[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-803-18":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":602},{"id":5,"name":6,"category":7,"favorite":8},803,"一建水利水电工程实务","建筑工程",0,18,50,1981,[13,34,46,58,70,82,94,103,115,127,139,151,163,175,187,199,211,223,235,245,257,269,281,293,305,317,328,340,352,363,374,386,398,408,419,431,443,453,465,477,489,501,509,521,530,542,554,566,578,590],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},1150864,1,"单选题","竣工财务决算基准日宜确定为（ ）",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","月初",false,{"key":24,"text":25,"correct":22},"B","财政支付日",{"key":27,"text":28,"correct":22},"C","合同支付日",{"key":30,"text":31,"correct":32},"D","月末",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":30,"analysis":33},1150865,"下列不是竣工决算审计内容的是（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"建设管理体制审计",{"key":24,"text":41,"correct":22},"预留费用审计",{"key":27,"text":43,"correct":22},"建设监理审计",{"key":30,"text":45,"correct":32},"投标单位合法性审计",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},1150866,"下列关于水利工程基本建设项目审计的说法，正确的是（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"开工审计必须在项目主体工程开工前进行",{"key":24,"text":53,"correct":32},"建设期间审计可根据项目性质、规模和建设管理的需要进行",{"key":27,"text":55,"correct":22},"竣工决算审计必须在项目正式竣工验收之后进行",{"key":30,"text":57,"correct":22},"竣工决算审计结论应直接下达项目所属人民政府，由其转至项目法人",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":30,"analysis":33},1150867,"竣工决算审计是对项目竣工决算的真实性、合法性和（ ）进行的评价。",[62,64,66,68],{"key":20,"text":63,"correct":22},"规范性",{"key":24,"text":65,"correct":22},"程序性",{"key":27,"text":67,"correct":22},"时效性",{"key":30,"text":69,"correct":32},"效益性",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":20,"analysis":33},1150868,"竣工决算财务报表之间的逻辑关系是（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":32},"勾稽关系",{"key":24,"text":77,"correct":22},"平衡关系",{"key":27,"text":79,"correct":22},"相符性关系",{"key":30,"text":81,"correct":22},"递延关系",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":30,"analysis":33},1150869,"项目法人和相关单位应在收到审计结论（ ）个工作日内执行完毕，并向水利审计部门报送审计整改报告。",[86,88,90,92],{"key":20,"text":87,"correct":22},"10",{"key":24,"text":89,"correct":22},"30",{"key":27,"text":91,"correct":22},"40",{"key":30,"text":93,"correct":32},"60",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":30,"analysis":33},1150870,"收到审计决定后，整改工作应当在（ ）个工作日内完成。",[98,99,100,102],{"key":20,"text":89,"correct":22},{"key":24,"text":91,"correct":22},{"key":27,"text":101,"correct":22},"50",{"key":30,"text":93,"correct":32},{"id":104,"libraryId":5,"type":15,"typeLabel":16,"stem":105,"options":106,"answer":20,"analysis":33},1150871,"下列关于水利水电工程施工分包的说法，正确的是（ ）。",[107,109,111,113],{"key":20,"text":108,"correct":32},"建筑工程主体结构的施工必须由总承包单位自行完成",{"key":24,"text":110,"correct":22},"分包单位可以将其承包的工程分包给具有相应资质条件的单位",{"key":27,"text":112,"correct":22},"除指定分包外，分包工程量一般不超过承包合同总额的40%",{"key":30,"text":114,"correct":22},"施工总承包单位可以将承包工程中的任一分部工程发包给分包单位",{"id":116,"libraryId":5,"type":15,"typeLabel":16,"stem":117,"options":118,"answer":30,"analysis":33},1150872,"下列不属于承包单位分包管理职责的是（ ）。",[119,121,123,125],{"key":20,"text":120,"correct":22},"审查分包单位资质",{"key":24,"text":122,"correct":22},"对分包单位的再次分包负责",{"key":27,"text":124,"correct":22},"管理分包工程进度和质量",{"key":30,"text":126,"correct":32},"协调项目法人与分包单位签订合同",{"id":128,"libraryId":5,"type":15,"typeLabel":16,"stem":129,"options":130,"answer":20,"analysis":33},1150873,"根据《水利建设工程施工分包管理规定》（水建管[2005]304号），分包合同必须遵循（ ）合同中的技术、经济条款。",[131,133,135,137],{"key":20,"text":132,"correct":32},"承包合同的各项原则，满足承包",{"key":24,"text":134,"correct":22},"承包合同的各项原则，满足分包",{"key":27,"text":136,"correct":22},"分包合同的各项原则，满足分包",{"key":30,"text":138,"correct":22},"分包合同的各项原则，满足承包",{"id":140,"libraryId":5,"type":15,"typeLabel":16,"stem":141,"options":142,"answer":30,"analysis":33},1150874,"根据《水利建设工程施工分包管理规定》（水建管[2005]304号），工程分包是指承包单位将中标的部分工程（ ）施工，但仍承担与项目法人所签合同确定的责任和义务。",[143,145,147,149],{"key":20,"text":144,"correct":22},"交由下属施工队伍",{"key":24,"text":146,"correct":22},"交由雇佣劳工",{"key":27,"text":148,"correct":22},"转让给另外的施工单位",{"key":30,"text":150,"correct":32},"交由另外的施工单位",{"id":152,"libraryId":5,"type":15,"typeLabel":16,"stem":153,"options":154,"answer":27,"analysis":33},1150875,"根据水利部《水利工程施工转包违法分包等违法行为认定管理暂行办法》（水建管[2016]420号），承包人未设立现场管理机构的情形属于（ ）。",[155,157,159,161],{"key":20,"text":156,"correct":22},"违法分包",{"key":24,"text":158,"correct":22},"出借借用资质",{"key":27,"text":160,"correct":32},"转包",{"key":30,"text":162,"correct":22},"允许他人以本单位名义承揽工程",{"id":164,"libraryId":5,"type":15,"typeLabel":16,"stem":165,"options":166,"answer":30,"analysis":33},1150876,"下列关于项目法人推荐分包人的说法，错误的是（ ）。",[167,169,171,173],{"key":20,"text":168,"correct":22},"由于重大设计变更导致施工方案重大变化，致使承包人不具备相应的施工能力时，项目法人可以推荐分包人",{"key":24,"text":170,"correct":22},"由于承包人原因，导致施工工期拖延，承包人无力在合同规定的期限内完成合同任务时，项目法人可以推荐分包人",{"key":27,"text":172,"correct":22},"如承包人同意项目法人推荐分包人，则应由承包人与分包人签订分包合同，并对该推荐分包人的行为负全部责任",{"key":30,"text":174,"correct":32},"如承包人拒绝项目法人推荐分包人，则可由由承包人自行选择分包人，但需经质量监督单位书面认可",{"id":176,"libraryId":5,"type":15,"typeLabel":16,"stem":177,"options":178,"answer":27,"analysis":33},1150877,"下列不属于项目法人分包管理职责的是（ ）。",[179,181,183,185],{"key":20,"text":180,"correct":22},"审核分包内容",{"key":24,"text":182,"correct":22},"审核分包单位资质",{"key":27,"text":184,"correct":32},"指定分包商",{"key":30,"text":186,"correct":22},"监督检查分包合同实施，防止再次分包",{"id":188,"libraryId":5,"type":15,"typeLabel":16,"stem":189,"options":190,"answer":30,"analysis":33},1150878,"关于项目法人指定分包，违反规定的说法是（ ）。",[191,193,195,197],{"key":20,"text":192,"correct":22},"特殊情况下（如应急防汛等），项目法人可直接指定分包人",{"key":24,"text":194,"correct":22},"因非承包人原因形成指定分包条件的，项目法人的指定分包不得增加承包人的额外费用",{"key":27,"text":196,"correct":22},"因承包人原因形成指定分包条件的，承包人应负责因指定分包增加的相应费用",{"key":30,"text":198,"correct":32},"指定分包时，不得增加承包单位的额外费用",{"id":200,"libraryId":5,"type":15,"typeLabel":16,"stem":201,"options":202,"answer":24,"analysis":33},1150879,"在合同实施过程中，项目法人可向承包人推荐分包人的条件是（ ）。",[203,205,207,209],{"key":20,"text":204,"correct":22},"由于承包人原因，导致某分部工程施工质量不满足合同要求",{"key":24,"text":206,"correct":32},"由于承包人原因导致工期拖延，承包人无力在合同规定期限内完成合同任务",{"key":27,"text":208,"correct":22},"由于重大设计变更导致施工方案重大变化，承包人要求增加投资的",{"key":30,"text":210,"correct":22},"由于施工总承包单位更换的项目经理不称职",{"id":212,"libraryId":5,"type":15,"typeLabel":16,"stem":213,"options":214,"answer":24,"analysis":33},1150880,"（ ）要对承包人和分包人签订的分包合同的实施情况进行监督检查。",[215,217,219,221],{"key":20,"text":216,"correct":22},"施工员",{"key":24,"text":218,"correct":32},"发包人或其委托的监理单位",{"key":27,"text":220,"correct":22},"技术员",{"key":30,"text":222,"correct":22},"安全员",{"id":224,"libraryId":5,"type":15,"typeLabel":16,"stem":225,"options":226,"answer":24,"analysis":33},1150881,"由指定分包单位造成的与其分包工作有关的一切索赔、诉讼和损失赔偿由指定分包单位直接对（ ）负责。",[227,229,231,233],{"key":20,"text":228,"correct":22},"承包单位",{"key":24,"text":230,"correct":32},"项目法人",{"key":27,"text":232,"correct":22},"质量监督机构",{"key":30,"text":234,"correct":22},"其他分包商",{"id":236,"libraryId":5,"type":15,"typeLabel":16,"stem":237,"options":238,"answer":30,"analysis":33},1150882,"分包单位必须对其分包工程的施工质量向（ ）负责。",[239,240,241,243],{"key":20,"text":232,"correct":22},{"key":24,"text":230,"correct":22},{"key":27,"text":242,"correct":22},"监理单位",{"key":30,"text":244,"correct":32},"总包单位",{"id":246,"libraryId":5,"type":15,"typeLabel":16,"stem":247,"options":248,"answer":20,"analysis":33},1150883,"根据水利工程施工项目招标投标有关规定，资格预审是指在（ ）对潜在投标人进行的资格审查。",[249,251,253,255],{"key":20,"text":250,"correct":32},"投标前",{"key":24,"text":252,"correct":22},"开标期间",{"key":27,"text":254,"correct":22},"评标期间",{"key":30,"text":256,"correct":22},"合同谈判时",{"id":258,"libraryId":5,"type":15,"typeLabel":16,"stem":259,"options":260,"answer":20,"analysis":33},1150884,"根据水利工程施工项目招标投标有关规定，招标人可以对潜在投标人或者投标人进行资格审查，资格审查分为（ ）。",[261,263,265,267],{"key":20,"text":262,"correct":32},"资格预审和资格后审",{"key":24,"text":264,"correct":22},"资格预审和初步评审",{"key":27,"text":266,"correct":22},"资格预审和详细评审",{"key":30,"text":268,"correct":22},"初步评审和详细评审",{"id":270,"libraryId":5,"type":15,"typeLabel":16,"stem":271,"options":272,"answer":27,"analysis":33},1150885,"水利工程施工项目招标中，一般可以不组织的程序有（ ）。",[273,275,277,279],{"key":20,"text":274,"correct":22},"成立评标委员会",{"key":24,"text":276,"correct":22},"招标前备案",{"key":27,"text":278,"correct":32},"资格预审",{"key":30,"text":280,"correct":22},"向未中标人发中标结果通知书",{"id":282,"libraryId":5,"type":15,"typeLabel":16,"stem":283,"options":284,"answer":20,"analysis":33},1150886,"根据《水利水电工程标准施工招标资格预审文件》（2009年版），资格预审方法应当在（ ）中载明。",[285,287,289,291],{"key":20,"text":286,"correct":32},"资格预审公告",{"key":24,"text":288,"correct":22},"申请人须知",{"key":27,"text":290,"correct":22},"资格审查办法",{"key":30,"text":292,"correct":22},"资格预审申请文件格式",{"id":294,"libraryId":5,"type":15,"typeLabel":16,"stem":295,"options":296,"answer":27,"analysis":33},1150887,"下列关于标底和最高投标限价的说法，错误的是（ ）。",[297,299,301,303],{"key":20,"text":298,"correct":22},"一个招标项目只能有一个标底",{"key":24,"text":300,"correct":22},"招标项目设有标底的，招标人应当在开标时公布",{"key":27,"text":302,"correct":32},"招标人可以规定最低投标限价",{"key":30,"text":304,"correct":22},"招标人可以规定最高投标限价",{"id":306,"libraryId":5,"type":15,"typeLabel":16,"stem":307,"options":308,"answer":24,"analysis":33},1150888,"采用邀请招标方式的，招标人至少应当向（ ）个以上有投标资格的法人或其他组织发出投标邀请书。",[309,311,313,315],{"key":20,"text":310,"correct":22},"2",{"key":24,"text":312,"correct":32},"3",{"key":27,"text":314,"correct":22},"4",{"key":30,"text":316,"correct":22},"5",{"id":318,"libraryId":5,"type":15,"typeLabel":16,"stem":319,"options":320,"answer":27,"analysis":33},1150889,"依据水利工程施工招标投标有关规定，潜在投标人依据踏勘项目现场及招标人介绍情况做出的判断和决策，由（ ）负责。",[321,323,324,326],{"key":20,"text":322,"correct":22},"招标人",{"key":24,"text":230,"correct":22},{"key":27,"text":325,"correct":32},"投标人",{"key":30,"text":327,"correct":22},"监理人",{"id":329,"libraryId":5,"type":15,"typeLabel":16,"stem":330,"options":331,"answer":24,"analysis":33},1150890,"根据《水利水电工程标准施工招标文件》，关于踏勘现场，正确的说法有（ ）。",[332,334,336,338],{"key":20,"text":333,"correct":22},"招标人必须组织",{"key":24,"text":335,"correct":32},"投标人自愿参加",{"key":27,"text":337,"correct":22},"应当在投标预备会后进行",{"key":30,"text":339,"correct":22},"投标人未全部到场时不得组织",{"id":341,"libraryId":5,"type":15,"typeLabel":16,"stem":342,"options":343,"answer":27,"analysis":33},1150891,"根据水利工程施工项目招标投标有关规定，排名第一的中标候选人在规定的期限内未能提交履约保证金的，招标人（ ）。",[344,346,348,350],{"key":20,"text":345,"correct":22},"可以重招",{"key":24,"text":347,"correct":22},"可以延长履约保证金提交期限",{"key":27,"text":349,"correct":32},"可以重新评标",{"key":30,"text":351,"correct":22},"可以由招标人指定其他中标人候选人为中标人",{"id":353,"libraryId":5,"type":15,"typeLabel":16,"stem":354,"options":355,"answer":20,"analysis":33},1150892,"评标委员会推荐的中标候选人应当限定在（ ）人。",[356,358,360,361],{"key":20,"text":357,"correct":32},"1～3",{"key":24,"text":359,"correct":22},"2～4",{"key":27,"text":312,"correct":22},{"key":30,"text":362,"correct":22},"3～5",{"id":364,"libraryId":5,"type":15,"typeLabel":16,"stem":365,"options":366,"answer":30,"analysis":33},1150893,"水利工程施工项目的招标中，评标工作由（ ）负责。",[367,368,370,372],{"key":20,"text":322,"correct":22},{"key":24,"text":369,"correct":22},"评标委员会主任",{"key":27,"text":371,"correct":22},"行政监督部门",{"key":30,"text":373,"correct":32},"评标委员会",{"id":375,"libraryId":5,"type":15,"typeLabel":16,"stem":376,"options":377,"answer":20,"analysis":33},1150894,"根据《水利水电工程标准施工招标文件》，关于评标委员会下列说法正确的有（ ）。",[378,380,382,384],{"key":20,"text":379,"correct":32},"评标委员会推荐的中标候选人应当限定在1-3人，并标明排列顺序",{"key":24,"text":381,"correct":22},"招标人必须授权评标委员会直接确定中标人",{"key":27,"text":383,"correct":22},"经评标委员会评审后否决所有投标的，招标人将确定排名第二的为中标人",{"key":30,"text":385,"correct":22},"招标人必须根据评标委员会提出的书面评标报告和推荐的中标候选人确定中标人",{"id":387,"libraryId":5,"type":15,"typeLabel":16,"stem":388,"options":389,"answer":27,"analysis":33},1150895,"某水闸加固改造工程土建标共有甲、乙、丙、丁四家潜在投标人购买了资格预审文件，经审查乙、丙、丁三个投标人通过了资格预审；在规定时间内乙向招标人书面提出了在阅读招标文件和现场踏勘中的疑问，招标人确认后应在规定时间内将招标文件的答疑以书面形式发给（ ）。",[390,392,394,396],{"key":20,"text":391,"correct":22},"甲",{"key":24,"text":393,"correct":22},"乙",{"key":27,"text":395,"correct":32},"乙、丙、丁",{"key":30,"text":397,"correct":22},"甲、乙、丙、丁",{"id":399,"libraryId":5,"type":15,"typeLabel":16,"stem":400,"options":401,"answer":30,"analysis":33},1150896,"某泵站土建标共有甲、乙、丙、丁四家单位购买了招标文件，其中甲、乙、丙参加了由招标人组织的现场踏勘和标前会，现场踏勘中甲单位提出了招标文件中的疑问，招标人现场进行了答复，根据有关规定，招标人应将解答以书面方式通知（ ）。",[402,403,405,407],{"key":20,"text":391,"correct":22},{"key":24,"text":404,"correct":22},"乙、丙",{"key":27,"text":406,"correct":22},"甲、乙、丙",{"key":30,"text":397,"correct":32},{"id":409,"libraryId":5,"type":15,"typeLabel":16,"stem":410,"options":411,"answer":24,"analysis":33},1150897,"水利工程施工项目的招标中，依法必须进行招标的施工项目，自招标文件开始发出之日起至投标人提交投标文件截止之日止，最短不应当少于（ ）日。",[412,414,416,418],{"key":20,"text":413,"correct":22},"14",{"key":24,"text":415,"correct":32},"20",{"key":27,"text":417,"correct":22},"28",{"key":30,"text":89,"correct":22},{"id":420,"libraryId":5,"type":15,"typeLabel":16,"stem":421,"options":422,"answer":27,"analysis":33},1150898,"水利工程施工项目的招标中，开标时间与投标截止时间的关系是（ ）。",[423,425,427,429],{"key":20,"text":424,"correct":22},"开标时间早于投标截止时间",{"key":24,"text":426,"correct":22},"开标时间晚于投标截止时间",{"key":27,"text":428,"correct":32},"开标时间等于投标截止时间",{"key":30,"text":430,"correct":22},"没关系",{"id":432,"libraryId":5,"type":15,"typeLabel":16,"stem":433,"options":434,"answer":30,"analysis":33},1150899,"国有资金占控股或者主导地位的依法必须进行招标的项目，下列关于确定中标人的规定错误的是（ ）。",[435,437,439,441],{"key":20,"text":436,"correct":22},"招标人应当确定排名第一的中标候选人为中标人",{"key":24,"text":438,"correct":22},"排名第一的中标候选人放弃中标，招标人可以重新招标",{"key":27,"text":440,"correct":22},"当招标人确定的中标人与评标委员会推荐的中标候选人顺序不一致时，应按项目管理权限报水行政主管部门备案",{"key":30,"text":442,"correct":32},"在确定中标人之前，招标人应与投标人就投标价格、投标方案等实质性内容进行谈判",{"id":444,"libraryId":5,"type":15,"typeLabel":16,"stem":445,"options":446,"answer":27,"analysis":33},1150900,"根据《建筑业企业资质标准》的规定，水利水电工程施工总承包企业资质等级为三级，则需要水利水电工程专业一级注册建造师为（ ）人。",[447,448,449,451],{"key":20,"text":312,"correct":22},{"key":24,"text":316,"correct":22},{"key":27,"text":450,"correct":32},"8",{"key":30,"text":452,"correct":22},"无数量要求",{"id":454,"libraryId":5,"type":15,"typeLabel":16,"stem":455,"options":456,"answer":27,"analysis":33},1150901,"根据《建筑业企业资质标准》（建市[2014]159号），水利水电工程施工总承包企业资质等级分为（ ）。",[457,459,461,463],{"key":20,"text":458,"correct":22},"甲级、乙级、丙级",{"key":24,"text":460,"correct":22},"一级、二级、三级",{"key":27,"text":462,"correct":32},"特级、一级、二级、三级",{"key":30,"text":464,"correct":22},"特级、甲级、乙级、丙级",{"id":466,"libraryId":5,"type":15,"typeLabel":16,"stem":467,"options":468,"answer":24,"analysis":33},1150902,"水利建设市场主体信用等级评分为85的属于（ ）。 A.AAA B.AA C.A D.BBB",[469,471,473,475],{"key":20,"text":470,"correct":22},"AA级：80分≤X＜90分。信用好；",{"key":24,"text":472,"correct":32},"A级：70分≤X＜80分，信用较好；",{"key":27,"text":474,"correct":22},"BBB级：60分≤X＜70分，信用一般；",{"key":30,"text":476,"correct":22},"CCC级：X＜60分，信用较差。）",{"id":478,"libraryId":5,"type":15,"typeLabel":16,"stem":479,"options":480,"answer":24,"analysis":33},1150903,"水利建设市场主体信用等级分为（ ）。",[481,483,485,487],{"key":20,"text":482,"correct":22},"三等四级",{"key":24,"text":484,"correct":32},"三等五级",{"key":27,"text":486,"correct":22},"五等三级",{"key":30,"text":488,"correct":22},"五等四级",{"id":490,"libraryId":5,"type":15,"typeLabel":16,"stem":491,"options":492,"answer":30,"analysis":33},1150904,"根据《建筑业企业资质标准》（建市[2014]159号），水利水电工程施工专业承包企业资质中不包括（ ）。",[493,495,497,499],{"key":20,"text":494,"correct":22},"水工金属结构制作与安装工程",{"key":24,"text":496,"correct":22},"水利水电机电安装工程",{"key":27,"text":498,"correct":22},"河湖整治工程",{"key":30,"text":500,"correct":32},"堤防工程",{"id":502,"libraryId":5,"type":15,"typeLabel":16,"stem":503,"options":504,"answer":24,"analysis":33},1150905,"根据《建筑业企业资质标准》（建市[2014]159号），水利水电工程施工专业承包企业资质等级分为（ ）。",[505,506,507,508],{"key":20,"text":458,"correct":22},{"key":24,"text":460,"correct":32},{"key":27,"text":462,"correct":22},{"key":30,"text":464,"correct":22},{"id":510,"libraryId":5,"type":15,"typeLabel":16,"stem":511,"options":512,"answer":27,"analysis":33},1150906,"水利建设市场主体信用等级为CCC的意味着（ ）。",[513,515,517,519],{"key":20,"text":514,"correct":22},"诚信",{"key":24,"text":516,"correct":22},"守信",{"key":27,"text":518,"correct":32},"失信",{"key":30,"text":520,"correct":22},"信用一般",{"id":522,"libraryId":5,"type":15,"typeLabel":16,"stem":523,"options":524,"answer":20,"analysis":33},1150907,"在最近（ ）年内有骗取中标或严重违约或重大工程质量问题的施工单位不得参与投标。",[525,526,527,528],{"key":20,"text":312,"correct":32},{"key":24,"text":314,"correct":22},{"key":27,"text":316,"correct":22},{"key":30,"text":529,"correct":22},"6",{"id":531,"libraryId":5,"type":15,"typeLabel":16,"stem":532,"options":533,"answer":24,"analysis":33},1150908,"根据《水利水电工程标准施工招标资格预审文件》（2009年版），资格预审申请文件的法定代表人或委托代理人签字要求是（ ）。",[534,536,538,540],{"key":20,"text":535,"correct":22},"正本全签",{"key":24,"text":537,"correct":32},"正本除封面、封底、目录、分隔页外全签",{"key":27,"text":539,"correct":22},"正副本全签",{"key":30,"text":541,"correct":22},"正副本除封面、封底、目录、分隔页外全签",{"id":543,"libraryId":5,"type":15,"typeLabel":16,"stem":544,"options":545,"answer":24,"analysis":33},1150909,"投标保证金一般不超过合同估算价的2%，但最高不得超过（ ）万元。",[546,548,550,552],{"key":20,"text":547,"correct":22},"70",{"key":24,"text":549,"correct":32},"80",{"key":27,"text":551,"correct":22},"90",{"key":30,"text":553,"correct":22},"100",{"id":555,"libraryId":5,"type":15,"typeLabel":16,"stem":556,"options":557,"answer":27,"analysis":33},1150910,"根据水利工程施工项目招标投标有关规定，下列关于投标文件的澄清和补正的说法，错误的是（ ）。",[558,560,562,564],{"key":20,"text":559,"correct":22},"澄清和补正不得改变投标文件的实质性内容",{"key":24,"text":561,"correct":22},"澄清和补正属于投标文件的组成部分",{"key":27,"text":563,"correct":32},"投标人在开标前可主动提出澄清说明和补正",{"key":30,"text":565,"correct":22},"澄清、说明和补正可以修正算术性错误",{"id":567,"libraryId":5,"type":15,"typeLabel":16,"stem":568,"options":569,"answer":27,"analysis":33},1150911,"投标人A参加某泵站的土建标投标，其已标价工程量清单中的一部分见下表。经评审投标人A实质上响应了招标文件的要求，但评委发现其投标报价中有计算性错误，而招标文件中对此未作规定，根据《工程建设项目施工招标投标办法》(国家八部委局第30号令)，投标人A的已标价工程量清单中的“土方开挖”、“钢筋”修正后的合价应分别为（）万元。",[570,572,574,576],{"key":20,"text":571,"correct":22},"8．95、345．5",{"key":24,"text":573,"correct":22},"8．65、345．5",{"key":27,"text":575,"correct":32},"8．65、34．55",{"key":30,"text":577,"correct":22},"8．95、34．55",{"id":579,"libraryId":5,"type":15,"typeLabel":16,"stem":580,"options":581,"answer":24,"analysis":33},1150912,"根据《水利工程建设项目招标投标管理规定》（水利部令第14号），招标人与中标人签订合同后至多（ ）内，应当退还投标保证金。",[582,584,586,588],{"key":20,"text":583,"correct":22},"5日",{"key":24,"text":585,"correct":32},"5个工作日",{"key":27,"text":587,"correct":22},"7日",{"key":30,"text":589,"correct":22},"7个工作日",{"id":591,"libraryId":5,"type":15,"typeLabel":16,"stem":592,"options":593,"answer":27,"analysis":33},1150913,"根据《水利水电工程标准施工招标文件》，合同中有如下内容：①中标通知书；②专用合同条款；③通用合同条款；④技术条款；⑤图纸；⑥已标价的工程量清单；⑦协议书。如前后不一致时，其解释顺序正确的足（ ）。",[594,596,598,600],{"key":20,"text":595,"correct":22},"⑦①②③⑥④⑤",{"key":24,"text":597,"correct":22},"⑦①③②⑥④⑤",{"key":27,"text":599,"correct":32},"⑦①②③④⑤⑥",{"key":30,"text":601,"correct":22},"⑦①③②④⑤⑥",[603,606,609,612,615,618],{"id":15,"name":604,"category":7,"favorite":605},"领导干部任职前廉政法规知识测试题",92,{"id":607,"name":608,"category":7,"favorite":15},595,"建筑结构与设备",{"id":610,"name":611,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":613,"name":614,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":616,"name":617,"category":7,"favorite":8},534,"BIM工程师",{"id":619,"name":617,"category":7,"favorite":8},535]