[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-803-23":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":597},{"id":5,"name":6,"category":7,"favorite":8},803,"一建水利水电工程实务","建筑工程",0,23,50,1981,[13,34,43,55,66,78,90,102,114,126,137,149,161,172,184,194,205,213,225,235,246,257,269,280,292,303,315,327,339,351,363,374,386,398,410,422,434,446,458,470,482,494,502,514,526,538,549,561,573,585],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":33},1151115,1,"单选题","单位工程完工验收由（ ）主持。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","项目法人",true,{"key":24,"text":25,"correct":26},"B","监理单位",false,{"key":28,"text":29,"correct":26},"C","项目法人或监理单位",{"key":31,"text":32,"correct":26},"D","竣工验收主持单位或其委托单位","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},1151116,"单位工程投入使用验收可由（ ）主持。",[38,39,41,42],{"key":20,"text":32,"correct":22},{"key":24,"text":40,"correct":26},"主管部门",{"key":28,"text":25,"correct":26},{"key":31,"text":29,"correct":26},{"id":44,"libraryId":5,"type":15,"typeLabel":16,"stem":45,"options":46,"answer":20,"analysis":33},1151117,"分部工程验收的成果文件是（ ）。",[47,49,51,53],{"key":20,"text":48,"correct":22},"分部工程验收鉴定书",{"key":24,"text":50,"correct":26},"分部工程验收签证书",{"key":28,"text":52,"correct":26},"分部工程验收报告",{"key":31,"text":54,"correct":26},"分部工程验收证明书",{"id":56,"libraryId":5,"type":15,"typeLabel":16,"stem":57,"options":58,"answer":31,"analysis":33},1151118,"下列单位可不参加分部工程验收的是（ ）。",[59,60,62,64],{"key":20,"text":21,"correct":26},{"key":24,"text":61,"correct":26},"设计单位",{"key":28,"text":63,"correct":26},"施工单位",{"key":31,"text":65,"correct":22},"运行管理单位",{"id":67,"libraryId":5,"type":15,"typeLabel":16,"stem":68,"options":69,"answer":31,"analysis":33},1151119,"分部工程验收应具备的条件是该分部工程（ ）。",[70,72,74,76],{"key":20,"text":71,"correct":26},"80%以上的单元工程已经完建且质量合格",{"key":24,"text":73,"correct":26},"所有单位工程已经完建且质量合格",{"key":28,"text":75,"correct":26},"80%以上的单位工程已经完建且质量合格",{"key":31,"text":77,"correct":22},"所有单元工程已经完建且质量合格",{"id":79,"libraryId":5,"type":15,"typeLabel":16,"stem":80,"options":81,"answer":24,"analysis":33},1151120,"项目法人应自工程开工之日起（ ）个工作日内，制定法人验收工作计划，报法人验收监督管理机关备案。",[82,84,86,88],{"key":20,"text":83,"correct":26},"90",{"key":24,"text":85,"correct":22},"60",{"key":28,"text":87,"correct":26},"30",{"key":31,"text":89,"correct":26},"7",{"id":91,"libraryId":5,"type":15,"typeLabel":16,"stem":92,"options":93,"answer":31,"analysis":33},1151121,"根据《水利水电建设工程验收规程》SL223-2008的规定，下列验收属于政府验收的是（ ）。",[94,96,98,100],{"key":20,"text":95,"correct":26},"单位工程",{"key":24,"text":97,"correct":26},"分部工程",{"key":28,"text":99,"correct":26},"单项合同工程",{"key":31,"text":101,"correct":22},"阶段验收",{"id":103,"libraryId":5,"type":15,"typeLabel":16,"stem":104,"options":105,"answer":20,"analysis":33},1151122,"若1\u002F2以上的委员（组员）对验收过程中发现的问题有不同裁决意见时，法人验收应报请（ ）决定。",[106,108,110,112],{"key":20,"text":107,"correct":22},"验收监督管理机关",{"key":24,"text":109,"correct":26},"竣工验收主持单位",{"key":28,"text":111,"correct":26},"质量监督部门",{"key":31,"text":113,"correct":26},"县级以上人民政府",{"id":115,"libraryId":5,"type":15,"typeLabel":16,"stem":116,"options":117,"answer":24,"analysis":33},1151123,"验收结论必须经（ ）似上验收委员会成员同意。",[118,120,122,124],{"key":20,"text":119,"correct":26},"1\u002F3",{"key":24,"text":121,"correct":22},"2\u002F3",{"key":28,"text":123,"correct":26},"3\u002F5",{"key":31,"text":125,"correct":26},"1\u002F2",{"id":127,"libraryId":5,"type":15,"typeLabel":16,"stem":128,"options":129,"answer":20,"analysis":33},1151124,"根据《水利水电建设工程验收规程》SL223-2008的规定，下列验收属于法人验收的是（ ）。",[130,132,133,135],{"key":20,"text":131,"correct":22},"单位工程验收",{"key":24,"text":101,"correct":26},{"key":28,"text":134,"correct":26},"竣工验收",{"key":31,"text":136,"correct":26},"专项验收",{"id":138,"libraryId":5,"type":15,"typeLabel":16,"stem":139,"options":140,"answer":28,"analysis":33},1151125,"下列关于工程验收和投入使用的说法，正确的是（ ）。",[141,143,145,147],{"key":20,"text":142,"correct":26},"验收不合格的工程不得交付使用，但经项目法人同意后可进行后续工程施工",{"key":24,"text":144,"correct":26},"未经验收的工程一般不得交付使用，但对特殊情况的工程经主管部门同意后，可提前投入使用，然后再组织验收",{"key":28,"text":146,"correct":22},"未经验收或验收不合格的工程不得交付使用或进行后续工程施工",{"key":31,"text":148,"correct":26},"未经验收的工程不得交付使用，但经监理单位同意后可进行后续工程施工",{"id":150,"libraryId":5,"type":15,"typeLabel":16,"stem":151,"options":152,"answer":28,"analysis":33},1151126,"根据《水利水电建设工程验收规程》SL223-2008，按照验收主持单位，水利水电工程验收可分为（ ）。",[153,155,157,159],{"key":20,"text":154,"correct":26},"分部工程验收和单位工程验收",{"key":24,"text":156,"correct":26},"阶段验收和竣工验收",{"key":28,"text":158,"correct":22},"法人验收和政府验收",{"key":31,"text":160,"correct":26},"单位工程验收和竣工验收",{"id":162,"libraryId":5,"type":15,"typeLabel":16,"stem":163,"options":164,"answer":31,"analysis":33},1151127,"水利工程必须经过（ ）验收合格后，方可以投入使用。",[165,166,168,170],{"key":20,"text":95,"correct":26},{"key":24,"text":167,"correct":26},"单位工程完工",{"key":28,"text":169,"correct":26},"阶段",{"key":31,"text":171,"correct":22},"竣工",{"id":173,"libraryId":5,"type":15,"typeLabel":16,"stem":174,"options":175,"answer":31,"analysis":33},1151128,"《国务院办公厅关于加强基础设施工程质量管理的通知》（国办发[1999]16号）要求，为了加强公益性建设项目的验收管理，必须执行（ ）。",[176,178,180,182],{"key":20,"text":177,"correct":26},"项目经理责任制",{"key":24,"text":179,"correct":26},"安全生产责任制",{"key":28,"text":181,"correct":26},"单元工程质量评定标准",{"key":31,"text":183,"correct":22},"竣工验收制度",{"id":185,"libraryId":5,"type":15,"typeLabel":16,"stem":186,"options":187,"answer":20,"analysis":33},1151129,"（ ）应及时将工程竣工验收总结报告、验收鉴定书及相关资料报送省级人民政府能源主管部门。",[188,189,191,193],{"key":20,"text":109,"correct":22},{"key":24,"text":190,"correct":26},"竣工验收委员会",{"key":28,"text":192,"correct":26},"竣工验收委员会主任委员",{"key":31,"text":21,"correct":26},{"id":195,"libraryId":5,"type":15,"typeLabel":16,"stem":196,"options":197,"answer":28,"analysis":33},1151130,"水电工程的竣工验收由（ ）负责。",[198,199,201,203],{"key":20,"text":21,"correct":26},{"key":24,"text":200,"correct":26},"上级主管部门",{"key":28,"text":202,"correct":22},"省级人民政府能源主管部门",{"key":31,"text":204,"correct":26},"电站的运行管理单位",{"id":206,"libraryId":5,"type":15,"typeLabel":16,"stem":207,"options":208,"answer":28,"analysis":33},1151131,"各专项验收（包括枢纽工程、库区移民、环保、消防、劳动安全卫生、工程档案、工程竣工决算）工作完成后，（ ）对验收工作进行总结，提出工程竣工验收总结报告。",[209,210,211,212],{"key":20,"text":25,"correct":26},{"key":24,"text":61,"correct":26},{"key":28,"text":21,"correct":22},{"key":31,"text":63,"correct":26},{"id":214,"libraryId":5,"type":15,"typeLabel":16,"stem":215,"options":216,"answer":20,"analysis":33},1151132,"省级人民政府能源主管部门对符合竣工验收条件的水电工程应颁发（ ）。",[217,219,221,223],{"key":20,"text":218,"correct":22},"竣工验收证书",{"key":24,"text":220,"correct":26},"竣工证书",{"key":28,"text":222,"correct":26},"完工证书",{"key":31,"text":224,"correct":26},"竣工验收鉴定书",{"id":226,"libraryId":5,"type":15,"typeLabel":16,"stem":227,"options":228,"answer":24,"analysis":33},1151133,"枢纽工程专项验收由（ ）负责。",[229,231,232,234],{"key":20,"text":230,"correct":26},"项目法人会同电网经营管理单位",{"key":24,"text":202,"correct":22},{"key":28,"text":233,"correct":26},"项目法人会同有关省级政府主管部门",{"key":31,"text":21,"correct":26},{"id":236,"libraryId":5,"type":15,"typeLabel":16,"stem":237,"options":238,"answer":20,"analysis":33},1151134,"水电工程验收委员会主任委员裁决意见有半数以上委员反对或难以裁决的重大问题，应由（ ）报请验收主持单位决定。",[239,241,242,244],{"key":20,"text":240,"correct":22},"验收委员会",{"key":24,"text":21,"correct":26},{"key":28,"text":243,"correct":26},"验收主持单位",{"key":31,"text":245,"correct":26},"地方政府",{"id":247,"libraryId":5,"type":15,"typeLabel":16,"stem":248,"options":249,"answer":20,"analysis":33},1151135,"水电工程验收过程中的争议，由（ ）协调、裁决。",[250,252,254,256],{"key":20,"text":251,"correct":22},"验收委员会主任委员",{"key":24,"text":253,"correct":26},"上级水行政主管部门",{"key":28,"text":255,"correct":26},"外聘专家",{"key":31,"text":243,"correct":26},{"id":258,"libraryId":5,"type":15,"typeLabel":16,"stem":259,"options":260,"answer":20,"analysis":33},1151136,"根据有关规定，机组启动验收，由（ ）进行。",[261,263,265,267],{"key":20,"text":262,"correct":22},"项目法人会同电网经营管理单位共同组织机组启动验收委员会",{"key":24,"text":264,"correct":26},"国家有关部门委托国家电力公司或其他单位会同有关省级政府主管部门共同组织工程蓄水验收委员会",{"key":28,"text":266,"correct":26},"项目法人会同有关省级政府主管部门共同组织工程截流验收委员会",{"key":31,"text":268,"correct":26},"项目法人自行组织",{"id":270,"libraryId":5,"type":15,"typeLabel":16,"stem":271,"options":272,"answer":24,"analysis":33},1151137,"根据有关规定，工程蓄水验收由（ ）进行。",[273,275,277,279],{"key":20,"text":274,"correct":26},"项目法人会同电网经营管理单位共同组织验收委员会",{"key":24,"text":276,"correct":22},"省级人民政府能源主管部门负责，并委托有业绩、能力单位作为技术主持单位，组织验收委员会",{"key":28,"text":278,"correct":26},"项目法人会同有关省级政府主管部门共同组织工程验收委员会",{"key":31,"text":268,"correct":26},{"id":281,"libraryId":5,"type":15,"typeLabel":16,"stem":282,"options":283,"answer":24,"analysis":33},1151138,"项目法人应在计划蓄水时间前（ ）向有关部门报送蓄水验收申请报告。",[284,286,288,290],{"key":20,"text":285,"correct":26},"3个月",{"key":24,"text":287,"correct":22},"6个月",{"key":28,"text":289,"correct":26},"9个月",{"key":31,"text":291,"correct":26},"1年",{"id":293,"libraryId":5,"type":15,"typeLabel":16,"stem":294,"options":295,"answer":20,"analysis":33},1151140,"对于水电工程，工程截流验收由（ ）共同组织工程截流验收委员会进行。",[296,298,300,302],{"key":20,"text":297,"correct":22},"项目法人会同省级发展改革委、能源主管部门",{"key":24,"text":299,"correct":26},"项目审批部门会同省级政府主管部门、能源主管部门",{"key":28,"text":301,"correct":26},"项目法人会同参建各单位",{"key":31,"text":230,"correct":26},{"id":304,"libraryId":5,"type":15,"typeLabel":16,"stem":305,"options":306,"answer":24,"analysis":33},1151141,"根据《水电工程验收管理办法》（2015年修订版），截流验收前应进行（ ）专项验收。",[307,309,311,313],{"key":20,"text":308,"correct":26},"环境保护",{"key":24,"text":310,"correct":22},"建设征地移民安置",{"key":28,"text":312,"correct":26},"水土保持",{"key":31,"text":314,"correct":26},"劳动安全与工业卫生",{"id":316,"libraryId":5,"type":15,"typeLabel":16,"stem":317,"options":318,"answer":31,"analysis":33},1151142,"根据相关规范，不能作为水电工程验收依据的是（ ）。",[319,321,323,325],{"key":20,"text":320,"correct":26},"可行性研究设计文件",{"key":24,"text":322,"correct":26},"项目审批、核准",{"key":28,"text":324,"correct":26},"合同中明确采用的规程、规范",{"key":31,"text":326,"correct":22},"单项工程验收报告",{"id":328,"libraryId":5,"type":15,"typeLabel":16,"stem":329,"options":330,"answer":31,"analysis":33},1151143,"下列验收中不属于水电工程阶段验收的是（ ）。",[331,333,335,337],{"key":20,"text":332,"correct":26},"截流验收",{"key":24,"text":334,"correct":26},"蓄水验收",{"key":28,"text":336,"correct":26},"水轮发电机组启动验收",{"key":31,"text":338,"correct":22},"部分工程投入使用验收",{"id":340,"libraryId":5,"type":15,"typeLabel":16,"stem":341,"options":342,"answer":28,"analysis":33},1151144,"根据《水电工程验收管理办法》（2015年修订版），负责水电工程验收监督管理工作的是（ ）。",[343,345,347,349],{"key":20,"text":344,"correct":26},"水利部",{"key":24,"text":346,"correct":26},"电监会",{"key":28,"text":348,"correct":22},"国家能源局",{"key":31,"text":350,"correct":26},"电力企业建设联合会",{"id":352,"libraryId":5,"type":15,"typeLabel":16,"stem":353,"options":354,"answer":31,"analysis":33},1151145,"下列人员中，可以专家身份参加专项施工方案审查论证会的是（ ）。",[355,357,359,361],{"key":20,"text":356,"correct":26},"项目法人单位人员",{"key":24,"text":358,"correct":26},"监理单位人员",{"key":28,"text":360,"correct":26},"设计单位人员",{"key":31,"text":362,"correct":22},"质量监督单位人员",{"id":364,"libraryId":5,"type":15,"typeLabel":16,"stem":365,"options":366,"answer":24,"analysis":33},1151146,"专项施工方案审查论证专家组应由（ ）名及以上符合相关专业要求的专家组成。",[367,369,371,372],{"key":20,"text":368,"correct":26},"3",{"key":24,"text":370,"correct":22},"5",{"key":28,"text":89,"correct":26},{"key":31,"text":373,"correct":26},"9",{"id":375,"libraryId":5,"type":15,"typeLabel":16,"stem":376,"options":377,"answer":24,"analysis":33},1151147,"下列关于施工进度计划横道图的说法，错误的是（ ）。",[378,380,382,384],{"key":20,"text":379,"correct":26},"横道图能表示出各项工作的划分、工作的开始时间和完成时间及工作之间的相互搭接关系",{"key":24,"text":381,"correct":22},"横道图能反映出实际工程进展速度及工程量的完成情况",{"key":28,"text":383,"correct":26},"横道图不能明确反映出各项工作之间错综复杂的相互关系，不利于建设工程进度的动态控制",{"key":31,"text":385,"correct":26},"横道图不能明确地反映出影响工期的关键工作和关键线路，不便于进度控制人员抓住主要矛盾",{"id":387,"libraryId":5,"type":15,"typeLabel":16,"stem":388,"options":389,"answer":28,"analysis":33},1151148,"低温季节混凝土施工时，为提高混凝土拌合料温度，不应直接加热的材料是（ ）。",[390,392,394,396],{"key":20,"text":391,"correct":26},"水",{"key":24,"text":393,"correct":26},"砂",{"key":28,"text":395,"correct":22},"水泥",{"key":31,"text":397,"correct":26},"碎石",{"id":399,"libraryId":5,"type":15,"typeLabel":16,"stem":400,"options":401,"answer":31,"analysis":33},1151149,"下列施工用电中不属于一类负荷的是（ ）。",[402,404,406,408],{"key":20,"text":403,"correct":26},"井、洞内的照明",{"key":24,"text":405,"correct":26},"基坑内的排水",{"key":28,"text":407,"correct":26},"泄洪设施",{"key":31,"text":409,"correct":22},"混凝土搅拌系统",{"id":411,"libraryId":5,"type":15,"typeLabel":16,"stem":412,"options":413,"answer":20,"analysis":33},1151150,"低温季节混凝土施工的气温标准为（ ）。",[414,416,418,420],{"key":20,"text":415,"correct":22},"日平均气温连续5d稳定在5℃以下或最低气温连续5d稳定在-3℃以下",{"key":24,"text":417,"correct":26},"日平均气温连续3d稳定在5℃以下或最低气温连续5d稳定在-3℃以下",{"key":28,"text":419,"correct":26},"日平均气温连续5d稳定在5℃以下或最低气温连续5d稳定在-5℃以下",{"key":31,"text":421,"correct":26},"日平均气温连续3d稳定在5℃以下或最低气温连续5d稳定在-5℃以下",{"id":423,"libraryId":5,"type":15,"typeLabel":16,"stem":424,"options":425,"answer":20,"analysis":33},1151151,"混凝土有效工程量不扣除单体占用的空间体积小于（ ）m3的钢筋和金属件，单体横截面面积小于（ ）㎡的空洞、排水管和凹槽等所占的体积。",[426,428,430,432],{"key":20,"text":427,"correct":22},"0.1,0.1",{"key":24,"text":429,"correct":26},"0.2,0.2",{"key":28,"text":431,"correct":26},"0.01,0.1",{"key":31,"text":433,"correct":26},"0.1,0.01",{"id":435,"libraryId":5,"type":15,"typeLabel":16,"stem":436,"options":437,"answer":28,"analysis":33},1151152,"一般土方开挖、淤泥流砂开挖、沟槽开挖和柱坑开挖按施工图纸所示开挖轮廓尺寸计算的（ ）以立方米为单位计量。",[438,440,442,444],{"key":20,"text":439,"correct":26},"实方体积",{"key":24,"text":441,"correct":26},"自然方体积",{"key":28,"text":443,"correct":22},"有效自然方体积",{"key":31,"text":445,"correct":26},"松方体积",{"id":447,"libraryId":5,"type":15,"typeLabel":16,"stem":448,"options":449,"answer":24,"analysis":33},1151153,"下列说法错误的是（ ）。",[450,452,454,456],{"key":20,"text":451,"correct":26},"除合同另有约定外，现场工艺试验所需费用，包含在现场工艺实验项目总价中，由发包人按《工程量清单》相应项目的总价支付",{"key":24,"text":453,"correct":22},"承包人承担的超大、超重件的运输费用，由发包人按《工程量清单》相应项目的总价支付",{"key":28,"text":455,"correct":26},"除合同另有约定外，承包人根据合同要求完成施工用电设施的建设、移设和拆除工作所需的费用，由发包人按《工程量清单》相应项目的工程单价或总价支付",{"key":31,"text":457,"correct":26},"除合同另有约定外，承包人根据合同要求完成仓库或存料场的建设、维护管理和拆除工作所需的费用，由发包人按《工程量清单》相应项目的工程单价或总价支付",{"id":459,"libraryId":5,"type":15,"typeLabel":16,"stem":460,"options":461,"answer":24,"analysis":33},1151154,"下列情形可以将投标报价高报的是（ ）。",[462,464,466,468],{"key":20,"text":463,"correct":26},"施工条件好、工作简单、工程量大的工程",{"key":24,"text":465,"correct":22},"工期要求急的工程",{"key":28,"text":467,"correct":26},"投标竞争对手多的工程",{"key":31,"text":469,"correct":26},"支付条件好的工程",{"id":471,"libraryId":5,"type":15,"typeLabel":16,"stem":472,"options":473,"answer":28,"analysis":33},1151155,"其他项目清单中的暂列金额一般可为分类分项工程项目和措施项目合价的（ ）。",[474,476,478,480],{"key":20,"text":475,"correct":26},"2%",{"key":24,"text":477,"correct":26},"3%",{"key":28,"text":479,"correct":22},"5%",{"key":31,"text":481,"correct":26},"10%",{"id":483,"libraryId":5,"type":15,"typeLabel":16,"stem":484,"options":485,"answer":31,"analysis":33},1151156,"为完成工程项目施工，发生于该工程施工过程中招标人要求计列的费用项目为（ ）。",[486,488,490,492],{"key":20,"text":487,"correct":26},"措施项目",{"key":24,"text":489,"correct":26},"零星工作项目",{"key":28,"text":491,"correct":26},"分类分项工程项目",{"key":31,"text":493,"correct":22},"其他项目",{"id":495,"libraryId":5,"type":15,"typeLabel":16,"stem":496,"options":497,"answer":20,"analysis":33},1151157,"为完成工程项目施工，发生于该工程项目施工前和施工过程中招标人不要求列明工程量的项目为（ ）。",[498,499,500,501],{"key":20,"text":487,"correct":22},{"key":24,"text":489,"correct":26},{"key":28,"text":491,"correct":26},{"key":31,"text":493,"correct":26},{"id":503,"libraryId":5,"type":15,"typeLabel":16,"stem":504,"options":505,"answer":28,"analysis":33},1151158,"根据《水利工程工程量清单计价规范》GB50501-2007，工程量清单有分类分项工程量清单、（ ）、其他项目清单和零星工作项目清单组成。",[506,508,510,512],{"key":20,"text":507,"correct":26},"环境保护措施清单",{"key":24,"text":509,"correct":26},"安全防护措施清单",{"key":28,"text":511,"correct":22},"措施项目清单",{"key":31,"text":513,"correct":26},"夜间施工措施清单",{"id":515,"libraryId":5,"type":15,"typeLabel":16,"stem":516,"options":517,"answer":31,"analysis":33},1151159,"分类分项工程量清单项目编码中500101002001的第五、六位为（ ）顺序码。",[518,520,522,524],{"key":20,"text":519,"correct":26},"水利工程",{"key":24,"text":521,"correct":26},"专业工程",{"key":28,"text":523,"correct":26},"分项工程",{"key":31,"text":525,"correct":22},"分类工程",{"id":527,"libraryId":5,"type":15,"typeLabel":16,"stem":528,"options":529,"answer":24,"analysis":33},1151160,"采购及保管费是指材料采购好保管过程中所发生的各项费用，按材料运到仓库价格，不包括（ ）的3%计算。",[530,532,534,536],{"key":20,"text":531,"correct":26},"包装费",{"key":24,"text":533,"correct":22},"运输保险费",{"key":28,"text":535,"correct":26},"运杂费",{"key":31,"text":537,"correct":26},"装卸费",{"id":539,"libraryId":5,"type":15,"typeLabel":16,"stem":540,"options":541,"answer":31,"analysis":33},1151161,"材料预算价格一般包括材料原价、运杂费、运输保险费和（ ）四项。",[542,544,545,547],{"key":20,"text":543,"correct":26},"采购费",{"key":24,"text":531,"correct":26},{"key":28,"text":546,"correct":26},"保管费",{"key":31,"text":548,"correct":22},"采购及保管费",{"id":550,"libraryId":5,"type":15,"typeLabel":16,"stem":551,"options":552,"answer":20,"analysis":33},1151162,"下列不属于其他直接费的是（ ）。",[553,555,557,559],{"key":20,"text":554,"correct":22},"企业管理费",{"key":24,"text":556,"correct":26},"特殊地区施工增加费",{"key":28,"text":558,"correct":26},"夜间施工增加费",{"key":31,"text":560,"correct":26},"冬雨期施工增加费",{"id":562,"libraryId":5,"type":15,"typeLabel":16,"stem":563,"options":564,"answer":20,"analysis":33},1151163,"某水利建筑安装工程的建筑工程单价计算中，直接费为Ⅰ，基本直接费为Ⅱ，已知间接费的费率为η，则间接费为（ ）。",[565,567,569,571],{"key":20,"text":566,"correct":22},"Ⅰ×η",{"key":24,"text":568,"correct":26},"Ⅱ×η",{"key":28,"text":570,"correct":26},"（Ⅰ+Ⅱ）×η",{"key":31,"text":572,"correct":26},"（Ⅰ-Ⅱ）×η",{"id":574,"libraryId":5,"type":15,"typeLabel":16,"stem":575,"options":576,"answer":28,"analysis":33},1151164,"根据《水电工程设计概算编制规定》（2013年版），土方工程间接费取直接费的（ ）。",[577,579,581,583],{"key":20,"text":578,"correct":26},"13.66%",{"key":24,"text":580,"correct":26},"10.73%",{"key":28,"text":582,"correct":22},"12.01%",{"key":31,"text":584,"correct":26},"17.01%",{"id":586,"libraryId":5,"type":15,"typeLabel":16,"stem":587,"options":588,"answer":31,"analysis":33},1151165,"根据《水利工程设计概（估）算编制规定（工程部分）》（水总[2014]429号文），水利工程费用中，直接费不包括（ ）。",[589,591,593,595],{"key":20,"text":590,"correct":26},"施工机械使用费",{"key":24,"text":592,"correct":26},"临时设施费",{"key":28,"text":594,"correct":26},"安全生产措施费",{"key":31,"text":596,"correct":22},"现场经费",[598,601,604,607,610,613],{"id":15,"name":599,"category":7,"favorite":600},"领导干部任职前廉政法规知识测试题",92,{"id":602,"name":603,"category":7,"favorite":15},595,"建筑结构与设备",{"id":605,"name":606,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":608,"name":609,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":611,"name":612,"category":7,"favorite":8},534,"BIM工程师",{"id":614,"name":612,"category":7,"favorite":8},535]