[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-803-22":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":569},{"id":5,"name":6,"category":7,"favorite":8},803,"一建水利水电工程实务","建筑工程",0,22,50,1981,[13,34,46,58,67,79,91,99,108,120,128,140,152,164,176,187,199,211,220,232,243,252,260,272,284,296,308,320,329,339,347,359,371,380,389,401,412,424,433,445,455,467,479,490,502,511,523,535,547,559],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},1151064,1,"单选题","工程主要材料、设备，应由（ ）负责招标采购。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","工程主管单位",false,{"key":24,"text":25,"correct":22},"B","建设行政主管部门",{"key":27,"text":28,"correct":29},"C","合同规定的采购单位",true,{"key":31,"text":32,"correct":22},"D","质量监督部门","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},1151065,"（ ）可以实行设计进度质量保留金制度。",[38,40,42,44],{"key":20,"text":39,"correct":22},"监理单位",{"key":24,"text":41,"correct":29},"项目法人",{"key":27,"text":43,"correct":22},"设计单位",{"key":31,"text":45,"correct":22},"施工单位",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":27,"analysis":33},1151066,"水电建设工程质量监督总站对工程质量的监督属（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"检察性质",{"key":24,"text":53,"correct":22},"监督性质",{"key":27,"text":55,"correct":29},"监察性质",{"key":31,"text":57,"correct":22},"政府性质",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":20,"analysis":33},1151067,"根据《水电建设工程质量管理暂行办法》（电水农[1997]220号），（ ）负责向质监总站报告工程质量工作。",[62,63,64,65],{"key":20,"text":41,"correct":29},{"key":24,"text":39,"correct":22},{"key":27,"text":45,"correct":22},{"key":31,"text":66,"correct":22},"质监总站驻工地代表",{"id":68,"libraryId":5,"type":15,"typeLabel":16,"stem":69,"options":70,"answer":27,"analysis":33},1151068,"在可行性研究及以前阶段的勘测、规划设计等前期工作中的工程质量（ ）。",[71,73,75,77],{"key":20,"text":72,"correct":22},"由项目法人负责",{"key":24,"text":74,"correct":22},"由项目审批部门负责",{"key":27,"text":76,"correct":29},"由设计单位负责",{"key":31,"text":78,"correct":22},"由项目主管部门负责",{"id":80,"libraryId":5,"type":15,"typeLabel":16,"stem":81,"options":82,"answer":24,"analysis":33},1151069,"按规定，监理单位不应审批施工单位的（ ）。",[83,85,87,89],{"key":20,"text":84,"correct":22},"施工组织设计",{"key":24,"text":86,"correct":29},"设计变更",{"key":27,"text":88,"correct":22},"施工技术措施",{"key":31,"text":90,"correct":22},"施工详图",{"id":92,"libraryId":5,"type":15,"typeLabel":16,"stem":93,"options":94,"answer":20,"analysis":33},1151070,"根据《水电建设工程质量管理暂行办法》（电水农[1997]220号），（ ）负责向质监总站进行事故报告。",[95,96,97,98],{"key":20,"text":41,"correct":29},{"key":24,"text":45,"correct":22},{"key":27,"text":39,"correct":22},{"key":31,"text":43,"correct":22},{"id":100,"libraryId":5,"type":15,"typeLabel":16,"stem":101,"options":102,"answer":24,"analysis":33},1151071,"组织设计交底的单位是（ ）。",[103,105,106,107],{"key":20,"text":104,"correct":22},"建设单位",{"key":24,"text":39,"correct":29},{"key":27,"text":45,"correct":22},{"key":31,"text":43,"correct":22},{"id":109,"libraryId":5,"type":15,"typeLabel":16,"stem":110,"options":111,"answer":27,"analysis":33},1151072,"监理单位对其验收合格项目的施工质量负（ ）。",[112,114,116,118],{"key":20,"text":113,"correct":22},"部分责任",{"key":24,"text":115,"correct":22},"间接责任",{"key":27,"text":117,"correct":29},"直接责任",{"key":31,"text":119,"correct":22},"全部责任",{"id":121,"libraryId":5,"type":15,"typeLabel":16,"stem":122,"options":123,"answer":31,"analysis":33},1151073,"工程建设实施过程中的工程质量由（ ）负总责。",[124,125,126,127],{"key":20,"text":45,"correct":22},{"key":24,"text":39,"correct":22},{"key":27,"text":43,"correct":22},{"key":31,"text":41,"correct":29},{"id":129,"libraryId":5,"type":15,"typeLabel":16,"stem":130,"options":131,"answer":20,"analysis":33},1151074,"以下属于项目法人应履行的职责是（ ）。",[132,134,136,138],{"key":20,"text":133,"correct":29},"负责向质监总站报告工程质量工作",{"key":24,"text":135,"correct":22},"审批施工单位的施工组织设计、施工技术措施、施工详图",{"key":27,"text":137,"correct":22},"签发设计单位的施工设计文件",{"key":31,"text":139,"correct":22},"组织设计交底",{"id":141,"libraryId":5,"type":15,"typeLabel":16,"stem":142,"options":143,"answer":24,"analysis":33},1151075,"根据《水利工程建设重大质量与安全事故应急预案》，下列不属于应急保证措施的是（ ）。",[144,146,148,150],{"key":20,"text":145,"correct":22},"通信与信息保障",{"key":24,"text":147,"correct":29},"应急支援与交通保障",{"key":27,"text":149,"correct":22},"物资与装备保障",{"key":31,"text":151,"correct":22},"人力资源保障",{"id":153,"libraryId":5,"type":15,"typeLabel":16,"stem":154,"options":155,"answer":27,"analysis":33},1151077,"下列关于《水利水电工程施工质量评定表》的填写，错误的是（ ）。",[156,158,160,162],{"key":20,"text":157,"correct":22},"应使用蓝色或黑色墨水钢笔填写",{"key":24,"text":159,"correct":22},"数字应使用阿拉伯数字",{"key":27,"text":161,"correct":29},"合格率用百分数表示，小数点后保留两位",{"key":31,"text":163,"correct":22},"评定日期中的年填写四位数",{"id":165,"libraryId":5,"type":15,"typeLabel":16,"stem":166,"options":167,"answer":27,"analysis":33},1151078,"疏浚单元工程质量评定优良等级标准中，一般项目，逐项应有（ ）及以上的检验点合格，且不合格点不应集中。",[168,170,172,174],{"key":20,"text":169,"correct":22},"85%",{"key":24,"text":171,"correct":22},"90%",{"key":27,"text":173,"correct":29},"95%",{"key":31,"text":175,"correct":22},"98%",{"id":177,"libraryId":5,"type":15,"typeLabel":16,"stem":178,"options":179,"answer":24,"analysis":33},1151079,"工序施工质量评定合格等级标准中，一般项目逐项应有（ ）及以上的检验点合格，且不合格点不应集中。",[180,182,184,186],{"key":20,"text":181,"correct":22},"60%",{"key":24,"text":183,"correct":29},"70%",{"key":27,"text":185,"correct":22},"80%",{"key":31,"text":171,"correct":22},{"id":188,"libraryId":5,"type":15,"typeLabel":16,"stem":189,"options":190,"answer":27,"analysis":33},1151080,"新标准将质量检验项目统一分为（ ）。",[191,193,195,197],{"key":20,"text":192,"correct":22},"保证项目",{"key":24,"text":194,"correct":22},"基本项目",{"key":27,"text":196,"correct":29},"主控项目、一般项目",{"key":31,"text":198,"correct":22},"不允许偏差项目",{"id":200,"libraryId":5,"type":15,"typeLabel":16,"stem":201,"options":202,"answer":27,"analysis":33},1151081,"参加工程外观质量评定的人员应具有工程师以上技术职称或相应执业资格，评定组人数应不少于（ ）人。",[203,205,207,209],{"key":20,"text":204,"correct":22},"3",{"key":24,"text":206,"correct":22},"4",{"key":27,"text":208,"correct":29},"5",{"key":31,"text":210,"correct":22},"6",{"id":212,"libraryId":5,"type":15,"typeLabel":16,"stem":213,"options":214,"answer":24,"analysis":33},1151082,"单位工程优良率高于（ ），工程项目方可评定为优良。",[215,217,218,219],{"key":20,"text":216,"correct":22},"50%",{"key":24,"text":183,"correct":29},{"key":27,"text":185,"correct":22},{"key":31,"text":169,"correct":22},{"id":221,"libraryId":5,"type":15,"typeLabel":16,"stem":222,"options":223,"answer":27,"analysis":33},1151083,"分部工程质量优良时，单元工程（ ）以上优良，重要隐蔽单元工程和关键部位单元工程有（ ）以上达到优良。",[224,226,228,230],{"key":20,"text":225,"correct":22},"50%,100%",{"key":24,"text":227,"correct":22},"60%,100%",{"key":27,"text":229,"correct":29},"70%,90%",{"key":31,"text":231,"correct":22},"80%,100%",{"id":233,"libraryId":5,"type":15,"typeLabel":16,"stem":234,"options":235,"answer":27,"analysis":33},1151084,"单位工程质量合格时，外观质量得分率达到（ ）以上；单位工程质量优良时，外观质量得分率达到（ ）以上。",[236,238,240,242],{"key":20,"text":237,"correct":22},"50%,70%",{"key":24,"text":239,"correct":22},"50%,80%",{"key":27,"text":241,"correct":29},"70%,85%",{"key":31,"text":231,"correct":22},{"id":244,"libraryId":5,"type":15,"typeLabel":16,"stem":245,"options":246,"answer":20,"analysis":33},1151085,"根据《水利水电工程施工质量检验与评定规程》SL176-2007的规定，水利水电工程施工质量等级分为（ ）级。",[247,249,250,251],{"key":20,"text":248,"correct":29},"2",{"key":24,"text":204,"correct":22},{"key":27,"text":206,"correct":22},{"key":31,"text":208,"correct":22},{"id":253,"libraryId":5,"type":15,"typeLabel":16,"stem":254,"options":255,"answer":31,"analysis":33},1151086,"工程项目竣工验收时，必须向验收委员会汇报并提交历次质量缺陷的备案资料的单位是（ ）。",[256,257,258,259],{"key":20,"text":45,"correct":22},{"key":24,"text":39,"correct":22},{"key":27,"text":43,"correct":22},{"key":31,"text":41,"correct":29},{"id":261,"libraryId":5,"type":15,"typeLabel":16,"stem":262,"options":263,"answer":24,"analysis":33},1151087,"堤防工程施工质量达不到设计要求，经加固补强后，造成外形尺寸改变或永久性缺陷的，经项目法人认为基本满足设计要求，其质量（ ）。",[264,266,268,270],{"key":20,"text":265,"correct":22},"按质量缺陷处理",{"key":24,"text":267,"correct":29},"可评定为合格",{"key":27,"text":269,"correct":22},"可评定为优良",{"key":31,"text":271,"correct":22},"重新进行评定",{"id":273,"libraryId":5,"type":15,"typeLabel":16,"stem":274,"options":275,"answer":24,"analysis":33},1151088,"单元工程质量达不到合格规定，但经加固补强并经鉴定达到设计要求，其质量可被评为（ ）。",[276,278,280,282],{"key":20,"text":277,"correct":22},"不合格",{"key":24,"text":279,"correct":29},"合格",{"key":27,"text":281,"correct":22},"优良",{"key":31,"text":283,"correct":22},"优秀",{"id":285,"libraryId":5,"type":15,"typeLabel":16,"stem":286,"options":287,"answer":24,"analysis":33},1151089,"根据《水利水电工程施工质量检验与评定规程》SL176-2007，工程质量检验的计量器具需经（ ）级以上人民政府技术监督部门认定的计量检定机构或其授权设置的计量检定机构进行检定，并具备有效的检定证书。",[288,290,292,294],{"key":20,"text":289,"correct":22},"乡",{"key":24,"text":291,"correct":29},"县",{"key":27,"text":293,"correct":22},"地区",{"key":31,"text":295,"correct":22},"省",{"id":297,"libraryId":5,"type":15,"typeLabel":16,"stem":298,"options":299,"answer":24,"analysis":33},1151090,"根据《水利水电工程施工质量检验与评定规程》SL176-2007，对某水闸工程，以下不属于重要隐蔽单元工程的是（ ）。",[300,302,304,306],{"key":20,"text":301,"correct":22},"闸室地基开挖",{"key":24,"text":303,"correct":29},"闸墩混凝土浇筑",{"key":27,"text":305,"correct":22},"闸基防渗",{"key":31,"text":307,"correct":22},"加固处理",{"id":309,"libraryId":5,"type":15,"typeLabel":16,"stem":310,"options":311,"answer":27,"analysis":33},1151091,"按《水利水电工程施工质量检验与评定规程》SL176-2007的有关规定，分部工程是指在一个建筑物内能组织发挥一种功能的建筑安装工程，是组成（ ）的各个部分。",[312,314,316,318],{"key":20,"text":313,"correct":22},"单项工程",{"key":24,"text":315,"correct":22},"单元工程",{"key":27,"text":317,"correct":29},"单位工程",{"key":31,"text":319,"correct":22},"单体工程",{"id":321,"libraryId":5,"type":15,"typeLabel":16,"stem":322,"options":323,"answer":24,"analysis":33},1151092,"根据《水利水电工程施工质量检验与评定规程》SL176-2007，（ ）指分部工程中由几个工种施工完成的最小综合体，是日常质量考核的基本单位。",[324,325,326,327],{"key":20,"text":317,"correct":22},{"key":24,"text":315,"correct":29},{"key":27,"text":313,"correct":22},{"key":31,"text":328,"correct":22},"群体工程",{"id":330,"libraryId":5,"type":15,"typeLabel":16,"stem":331,"options":332,"answer":20,"analysis":33},1151093,"具有独立发挥作用或独立施工条件的建筑物是指（ ）。",[333,334,336,338],{"key":20,"text":317,"correct":29},{"key":24,"text":335,"correct":22},"分部工程",{"key":27,"text":337,"correct":22},"重要隐蔽工程",{"key":31,"text":315,"correct":22},{"id":340,"libraryId":5,"type":15,"typeLabel":16,"stem":341,"options":342,"answer":27,"analysis":33},1151094,"根据《水利水电工程施工质量检验与评定规程》SL176-2007的规定，每个单位工程中的分部工程数目，不宜少于（ ）个。",[343,344,345,346],{"key":20,"text":204,"correct":22},{"key":24,"text":206,"correct":22},{"key":27,"text":208,"correct":29},{"key":31,"text":210,"correct":22},{"id":348,"libraryId":5,"type":15,"typeLabel":16,"stem":349,"options":350,"answer":20,"analysis":33},1151095,"根据《水利工程建设项目档案管理规定》（水办[2005]480号），档案专项验收时，应抽查各单位档案整理情况，其中竣工图抽查数量不得少于竣工图总数的（ ）。",[351,353,355,357],{"key":20,"text":352,"correct":29},"10%",{"key":24,"text":354,"correct":22},"20%",{"key":27,"text":356,"correct":22},"30%",{"key":31,"text":358,"correct":22},"40%",{"id":360,"libraryId":5,"type":15,"typeLabel":16,"stem":361,"options":362,"answer":27,"analysis":33},1151096,"下列关于水利工程档案验收的说法，不正确的是（ ）。",[363,365,367,369],{"key":20,"text":364,"correct":22},"档案验收不合格，不得进行或通过工程的竣工验收",{"key":24,"text":366,"correct":22},"档案验收可分为初步验收和正式验收",{"key":27,"text":368,"correct":29},"档案正式验收由项目法人负责",{"key":31,"text":370,"correct":22},"档案验收抽查档案总数应在200卷以上",{"id":372,"libraryId":5,"type":15,"typeLabel":16,"stem":373,"options":374,"answer":24,"analysis":33},1151097,"竣工图是水利工程档案的重要组成部分，其中的项目总平面图应由（ ）进行编制。",[375,376,377,379],{"key":20,"text":45,"correct":22},{"key":24,"text":41,"correct":29},{"key":27,"text":378,"correct":22},"监理",{"key":31,"text":43,"correct":22},{"id":381,"libraryId":5,"type":15,"typeLabel":16,"stem":382,"options":383,"answer":27,"analysis":33},1151098,"根据《水利工程建设项目档案管理规定》（水办[2005]480号）的规定，水利工程档案的归档工作由（ ）负责。",[384,385,386,388],{"key":20,"text":45,"correct":22},{"key":24,"text":41,"correct":22},{"key":27,"text":387,"correct":29},"文件的产生单位",{"key":31,"text":39,"correct":22},{"id":390,"libraryId":5,"type":15,"typeLabel":16,"stem":391,"options":392,"answer":27,"analysis":33},1151099,"根据《水利工程建设项目档案管理规定》（水办[2005]480号），水利工程档案的保管期限分为（ ），其中长期档案的实际保存期限，不得短于（ ）。",[393,395,397,399],{"key":20,"text":394,"correct":22},"永久和长期两种，50年",{"key":24,"text":396,"correct":22},"永久和长期两种，30年",{"key":27,"text":398,"correct":29},"永久、长期、短期三种，工程实际寿命",{"key":31,"text":400,"correct":22},"永久、长期、短期三种，70年",{"id":402,"libraryId":5,"type":15,"typeLabel":16,"stem":403,"options":404,"answer":20,"analysis":33},1151100,"项目法人应负责督促和检查遗留问题的处理，及时将处理结果报告（ ）。",[405,407,408,410],{"key":20,"text":406,"correct":29},"验收主持单位",{"key":24,"text":32,"correct":22},{"key":27,"text":409,"correct":22},"主管部门",{"key":31,"text":411,"correct":22},"竣工验收委员会",{"id":413,"libraryId":5,"type":15,"typeLabel":16,"stem":414,"options":415,"answer":27,"analysis":33},1151101,"水利水电工程竣工初步验收的成果是（ ）。",[416,418,420,422],{"key":20,"text":417,"correct":22},"竣工验收鉴定书初稿",{"key":24,"text":419,"correct":22},"初步验收鉴定书",{"key":27,"text":421,"correct":29},"初步验收工作报告",{"key":31,"text":423,"correct":22},"初步验收签证",{"id":425,"libraryId":5,"type":15,"typeLabel":16,"stem":426,"options":427,"answer":20,"analysis":33},1151102,"根据《堤防工程施工质量评定与验收规程（试行）》SL239-1999的规定，堤防工程竣工前的质量抽检项目和数量由（ ）确定。",[428,430,431,432],{"key":20,"text":429,"correct":29},"竣工验收主持单位",{"key":24,"text":39,"correct":22},{"key":27,"text":32,"correct":22},{"key":31,"text":41,"correct":22},{"id":434,"libraryId":5,"type":15,"typeLabel":16,"stem":435,"options":436,"answer":24,"analysis":33},1151103,"大型水利工程在（ ）前，应按照有关规定进行竣工技术鉴定。",[437,439,441,443],{"key":20,"text":438,"correct":22},"阶段验收",{"key":24,"text":440,"correct":29},"竣工技术预验收",{"key":27,"text":442,"correct":22},"完工验收",{"key":31,"text":444,"correct":22},"单元验收",{"id":446,"libraryId":5,"type":15,"typeLabel":16,"stem":447,"options":448,"answer":24,"analysis":33},1151104,"申请竣工验收前，（ ）应组织进行工程竣工验收的自查。",[449,451,452,453],{"key":20,"text":450,"correct":22},"上级主管部门",{"key":24,"text":41,"correct":29},{"key":27,"text":429,"correct":22},{"key":31,"text":454,"correct":22},"竣工验收主持单位委托单位",{"id":456,"libraryId":5,"type":15,"typeLabel":16,"stem":457,"options":458,"answer":27,"analysis":33},1151105,"根据《水利水电建设工程验收规程》SL223-2008，竣工验收应在工程建设项目全部完成并满足一定运行条件后（ ）内进行。",[459,461,463,465],{"key":20,"text":460,"correct":22},"3个月",{"key":24,"text":462,"correct":22},"6个月",{"key":27,"text":464,"correct":29},"1年",{"key":31,"text":466,"correct":22},"2年",{"id":468,"libraryId":5,"type":15,"typeLabel":16,"stem":469,"options":470,"answer":31,"analysis":33},1151106,"水电站机组启动验收的各台机组运行时间为投入系统带额定出力连续运行（ ）。",[471,473,475,477],{"key":20,"text":472,"correct":22},"24h",{"key":24,"text":474,"correct":22},"36h",{"key":27,"text":476,"correct":22},"48h",{"key":31,"text":478,"correct":29},"72h",{"id":480,"libraryId":5,"type":15,"typeLabel":16,"stem":481,"options":482,"answer":20,"analysis":33},1151107,"水电站的第一台（次）机组启动验收由（ ）主持。",[483,485,487,488],{"key":20,"text":484,"correct":29},"竣工验收主持单位或其委托单位",{"key":24,"text":486,"correct":22},"验收委员会可委托项目法人",{"key":27,"text":41,"correct":22},{"key":31,"text":489,"correct":22},"主管部门委托项目法人",{"id":491,"libraryId":5,"type":15,"typeLabel":16,"stem":492,"options":493,"answer":27,"analysis":33},1151108,"泵站每台机组投入运行前，均应进行机组启动（阶段）验收，按照规定，可由项目法人主持的机组启动（阶段）验收有（ ）。",[494,496,498,500],{"key":20,"text":495,"correct":22},"第一台次和第二台次",{"key":24,"text":497,"correct":22},"第一台次和最后一台次",{"key":27,"text":499,"correct":29},"除第一台次和最后一台次的其他台次",{"key":31,"text":501,"correct":22},"第一台次",{"id":503,"libraryId":5,"type":15,"typeLabel":16,"stem":504,"options":505,"answer":27,"analysis":33},1151109,"阶段验收的主持单位是（ ）。",[506,507,509,510],{"key":20,"text":41,"correct":22},{"key":24,"text":508,"correct":22},"项目法人或监理单位",{"key":27,"text":484,"correct":29},{"key":31,"text":39,"correct":22},{"id":512,"libraryId":5,"type":15,"typeLabel":16,"stem":513,"options":514,"answer":31,"analysis":33},1151110,"阶段验收应具备的条件是工程（ ）。",[515,517,519,521],{"key":20,"text":516,"correct":22},"30%以上的分部工程已经完建且质量合格",{"key":24,"text":518,"correct":22},"所有分部工程已经完建且质量合格",{"key":27,"text":520,"correct":22},"30%以上的单位工程已经完建且质量合格",{"key":31,"text":522,"correct":29},"对分部工程完成量没有具体要求",{"id":524,"libraryId":5,"type":15,"typeLabel":16,"stem":525,"options":526,"answer":20,"analysis":33},1151111,"项目法人应在单位工程验收通过之日起（ ）个工作日内，将验收质量结论和相关资料报质量监督机构核定。",[527,529,531,533],{"key":20,"text":528,"correct":29},"10",{"key":24,"text":530,"correct":22},"15",{"key":27,"text":532,"correct":22},"20",{"key":31,"text":534,"correct":22},"30",{"id":536,"libraryId":5,"type":15,"typeLabel":16,"stem":537,"options":538,"answer":20,"analysis":33},1151112,"单位工程验收的成果是（ ）。",[539,541,543,545],{"key":20,"text":540,"correct":29},"单位工程验收鉴定书",{"key":24,"text":542,"correct":22},"单位工程验收签证",{"key":27,"text":544,"correct":22},"单位工程验收报告",{"key":31,"text":546,"correct":22},"单位工程验收证明书",{"id":548,"libraryId":5,"type":15,"typeLabel":16,"stem":549,"options":550,"answer":27,"analysis":33},1151113,"单位工程完工验收应具备的条件是（ ）。",[551,553,555,557],{"key":20,"text":552,"correct":22},"单位工程已按批准设计文件规定的内容全部完成",{"key":24,"text":554,"correct":22},"已移交运行管理单位",{"key":27,"text":556,"correct":29},"单位工程所有分部工程已经完建并验收合格",{"key":31,"text":558,"correct":22},"少量尾工已妥善安排",{"id":560,"libraryId":5,"type":15,"typeLabel":16,"stem":561,"options":562,"answer":27,"analysis":33},1151114,"根据《水利水电建设工程验收规程》SL223-2008，在竣工验收前已经建成并能够发挥效益，需要提前投入使用的单位工程，在投入使用前应进行（ ）。",[563,565,566,568],{"key":20,"text":564,"correct":22},"分部验收",{"key":24,"text":444,"correct":22},{"key":27,"text":567,"correct":29},"投入使用验收",{"key":31,"text":438,"correct":22},[570,573,576,579,582,585],{"id":15,"name":571,"category":7,"favorite":572},"领导干部任职前廉政法规知识测试题",92,{"id":574,"name":575,"category":7,"favorite":15},595,"建筑结构与设备",{"id":577,"name":578,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":580,"name":581,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":583,"name":584,"category":7,"favorite":8},534,"BIM工程师",{"id":586,"name":584,"category":7,"favorite":8},535]