流域专业规划",{"key":31,"text":478,"correct":22},"流域综合规划",{"id":480,"libraryId":5,"type":15,"typeLabel":16,"stem":481,"options":482,"answer":24,"analysis":33},1151207,"水利工程保护范围内的土地应（ ）。",[483,485,487,489],{"key":20,"text":484,"correct":22},"与工程占地范围一起征用",{"key":24,"text":486,"correct":29},"不征用",{"key":27,"text":488,"correct":22},"由工程管理单位进行管理",{"key":31,"text":490,"correct":22},"临时征用",{"id":492,"libraryId":5,"type":15,"typeLabel":16,"stem":493,"options":494,"answer":24,"analysis":33},1151208,"流域范围内的区域规划应当服从（ ）。",[495,497,499,501],{"key":20,"text":496,"correct":22},"专业规划",{"key":24,"text":498,"correct":29},"流域规划",{"key":27,"text":500,"correct":22},"综合规划",{"key":31,"text":502,"correct":22},"战略规划",{"id":504,"libraryId":5,"type":15,"typeLabel":16,"stem":505,"options":506,"answer":27,"analysis":33},1151209,"开发、利用、节约、保护水资源和防治水害，应当按照（ ）统一制定规划。",[507,509,511,513],{"key":20,"text":508,"correct":22},"国家、区域",{"key":24,"text":510,"correct":22},"地方、流域",{"key":27,"text":512,"correct":29},"流域、区域",{"key":31,"text":514,"correct":22},"国家、地方",{"id":516,"libraryId":5,"type":15,"typeLabel":16,"stem":517,"options":518,"answer":27,"analysis":33},1151210,"中型水库工程保护范围，在上、下游（ ）米",[519,521,523,525],{"key":20,"text":520,"correct":22},"100～150",{"key":24,"text":522,"correct":22},"150～200",{"key":27,"text":524,"correct":29},"200～300",{"key":31,"text":526,"correct":22},"300～500",{"id":528,"libraryId":5,"type":15,"typeLabel":16,"stem":529,"options":530,"answer":27,"analysis":33},1151211,"2级水闸工程两侧建筑物覆盖范围以外的管理范围（宽度）一般为（ ）。",[531,533,535,537],{"key":20,"text":532,"correct":22},"200～300m",{"key":24,"text":534,"correct":22},"100～200m",{"key":27,"text":536,"correct":29},"50～100m",{"key":31,"text":538,"correct":22},"30～50m",{"id":540,"libraryId":5,"type":15,"typeLabel":16,"stem":541,"options":542,"answer":31,"analysis":33},1151212,"水闸管理单位对水闸工程的管理范围（ ）。",[543,545,547,549],{"key":20,"text":544,"correct":22},"有管理权但无使用权",{"key":24,"text":546,"correct":22},"仅有管理和保护权",{"key":27,"text":548,"correct":22},"有间接管理和使用权",{"key":31,"text":550,"correct":29},"有直接管理和使用权",{"id":552,"libraryId":5,"type":15,"typeLabel":16,"stem":553,"options":554,"answer":20,"analysis":33},1151213,"堤防工程的护堤地属水利工程的（ ）。",[555,557,559,561],{"key":20,"text":556,"correct":29},"管理范围",{"key":24,"text":558,"correct":22},"保护范围",{"key":27,"text":560,"correct":22},"工程覆盖范围",{"key":31,"text":562,"correct":22},"临时用地范围",{"id":564,"libraryId":5,"type":15,"typeLabel":16,"stem":565,"options":566,"answer":24,"analysis":33},1151214,"为防止在工程设施周边进行对工程设施安全有不良影响的其他活动，满足工程安全需要而划定的范围为（ ）。",[567,568,569,571],{"key":20,"text":556,"correct":22},{"key":24,"text":558,"correct":29},{"key":27,"text":570,"correct":22},"影响范围",{"key":31,"text":572,"correct":22},"限制范围",{"id":574,"libraryId":5,"type":15,"typeLabel":16,"stem":575,"options":576,"answer":27,"analysis":33},1151215,"根据《水法》规定，在河道管理范围内铺设跨河管道、电缆属于（ ）。",[577,579,581,583],{"key":20,"text":578,"correct":22},"禁止性规定",{"key":24,"text":580,"correct":22},"非禁止性规定",{"key":27,"text":582,"correct":29},"限制性规定",{"key":31,"text":584,"correct":22},"非限制性规定",{"id":586,"libraryId":5,"type":15,"typeLabel":16,"stem":587,"options":588,"answer":27,"analysis":33},1151216,"无堤防的河道、湖泊的管理范围是（ ）。",[589,591,593,595],{"key":20,"text":590,"correct":22},"河道、湖泊岸线外侧100m范围内",{"key":24,"text":592,"correct":22},"校核洪水位之间的水域、沙洲、滩地和行洪区",{"key":27,"text":594,"correct":29},"历史最高洪水位或设计洪水位之间的水域沙洲、滩地和行洪区",{"key":31,"text":596,"correct":22},"以岸线两侧第一道分水岭为界",[598,601,604,607,610,613],{"id":15,"name":599,"category":7,"favorite":600},"领导干部任职前廉政法规知识测试题",92,{"id":602,"name":603,"category":7,"favorite":15},595,"建筑结构与设备",{"id":605,"name":606,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":608,"name":609,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":611,"name":612,"category":7,"favorite":8},534,"BIM工程师",{"id":614,"name":612,"category":7,"favorite":8},535]