[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-803-2":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":584},{"id":5,"name":6,"category":7,"favorite":8},803,"一建水利水电工程实务","建筑工程",0,2,50,1981,[13,34,46,58,70,78,90,102,114,126,138,150,162,171,180,192,204,216,228,240,248,259,271,280,289,301,309,321,333,345,356,368,380,392,404,416,428,440,450,458,470,482,493,504,516,528,540,552,560,572],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":33},1150043,1,"单选题","（2018年真题）下图所示的消能方式属于（）。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","底流消能",true,{"key":24,"text":25,"correct":26},"B","挑流消能",false,{"key":28,"text":29,"correct":26},"C","面流消能",{"key":31,"text":32,"correct":26},"D","消力戽消能","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":28,"analysis":33},1150044,"（2015年）下图所示土石围堰的防渗形式属于（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":26},"斜墙式",{"key":24,"text":41,"correct":26},"斜墙带水平铺盖式",{"key":28,"text":43,"correct":22},"垂直防渗墙式",{"key":31,"text":45,"correct":26},"灌浆帷幕式",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":20,"analysis":33},1150045,"（2016年）下列围堰类型中，可以与永久建筑物相结合并作为其组成部分的是（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"A土石围堰",{"key":24,"text":53,"correct":26},"B草土围堰",{"key":28,"text":55,"correct":26},"C竹笼围堰",{"key":31,"text":57,"correct":26},"D木笼围堰",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":20,"analysis":33},1150046,"（2013年）对于渗透系数大、地下水丰富的软土地基，人工降低地下水位宜采用（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":22},"管井法",{"key":24,"text":65,"correct":26},"真空井点法",{"key":28,"text":67,"correct":26},"喷射井点法",{"key":31,"text":69,"correct":26},"电渗井点法",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":28,"analysis":33},1150047,"（2015年）如图所示土围堰的防渗形式属于（）。",[74,75,76,77],{"key":20,"text":39,"correct":26},{"key":24,"text":41,"correct":26},{"key":28,"text":43,"correct":22},{"key":31,"text":45,"correct":26},{"id":79,"libraryId":5,"type":15,"typeLabel":16,"stem":80,"options":81,"answer":24,"analysis":33},1150048,"（2018年真题）某5级均质土石围堰，采用简化毕肖普法验算其边坡稳定时，按《水利水电工程施工组织设计规范》（SL303-2017）规定，其边坡稳定安全系数应不小于（）。",[82,84,86,88],{"key":20,"text":83,"correct":26},"1.05",{"key":24,"text":85,"correct":22},"1.15",{"key":28,"text":87,"correct":26},"1.20",{"key":31,"text":89,"correct":26},"1.30",{"id":91,"libraryId":5,"type":15,"typeLabel":16,"stem":92,"options":93,"answer":31,"analysis":33},1150050,"（2017年）下列地基处理方法中，对软基和岩基均适用的方法是（ ）。",[94,96,98,100],{"key":20,"text":95,"correct":26},"旋喷桩",{"key":24,"text":97,"correct":26},"排水法",{"key":28,"text":99,"correct":26},"挤实法",{"key":31,"text":101,"correct":22},"灌浆法",{"id":103,"libraryId":5,"type":15,"typeLabel":16,"stem":104,"options":105,"answer":28,"analysis":33},1150051,"（2012年）帷幕灌浆施工完成后的质量检查应以检査（ ）为主。",[106,108,110,112],{"key":20,"text":107,"correct":26},"灌浆施工过程记录",{"key":24,"text":109,"correct":26},"灌浆结果标准",{"key":28,"text":111,"correct":22},"孔压水试验成果",{"key":31,"text":113,"correct":26},"孔岩芯获得率",{"id":115,"libraryId":5,"type":15,"typeLabel":16,"stem":116,"options":117,"answer":20,"analysis":33},1150052,"（2014年）对于成桩直径为0.6m的高压喷射灌浆，施工方法宜采用（ ）。",[118,120,122,124],{"key":20,"text":119,"correct":22},"单管法",{"key":24,"text":121,"correct":26},"二管法",{"key":28,"text":123,"correct":26},"三管法",{"key":31,"text":125,"correct":26},"新三管法",{"id":127,"libraryId":5,"type":15,"typeLabel":16,"stem":128,"options":129,"answer":24,"analysis":33},1150053,"（2013年)高压喷射灌浆凝结体形状如下图所示，其喷射形式为（ ）。",[130,132,134,136],{"key":20,"text":131,"correct":26},"旋喷",{"key":24,"text":133,"correct":22},"摆喷",{"key":28,"text":135,"correct":26},"定喷",{"key":31,"text":137,"correct":26},"混喷",{"id":139,"libraryId":5,"type":15,"typeLabel":16,"stem":140,"options":141,"answer":24,"analysis":33},1150054,"（2017年）水工隧洞中的灌浆顺序是（ ）",[142,144,146,148],{"key":20,"text":143,"correct":26},"固结灌浆.回填灌浆.接缝灌浆",{"key":24,"text":145,"correct":22},"回填灌浆.固结灌浆.接缝灌浆",{"key":28,"text":147,"correct":26},"回填灌浆.接缝灌浆.固结灌浆",{"key":31,"text":149,"correct":26},"固结灌浆.接缝灌浆.回填灌浆",{"id":151,"libraryId":5,"type":15,"typeLabel":16,"stem":152,"options":153,"answer":24,"analysis":33},1150055,"（2009年）用浆液灌入岩体裂隙中以提高岩体的整体性和抗变形能力的称为（ )灌浆。",[154,156,158,160],{"key":20,"text":155,"correct":26},"接缝",{"key":24,"text":157,"correct":22},"固结",{"key":28,"text":159,"correct":26},"接触",{"key":31,"text":161,"correct":26},"回填",{"id":163,"libraryId":5,"type":15,"typeLabel":16,"stem":164,"options":165,"answer":28,"analysis":33},1150056,"（2015年)形状如图所示的高压喷射灌浆凝结体，其喷射形式属于（ ）。",[166,167,168,169],{"key":20,"text":131,"correct":26},{"key":24,"text":133,"correct":26},{"key":28,"text":135,"correct":22},{"key":31,"text":170,"correct":26},"提喷",{"id":172,"libraryId":5,"type":15,"typeLabel":16,"stem":173,"options":174,"answer":31,"analysis":33},1150057,"（2011年）泄洪隧洞衬砌混凝土与围岩之间空隙的灌浆方式属于（ ）灌浆。",[175,177,178,179],{"key":20,"text":176,"correct":26},"帷幕",{"key":24,"text":159,"correct":26},{"key":28,"text":157,"correct":26},{"key":31,"text":161,"correct":22},{"id":181,"libraryId":5,"type":15,"typeLabel":16,"stem":182,"options":183,"answer":28,"analysis":33},1150058,"（2018年真题）采用钻孔法检查高喷墙的防渗性能时，钻孔检查宜在相应部位高喷灌浆结束（）后进行。",[184,186,188,190],{"key":20,"text":185,"correct":26},"7d",{"key":24,"text":187,"correct":26},"14d",{"key":28,"text":189,"correct":22},"28d",{"key":31,"text":191,"correct":26},"56d",{"id":193,"libraryId":5,"type":15,"typeLabel":16,"stem":194,"options":195,"answer":31,"analysis":33},1150059,"（2012年）评价土地平衡调配合理性的主要指标是（ ）。",[196,198,200,202],{"key":20,"text":197,"correct":26},"运输条件",{"key":24,"text":199,"correct":26},"运输距离",{"key":28,"text":201,"correct":26},"运输时间",{"key":31,"text":203,"correct":22},"运输费用",{"id":205,"libraryId":5,"type":15,"typeLabel":16,"stem":206,"options":207,"answer":28,"analysis":33},1150060,"（2016年）重要建筑物附近的基坑岩石采用爆破开挖时，应先进行（ ）。",[208,210,212,214],{"key":20,"text":209,"correct":26},"浅孔爆破",{"key":24,"text":211,"correct":26},"深孔爆破",{"key":28,"text":213,"correct":22},"预裂爆破",{"key":31,"text":215,"correct":26},"光面爆破",{"id":217,"libraryId":5,"type":15,"typeLabel":16,"stem":218,"options":219,"answer":24,"analysis":33},1150061,"（2007年）大型基坑石方开挖优先采用的爆破方法是（ ）爆破法。",[220,222,224,226],{"key":20,"text":221,"correct":26},"浅孔",{"key":24,"text":223,"correct":22},"深孔",{"key":28,"text":225,"correct":26},"洞室",{"key":31,"text":227,"correct":26},"光面",{"id":229,"libraryId":5,"type":15,"typeLabel":16,"stem":230,"options":231,"answer":31,"analysis":33},1150062,"（2017年）水利水电工程施工中，将土石共分为16级，其中岩石分（ ）级。",[232,234,236,238],{"key":20,"text":233,"correct":26},"6",{"key":24,"text":235,"correct":26},"8",{"key":28,"text":237,"correct":26},"10",{"key":31,"text":239,"correct":22},"12",{"id":241,"libraryId":5,"type":15,"typeLabel":16,"stem":242,"options":243,"answer":31,"analysis":33},1150063,"（2017年）工程施工中，将土石分为16级，其中岩石分（ ）级。",[244,245,246,247],{"key":20,"text":233,"correct":26},{"key":24,"text":235,"correct":26},{"key":28,"text":237,"correct":26},{"key":31,"text":239,"correct":22},{"id":249,"libraryId":5,"type":15,"typeLabel":16,"stem":250,"options":251,"answer":20,"analysis":33},1150064,"（2006年）依开挖方法和开挖难易程度，将土分为（）级。",[252,254,256,257],{"key":20,"text":253,"correct":22},"4",{"key":24,"text":255,"correct":26},"5",{"key":28,"text":233,"correct":26},{"key":31,"text":258,"correct":26},"7",{"id":260,"libraryId":5,"type":15,"typeLabel":16,"stem":261,"options":262,"answer":31,"analysis":33},1150065,"（2011年）与深孔爆破法比较，浅孔爆破具有（）的特点。",[263,265,267,269],{"key":20,"text":264,"correct":26},"单位体积岩石相应钻孔工作量小",{"key":24,"text":266,"correct":26},"单位耗药量低",{"key":28,"text":268,"correct":26},"生产效率高",{"key":31,"text":270,"correct":22},"便于控制开挖面形状",{"id":272,"libraryId":5,"type":15,"typeLabel":16,"stem":273,"options":274,"answer":24,"analysis":33},1150066,"（2010年）水利工程采石场开采宜用（ ）爆破法。",[275,276,277,278],{"key":20,"text":221,"correct":26},{"key":24,"text":223,"correct":22},{"key":28,"text":225,"correct":26},{"key":31,"text":279,"correct":26},"预裂",{"id":281,"libraryId":5,"type":15,"typeLabel":16,"stem":282,"options":283,"answer":24,"analysis":33},1150067,"（2018年真题）水利水电工程施工中，依开挖方法和开挖难易程度等，将土分为（ )类。",[284,286,287,288],{"key":20,"text":285,"correct":26},"3",{"key":24,"text":253,"correct":22},{"key":28,"text":255,"correct":26},{"key":31,"text":233,"correct":26},{"id":290,"libraryId":5,"type":15,"typeLabel":16,"stem":291,"options":292,"answer":24,"analysis":33},1150068,"（2019年真题）Ⅱ类围岩的稳定状态是()。",[293,295,297,299],{"key":20,"text":294,"correct":26},"稳定",{"key":24,"text":296,"correct":22},"基本稳定",{"key":28,"text":298,"correct":26},"稳定性差",{"key":31,"text":300,"correct":26},"不稳定",{"id":302,"libraryId":5,"type":15,"typeLabel":16,"stem":303,"options":304,"answer":24,"analysis":33},1150069,"（2007年）用夯板压实土料时，其外力作用示意图是（）。",[305,306,307,308],{"key":20,"text":20,"correct":26},{"key":24,"text":24,"correct":22},{"key":28,"text":28,"correct":26},{"key":31,"text":31,"correct":26},{"id":310,"libraryId":5,"type":15,"typeLabel":16,"stem":311,"options":312,"answer":31,"analysis":33},1150070,"（2017年）土石坝填筑施工时，砂砾石的填筑标准应以（ ）作为设计控制指标。",[313,315,317,319],{"key":20,"text":314,"correct":26},"压实度",{"key":24,"text":316,"correct":26},"最优含水率",{"key":28,"text":318,"correct":26},"最大干密度",{"key":31,"text":320,"correct":22},"相对密度",{"id":322,"libraryId":5,"type":15,"typeLabel":16,"stem":323,"options":324,"answer":31,"analysis":33},1150071,"（2013年）某水库总库容为5亿m3，设计地震烈度为8度，相应其均质土坝压实度宜采用（ ）。",[325,327,329,331],{"key":20,"text":326,"correct":26},"96％",{"key":24,"text":328,"correct":26},"97％",{"key":28,"text":330,"correct":26},"98％",{"key":31,"text":332,"correct":22},"100％",{"id":334,"libraryId":5,"type":15,"typeLabel":16,"stem":335,"options":336,"answer":28,"analysis":33},1150072,"（2013年）填筑土石坝的非黏性土料含水量偏低时，应在（ ）加水。",[337,339,341,343],{"key":20,"text":338,"correct":26},"料场",{"key":24,"text":340,"correct":26},"运输途中",{"key":28,"text":342,"correct":22},"填筑坝面",{"key":31,"text":344,"correct":26},"养护期间",{"id":346,"libraryId":5,"type":15,"typeLabel":16,"stem":347,"options":348,"answer":20,"analysis":33},1150073,"（2010年）土坝黏性土填筑的设计控制指标包括最优含水率和（ ）。",[349,350,352,354],{"key":20,"text":314,"correct":22},{"key":24,"text":351,"correct":26},"密实度",{"key":28,"text":353,"correct":26},"最大干密",{"key":31,"text":355,"correct":26},"相对密实度",{"id":357,"libraryId":5,"type":15,"typeLabel":16,"stem":358,"options":359,"answer":31,"analysis":33},1150074,"（2009年）某土坝工程级别为 2 级，采用黏性土填筑，其设计压实度应为（ )。",[360,362,364,366],{"key":20,"text":361,"correct":26},"90%～92%",{"key":24,"text":363,"correct":26},"92%～96%",{"key":28,"text":365,"correct":26},"96%～98%",{"key":31,"text":367,"correct":22},"98%～100%",{"id":369,"libraryId":5,"type":15,"typeLabel":16,"stem":370,"options":371,"answer":20,"analysis":33},1150075,"（2011年）填筑土石坝的黏性土料含水量偏低时，应优先考虑在（ ）加水。",[372,374,376,378],{"key":20,"text":373,"correct":22},"运离料场前",{"key":24,"text":375,"correct":26},"铺料前",{"key":28,"text":377,"correct":26},"整平前",{"key":31,"text":379,"correct":26},"压实前",{"id":381,"libraryId":5,"type":15,"typeLabel":16,"stem":382,"options":383,"answer":20,"analysis":33},1150076,"（2006年）土石坝采用进退错距法施工，若施工工作面宽3.0m，碾压机械碾滚净宽1.5m，设计碾压遍数为5遍，则错距碾压宽度为（）m。",[384,386,388,390],{"key":20,"text":385,"correct":22},"0.3",{"key":24,"text":387,"correct":26},"0.5",{"key":28,"text":389,"correct":26},"0.6",{"key":31,"text":391,"correct":26},"2.0",{"id":393,"libraryId":5,"type":15,"typeLabel":16,"stem":394,"options":395,"answer":24,"analysis":33},1150077,"（2018年真题）黏性土堤防填筑施工中，在新层铺料前，需对光面层进行刨毛处理的压实机具是（）。",[396,398,400,402],{"key":20,"text":397,"correct":26},"羊足碾",{"key":24,"text":399,"correct":22},"光面碾",{"key":28,"text":401,"correct":26},"凸块碾",{"key":31,"text":403,"correct":26},"凸块振动碾",{"id":405,"libraryId":5,"type":15,"typeLabel":16,"stem":406,"options":407,"answer":24,"analysis":33},1150078,"（2012年）面板堆石坝坝体分区从迎水面到背水面依次是（ ）。",[408,410,412,414],{"key":20,"text":409,"correct":26},"过渡区、垫层区、主堆石区、次堆石料区",{"key":24,"text":411,"correct":22},"垫层区、过渡区、主堆石区、次堆石料区",{"key":28,"text":413,"correct":26},"垫层区、过渡区、次堆石料区、主堆石料区",{"key":31,"text":415,"correct":26},"过渡区、垫层区、次堆石料区、主堆石料区",{"id":417,"libraryId":5,"type":15,"typeLabel":16,"stem":418,"options":419,"answer":31,"analysis":33},1150079,"（2014年）混凝土面板堆石坝中面板的主要功能是（ ）。",[420,422,424,426],{"key":20,"text":421,"correct":26},"抗压",{"key":24,"text":423,"correct":26},"抗冲",{"key":28,"text":425,"correct":26},"抗拉",{"key":31,"text":427,"correct":22},"抗渗",{"id":429,"libraryId":5,"type":15,"typeLabel":16,"stem":430,"options":431,"answer":28,"analysis":33},1150080,"（2017年）拌和系统生产能力为2万m3\u002F月的混凝土拌合系统，其规模属于（ ）。",[432,434,436,438],{"key":20,"text":433,"correct":26},"大（1型）",{"key":24,"text":435,"correct":26},"大（2型）",{"key":28,"text":437,"correct":22},"中型",{"key":31,"text":439,"correct":26},"小型",{"id":441,"libraryId":5,"type":15,"typeLabel":16,"stem":442,"options":443,"answer":28,"analysis":33},1150081,"（2017年）生产能力为2万m3\u002F月的混凝土拌合系统，其规模属于（ ）。",[444,446,448,449],{"key":20,"text":445,"correct":26},"大（1）型",{"key":24,"text":447,"correct":26},"大（2）型",{"key":28,"text":437,"correct":22},{"key":31,"text":439,"correct":26},{"id":451,"libraryId":5,"type":15,"typeLabel":16,"stem":452,"options":453,"answer":28,"analysis":33},1150082,"（2015年）按生产规模划分，生产能力为150m3\u002Fh的混凝土拌合系统，属于（ ）拌合设备。",[454,455,456,457],{"key":20,"text":445,"correct":26},{"key":24,"text":447,"correct":26},{"key":28,"text":437,"correct":22},{"key":31,"text":439,"correct":26},{"id":459,"libraryId":5,"type":15,"typeLabel":16,"stem":460,"options":461,"answer":20,"analysis":33},1150083,"（2012年）混凝土拌合机的主要性能指标是（ ）。",[462,464,466,468],{"key":20,"text":463,"correct":22},"工作容量",{"key":24,"text":465,"correct":26},"设备功率",{"key":28,"text":467,"correct":26},"生产能力",{"key":31,"text":469,"correct":26},"生产效率",{"id":471,"libraryId":5,"type":15,"typeLabel":16,"stem":472,"options":473,"answer":24,"analysis":33},1150084,"（2011年）某水闸底板混凝土采用平浇法施工，最大混凝土块浇筑面积400㎡，浇筑层厚40cm，混凝土初凝时间按3h计，混凝土从出机口到浇筑入仓历时30min。则该工程拌合站小时生产能力最小应为（ ）m3\u002Fh。",[474,476,478,480],{"key":20,"text":475,"correct":26},"64",{"key":24,"text":477,"correct":22},"70.4",{"key":28,"text":479,"correct":26},"320",{"key":31,"text":481,"correct":26},"352",{"id":483,"libraryId":5,"type":15,"typeLabel":16,"stem":484,"options":485,"answer":31,"analysis":33},1150085,"（2011年）根据《水工混凝土施工规范》（DL\u002FT5144—2001），混凝土养护时间不宜少于（ ）d。",[486,487,489,491],{"key":20,"text":258,"correct":26},{"key":24,"text":488,"correct":26},"14",{"key":28,"text":490,"correct":26},"21",{"key":31,"text":492,"correct":22},"28",{"id":494,"libraryId":5,"type":15,"typeLabel":16,"stem":495,"options":496,"answer":24,"analysis":33},1150086,"（2018年真题）根据《水利水电工程施工组织设计规范》（SL303-2017），生产能力为75m3\u002Fh拌合系统规模为（）。",[497,499,500,502],{"key":20,"text":498,"correct":26},"大型",{"key":24,"text":437,"correct":22},{"key":28,"text":501,"correct":26},"小（1）型",{"key":31,"text":503,"correct":26},"小（2）型",{"id":505,"libraryId":5,"type":15,"typeLabel":16,"stem":506,"options":507,"answer":31,"analysis":33},1150087,"（2017年）钢筋标注形式nΦd@s”中，s示钢筋（ )",[508,510,512,514],{"key":20,"text":509,"correct":26},"根数",{"key":24,"text":511,"correct":26},"等级",{"key":28,"text":513,"correct":26},"直径",{"key":31,"text":515,"correct":22},"间距",{"id":517,"libraryId":5,"type":15,"typeLabel":16,"stem":518,"options":519,"answer":31,"analysis":33},1150088,"(2009年)混凝土重力坝浇筑块成型后的偏差，不应超模板安装允许偏差的（）",[520,522,524,526],{"key":20,"text":521,"correct":26},"20%～30%",{"key":24,"text":523,"correct":26},"30%～40%",{"key":28,"text":525,"correct":26},"40%～50%",{"key":31,"text":527,"correct":22},"50%～100%",{"id":529,"libraryId":5,"type":15,"typeLabel":16,"stem":530,"options":531,"answer":24,"analysis":33},1150089,"(2010年)下列受弯构件的钢筋接头方式中，同一截面钢筋接头面积占受力钢筋总面积的百分率不符合规范规定的是( )。",[532,534,536,538],{"key":20,"text":533,"correct":26},"闪光对焊，受拉区42%",{"key":24,"text":535,"correct":22},"绑扎，受拉区40%",{"key":28,"text":537,"correct":26},"绑扎，受压区45%",{"key":31,"text":539,"correct":26},"机械连接，受拉区38%",{"id":541,"libraryId":5,"type":15,"typeLabel":16,"stem":542,"options":543,"answer":31,"analysis":33},1150090,"（2018年真题）在加工场加工钢筋接头时，一般应采用（）。",[544,546,548,550],{"key":20,"text":545,"correct":26},"绑扎连接",{"key":24,"text":547,"correct":26},"气压焊连接",{"key":28,"text":549,"correct":26},"接触点焊接",{"key":31,"text":551,"correct":22},"闪光对焊连接",{"id":553,"libraryId":5,"type":15,"typeLabel":16,"stem":554,"options":555,"answer":20,"analysis":33},1150091,"（2019年真题）钢筋在调直机上调直后，其表面伤痕不得使钢筋截面面积减少()%以上。",[556,557,558,559],{"key":20,"text":255,"correct":22},{"key":24,"text":233,"correct":26},{"key":28,"text":258,"correct":26},{"key":31,"text":235,"correct":26},{"id":561,"libraryId":5,"type":15,"typeLabel":16,"stem":562,"options":563,"answer":24,"analysis":33},1150092,"（2017年）混凝土坝的施工质量检测方法中，属于物理监测的是（ ）。",[564,566,568,570],{"key":20,"text":565,"correct":26},"钻孔压水试验",{"key":24,"text":567,"correct":22},"采用红外线检测弹模",{"key":28,"text":569,"correct":26},"钻孔灌桩试验",{"key":31,"text":571,"correct":26},"在混凝土浇筑中埋设测缝计监测裂缝",{"id":573,"libraryId":5,"type":15,"typeLabel":16,"stem":574,"options":575,"answer":31,"analysis":33},1150093,"（2012年）如下图所示，混凝土重力坝分缝分块属于（ ）分块。",[576,578,580,582],{"key":20,"text":577,"correct":26},"通仓",{"key":24,"text":579,"correct":26},"竖缝",{"key":28,"text":581,"correct":26},"平缝",{"key":31,"text":583,"correct":22},"错缝",[585,588,591,594,597,600],{"id":15,"name":586,"category":7,"favorite":587},"领导干部任职前廉政法规知识测试题",92,{"id":589,"name":590,"category":7,"favorite":15},595,"建筑结构与设备",{"id":592,"name":593,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":595,"name":596,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":598,"name":599,"category":7,"favorite":8},534,"BIM工程师",{"id":601,"name":599,"category":7,"favorite":8},535]