[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-803-17":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":582},{"id":5,"name":6,"category":7,"favorite":8},803,"一建水利水电工程实务","建筑工程",0,17,50,1981,[13,34,46,55,66,78,90,98,110,122,134,146,158,170,181,193,205,217,229,241,253,265,277,289,301,311,323,334,346,354,364,375,387,396,408,420,431,443,455,467,479,491,499,511,523,531,541,553,565,574],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},1150814,1,"单选题","为提高岩体的整体性和抗变形能力，主要采用（ ）。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","帷幕灌浆",false,{"key":24,"text":25,"correct":22},"B","接触灌浆",{"key":27,"text":28,"correct":22},"C","接缝灌浆",{"key":30,"text":31,"correct":32},"D","固结灌浆",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},1150815,"以机械旋转方法搅动地层，同时注入水泥基质浆液，在松散细颗粒地层内形成柱体的基础处理形式为（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":32},"深层搅拌桩",{"key":24,"text":41,"correct":22},"打入桩",{"key":27,"text":43,"correct":22},"灌注桩",{"key":30,"text":45,"correct":22},"旋喷桩",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":30,"analysis":33},1150816,"为增强围岩或结构的密实性，在混凝土与围岩之间应采用（ ）。",[50,51,52,53],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":22},{"key":27,"text":28,"correct":22},{"key":30,"text":54,"correct":32},"回填灌浆",{"id":56,"libraryId":5,"type":15,"typeLabel":16,"stem":57,"options":58,"answer":24,"analysis":33},1150817,"地基处理中的灌浆按其目的可分为固结灌浆、帷幕灌浆和（ ）等。",[59,61,62,64],{"key":20,"text":60,"correct":22},"压力灌浆",{"key":24,"text":25,"correct":32},{"key":27,"text":63,"correct":22},"高压喷射灌浆",{"key":30,"text":65,"correct":22},"黏土灌浆",{"id":67,"libraryId":5,"type":15,"typeLabel":16,"stem":68,"options":69,"answer":20,"analysis":33},1150818,"高压灌浆是指灌浆压力在（ ）MPa以上的灌浆。",[70,72,74,76],{"key":20,"text":71,"correct":32},"3",{"key":24,"text":73,"correct":22},"4",{"key":27,"text":75,"correct":22},"5",{"key":30,"text":77,"correct":22},"6",{"id":79,"libraryId":5,"type":15,"typeLabel":16,"stem":80,"options":81,"answer":27,"analysis":33},1150819,"灌浆泵容许工作压力应大于最大灌浆压力的（ ）倍。",[82,84,86,88],{"key":20,"text":83,"correct":22},"0.8",{"key":24,"text":85,"correct":22},"1.0",{"key":27,"text":87,"correct":32},"1.5",{"key":30,"text":89,"correct":22},"2.0",{"id":91,"libraryId":5,"type":15,"typeLabel":16,"stem":92,"options":93,"answer":30,"analysis":33},1150820,"固结灌浆孔的基岩灌浆段长大于（ ）m时，灌浆孔宜分段进行灌浆。",[94,95,96,97],{"key":20,"text":71,"correct":22},{"key":24,"text":73,"correct":22},{"key":27,"text":75,"correct":22},{"key":30,"text":77,"correct":32},{"id":99,"libraryId":5,"type":15,"typeLabel":16,"stem":100,"options":101,"answer":24,"analysis":33},1150821,"在循环式灌浆中，可以根据（ ）判断岩层吸收水泥的情况。",[102,104,106,108],{"key":20,"text":103,"correct":22},"灌浆压力的变化",{"key":24,"text":105,"correct":32},"进浆和回浆液相对密度的差值",{"key":27,"text":107,"correct":22},"浆液流动速度",{"key":30,"text":109,"correct":22},"水泥浆用量",{"id":111,"libraryId":5,"type":15,"typeLabel":16,"stem":112,"options":113,"answer":27,"analysis":33},1150822,"帷幕灌浆施工中，采用自下而上分段灌浆法时，先导孔应（ ）进行压水试验。",[114,116,118,120],{"key":20,"text":115,"correct":22},"自下而上分段",{"key":24,"text":117,"correct":22},"自下而上全段",{"key":27,"text":119,"correct":32},"自上而下分段",{"key":30,"text":121,"correct":22},"自上而下全段",{"id":123,"libraryId":5,"type":15,"typeLabel":16,"stem":124,"options":125,"answer":20,"analysis":33},1150823,"在帷幕灌浆施工中，当某一比级浆液的注入量已达300L以上或灌浆时间已达30min时，而灌浆压力和注入率均无改变或改变不显著时，应（ ）。",[126,128,130,132],{"key":20,"text":127,"correct":32},"将浓度改浓一级",{"key":24,"text":129,"correct":22},"将浓度改稀一级",{"key":27,"text":131,"correct":22},"保持浆液浓度不变，继续灌浆",{"key":30,"text":133,"correct":22},"停止灌浆，进行检查",{"id":135,"libraryId":5,"type":15,"typeLabel":16,"stem":136,"options":137,"answer":30,"analysis":33},1150824,"帷幕灌浆全孔灌浆结束后，封孔灌浆时间宜为（ ）。",[138,140,142,144],{"key":20,"text":139,"correct":22},"20min",{"key":24,"text":141,"correct":22},"30min",{"key":27,"text":143,"correct":22},"40min",{"key":30,"text":145,"correct":32},"1h",{"id":147,"libraryId":5,"type":15,"typeLabel":16,"stem":148,"options":149,"answer":30,"analysis":33},1150825,"固结灌浆段在最大设计压力下，当注入率不大于( )L\u002Fmin时，继续灌注30min，灌浆可以结束。",[150,152,154,156],{"key":20,"text":151,"correct":22},"0.4",{"key":24,"text":153,"correct":22},"0.5",{"key":27,"text":155,"correct":22},"0.6",{"key":30,"text":157,"correct":32},"1",{"id":159,"libraryId":5,"type":15,"typeLabel":16,"stem":160,"options":161,"answer":30,"analysis":33},1150826,"用压水试验检查固结灌浆质量的合格标准是：单元工程内检查孔各段的合格率应达（ ）以上，不合格孔段的透水率值不超过设计规定值的150%，且不集中。",[162,164,166,168],{"key":20,"text":163,"correct":22},"50%",{"key":24,"text":165,"correct":22},"75%",{"key":27,"text":167,"correct":22},"80%",{"key":30,"text":169,"correct":32},"85%",{"id":171,"libraryId":5,"type":15,"typeLabel":16,"stem":172,"options":173,"answer":24,"analysis":33},1150827,"帷幕灌浆段长度特殊情况下可适当缩减或加长，但不得大于（ ）m。",[174,175,177,179],{"key":20,"text":75,"correct":22},{"key":24,"text":176,"correct":32},"10",{"key":27,"text":178,"correct":22},"15",{"key":30,"text":180,"correct":22},"20",{"id":182,"libraryId":5,"type":15,"typeLabel":16,"stem":183,"options":184,"answer":27,"analysis":33},1150828,"固结灌浆采用单点法进行灌浆前应做简易压水试验，试验孔数一般不宜少于总孔数的（ ）。",[185,187,189,191],{"key":20,"text":186,"correct":22},"6%",{"key":24,"text":188,"correct":22},"7%",{"key":27,"text":190,"correct":32},"5%",{"key":30,"text":192,"correct":22},"10%",{"id":194,"libraryId":5,"type":15,"typeLabel":16,"stem":195,"options":196,"answer":30,"analysis":33},1150829,"薄防渗墙槽孔的孔斜率不应大于（ ）。",[197,199,201,203],{"key":20,"text":198,"correct":22},"2%",{"key":24,"text":200,"correct":22},"4%",{"key":27,"text":202,"correct":22},"2‰",{"key":30,"text":204,"correct":32},"4‰",{"id":206,"libraryId":5,"type":15,"typeLabel":16,"stem":207,"options":208,"answer":20,"analysis":33},1150830,"防渗墙质量检查程序应包括墙体质量检查和（ ）。",[209,211,213,215],{"key":20,"text":210,"correct":32},"工序质量检查",{"key":24,"text":212,"correct":22},"单元工程质量检查",{"key":27,"text":214,"correct":22},"分部工程质量检查",{"key":30,"text":216,"correct":22},"单位工程质量检查",{"id":218,"libraryId":5,"type":15,"typeLabel":16,"stem":219,"options":220,"answer":30,"analysis":33},1150831,"防渗墙墙体质量检查应在成墙（ ）d后进行。",[221,223,225,227],{"key":20,"text":222,"correct":22},"7",{"key":24,"text":224,"correct":22},"14",{"key":27,"text":226,"correct":22},"21",{"key":30,"text":228,"correct":32},"28",{"id":230,"libraryId":5,"type":15,"typeLabel":16,"stem":231,"options":232,"answer":30,"analysis":33},1150832,"按《水利工程建设程序管理暂行规定》的要求，水利工程建设程序的最后一个阶段为（ ）。",[233,235,237,239],{"key":20,"text":234,"correct":22},"竣工验收",{"key":24,"text":236,"correct":22},"生产准备",{"key":27,"text":238,"correct":22},"生产运行",{"key":30,"text":240,"correct":32},"项目后评价",{"id":242,"libraryId":5,"type":15,"typeLabel":16,"stem":243,"options":244,"answer":24,"analysis":33},1150833,"经过批准的可行性研究报告，在主要内容上有重要变动，应经过（ ）。",[245,247,249,251],{"key":20,"text":246,"correct":22},"上级主管机关批准",{"key":24,"text":248,"correct":32},"原批准机关复审同意",{"key":27,"text":250,"correct":22},"项目法人复审同意",{"key":30,"text":252,"correct":22},"水行政主管部门批准",{"id":254,"libraryId":5,"type":15,"typeLabel":16,"stem":255,"options":256,"answer":30,"analysis":33},1150834,"水利工程建设前期工作一般分为（ ）。",[257,259,261,263],{"key":20,"text":258,"correct":22},"可行性研究报告",{"key":24,"text":260,"correct":22},"可行性研究报告、初步设计",{"key":27,"text":262,"correct":22},"项目建议书、可行性研究报告",{"key":30,"text":264,"correct":32},"项目建议书、可行性研究报告和初步设计",{"id":266,"libraryId":5,"type":15,"typeLabel":16,"stem":267,"options":268,"answer":30,"analysis":33},1150835,"水利工程建设项目按其对社会和国民经济发展的影响分为（ ）。",[269,271,273,275],{"key":20,"text":270,"correct":22},"大型和小型",{"key":24,"text":272,"correct":22},"大型、中型和小型",{"key":27,"text":274,"correct":22},"大型和中小型",{"key":30,"text":276,"correct":32},"中央项目和地方项目",{"id":278,"libraryId":5,"type":15,"typeLabel":16,"stem":279,"options":280,"answer":30,"analysis":33},1150836,"水利工程建设项目种类按其功能和作用可分为（ ）。",[281,283,285,287],{"key":20,"text":282,"correct":22},"公益性、准公益性和投资性",{"key":24,"text":284,"correct":22},"公益性、投资性和经营性",{"key":27,"text":286,"correct":22},"公益性、经营性和准经营性",{"key":30,"text":288,"correct":32},"公益性、准公益性和经营性",{"id":290,"libraryId":5,"type":15,"typeLabel":16,"stem":291,"options":292,"answer":24,"analysis":33},1150837,"水利工程（ ）对建设项目的立项、筹资、建设、生产经营、还本付息以及资产保值增值的全过程负责，并承担投资风险",[293,295,297,299],{"key":20,"text":294,"correct":22},"建设单位",{"key":24,"text":296,"correct":32},"项目法人",{"key":27,"text":298,"correct":22},"流域机构",{"key":30,"text":300,"correct":22},"施工单位",{"id":302,"libraryId":5,"type":15,"typeLabel":16,"stem":303,"options":304,"answer":20,"analysis":33},1150838,"经过批准的初步设计报告，进行一般非重大设计变更、生产性子项目之间的调整，需要有（ ）。",[305,307,308,310],{"key":20,"text":306,"correct":32},"上级主管部门批准",{"key":24,"text":248,"correct":22},{"key":27,"text":309,"correct":22},"县级以上人民政府同意",{"key":30,"text":250,"correct":22},{"id":312,"libraryId":5,"type":15,"typeLabel":16,"stem":313,"options":314,"answer":27,"analysis":33},1150839,"初步设计概算静态总投资超过可行性研究报告相应估算静态总投资在15%以下时，应（ ）。",[315,317,319,321],{"key":20,"text":316,"correct":22},"重新编制初步设计",{"key":24,"text":318,"correct":22},"重新编制可行性研究报告",{"key":27,"text":320,"correct":32},"对工程变化内容和增加投资提出专题分析报告",{"key":30,"text":322,"correct":22},"不作处理",{"id":324,"libraryId":5,"type":15,"typeLabel":16,"stem":325,"options":326,"answer":24,"analysis":33},1150840,"初步设计概算静态总投资超过可行性研究报告相应估算静态总投资15%以上（含15%）时，必须重新编制（ ）。",[327,329,330,332],{"key":20,"text":328,"correct":22},"项目建议书",{"key":24,"text":258,"correct":32},{"key":27,"text":331,"correct":22},"初步设计报告",{"key":30,"text":333,"correct":22},"专题分析报告",{"id":335,"libraryId":5,"type":15,"typeLabel":16,"stem":336,"options":337,"answer":27,"analysis":33},1150841,"对项目的立项、勘察设计、施工、建设管理、生产（运行）等进行的评价称为（ ）。",[338,340,342,344],{"key":20,"text":339,"correct":22},"影响评价",{"key":24,"text":341,"correct":22},"经济效益评价",{"key":27,"text":343,"correct":32},"过程评价",{"key":30,"text":345,"correct":22},"建设评价",{"id":347,"libraryId":5,"type":15,"typeLabel":16,"stem":348,"options":349,"answer":30,"analysis":33},1150842,"对项目投资、国民经济效益、财务效益、技术进步和规模效益、可行性研究深度等进行的评价称为（ ）。",[350,351,352,353],{"key":20,"text":339,"correct":22},{"key":24,"text":345,"correct":22},{"key":27,"text":343,"correct":22},{"key":30,"text":341,"correct":32},{"id":355,"libraryId":5,"type":15,"typeLabel":16,"stem":356,"options":357,"answer":24,"analysis":33},1150843,"项目法人应当自工程开工之日起（ ）个工作日之内，将开工情况的书面报告报项目主管单位和上一级主管单位备案。",[358,359,360,362],{"key":20,"text":222,"correct":22},{"key":24,"text":178,"correct":32},{"key":27,"text":361,"correct":22},"30",{"key":30,"text":363,"correct":22},"60",{"id":365,"libraryId":5,"type":15,"typeLabel":16,"stem":366,"options":367,"answer":27,"analysis":33},1150844,"根据水利部《水利工程设计变更管理暂行办法》，设计变更是指自水利工程初步设计批准之日起至工程竣工验收交付使用之日止，对已批准的（ ）所进行的修改活动。",[368,369,371,373],{"key":20,"text":328,"correct":22},{"key":24,"text":370,"correct":22},"可行性研究",{"key":27,"text":372,"correct":32},"初步设计",{"key":30,"text":374,"correct":22},"施工图",{"id":376,"libraryId":5,"type":15,"typeLabel":16,"stem":377,"options":378,"answer":30,"analysis":33},1150845,"水利工程项目法人、监理、设计、施工等单位需对工程质量负直接责任的是（ ）。",[379,381,383,385],{"key":20,"text":380,"correct":22},"单位负责人",{"key":24,"text":382,"correct":22},"工程现场的项目负责人",{"key":27,"text":384,"correct":22},"工程技术负责人",{"key":30,"text":386,"correct":32},"具体工作人员",{"id":388,"libraryId":5,"type":15,"typeLabel":16,"stem":389,"options":390,"answer":27,"analysis":33},1150846,"重大设计变更文件编制的设计深度应当满足（ ）技术标准的要求。",[391,392,393,395],{"key":20,"text":328,"correct":22},{"key":24,"text":370,"correct":22},{"key":27,"text":394,"correct":32},"初步设计阶段",{"key":30,"text":374,"correct":22},{"id":397,"libraryId":5,"type":15,"typeLabel":16,"stem":398,"options":399,"answer":24,"analysis":33},1150847,"建设项目管理三项制度指（ ）。",[400,402,404,406],{"key":20,"text":401,"correct":22},"项目法人制、合同管理制、招标投标制",{"key":24,"text":403,"correct":32},"项目法人制、建设监理制、招标投标制",{"key":27,"text":405,"correct":22},"项目法人制、合同管理制、建设监理制",{"key":30,"text":407,"correct":22},"建设监理制，招标投标制、合同管理制",{"id":409,"libraryId":5,"type":15,"typeLabel":16,"stem":410,"options":411,"answer":24,"analysis":33},1150848,"建设项目实行的“三项制度”不包括（ ）。",[412,414,416,418],{"key":20,"text":413,"correct":22},"项目法人责任制",{"key":24,"text":415,"correct":32},"合同制",{"key":27,"text":417,"correct":22},"招标投标制",{"key":30,"text":419,"correct":22},"建设监理制",{"id":421,"libraryId":5,"type":15,"typeLabel":16,"stem":422,"options":423,"answer":20,"analysis":33},1150849,"对水利项目稽查发现的问题，落实整改工作由（ ）组织。",[424,425,427,429],{"key":20,"text":296,"correct":32},{"key":24,"text":426,"correct":22},"出现问题的单位",{"key":27,"text":428,"correct":22},"项目主管部门",{"key":30,"text":430,"correct":22},"省级水行政主管部门",{"id":432,"libraryId":5,"type":15,"typeLabel":16,"stem":433,"options":434,"answer":20,"analysis":33},1150850,"根据《水利工程建设项目招标投标管理规定》（水利部令第14号），投标人少于（ ）的，招标人应当依照规定重新招标。",[435,437,439,441],{"key":20,"text":436,"correct":32},"3个",{"key":24,"text":438,"correct":22},"4个",{"key":27,"text":440,"correct":22},"5个",{"key":30,"text":442,"correct":22},"6个",{"id":444,"libraryId":5,"type":15,"typeLabel":16,"stem":445,"options":446,"answer":20,"analysis":33},1150851,"下列水利施工项目可不招标的是（ ）。",[447,449,451,453],{"key":20,"text":448,"correct":32},"应急度汛项目",{"key":24,"text":450,"correct":22},"国家水利项目",{"key":27,"text":452,"correct":22},"地方重点水利项目",{"key":30,"text":454,"correct":22},"施工单项合同估算价高于200万元人民币的项目",{"id":456,"libraryId":5,"type":15,"typeLabel":16,"stem":457,"options":458,"answer":30,"analysis":33},1150852,"水利工程施工项目招标分为（ ）。",[459,461,463,465],{"key":20,"text":460,"correct":22},"公开招标、邀请招标和议标",{"key":24,"text":462,"correct":22},"公开招标和议标",{"key":27,"text":464,"correct":22},"邀请招标和议标",{"key":30,"text":466,"correct":32},"公开招标和邀请招标",{"id":468,"libraryId":5,"type":15,"typeLabel":16,"stem":469,"options":470,"answer":20,"analysis":33},1150853,"根据水利工程施工项目招标投标有关规定，评标时所依据的评标标准和方法是（ ）。",[471,473,475,477],{"key":20,"text":472,"correct":32},"招标文件中已载明的",{"key":24,"text":474,"correct":22},"评委现场制定的",{"key":27,"text":476,"correct":22},"招标人会同评委在预备会上讨论通过的",{"key":30,"text":478,"correct":22},"招标人会同投标人商定的",{"id":480,"libraryId":5,"type":15,"typeLabel":16,"stem":481,"options":482,"answer":20,"analysis":33},1150854,"监理单位与业主（项目法人）的关系是（ ）。",[483,485,487,489],{"key":20,"text":484,"correct":32},"合同委托与被委托的关系",{"key":24,"text":486,"correct":22},"协作、配合的关系",{"key":27,"text":488,"correct":22},"监理与被监理的关系",{"key":30,"text":490,"correct":22},"无任何关系",{"id":492,"libraryId":5,"type":15,"typeLabel":16,"stem":493,"options":494,"answer":24,"analysis":33},1150855,"水闸首次安全鉴定应在竣工验收后5年内进行，以后应每隔（ ）年进行一次全面安全鉴定。",[495,496,497,498],{"key":20,"text":75,"correct":22},{"key":24,"text":176,"correct":32},{"key":27,"text":178,"correct":22},{"key":30,"text":180,"correct":22},{"id":500,"libraryId":5,"type":15,"typeLabel":16,"stem":501,"options":502,"answer":24,"analysis":33},1150856,"水库建设工程（包括新建、续建、改建、加固、修复等）在水库蓄水验收前，必须进行蓄水安全鉴定（ ）",[503,505,507,509],{"key":20,"text":504,"correct":22},"蓄水条件验收",{"key":24,"text":506,"correct":32},"蓄水安全",{"key":27,"text":508,"correct":22},"蓄水水位核查",{"key":30,"text":510,"correct":22},"安全水位核查",{"id":512,"libraryId":5,"type":15,"typeLabel":16,"stem":513,"options":514,"answer":27,"analysis":33},1150857,"水利建设项目稽察是建设项目的（ ）活动。",[515,517,519,521],{"key":20,"text":516,"correct":22},"审计",{"key":24,"text":518,"correct":22},"政府监督",{"key":27,"text":520,"correct":32},"监督检查",{"key":30,"text":522,"correct":22},"社会检查",{"id":524,"libraryId":5,"type":15,"typeLabel":16,"stem":525,"options":526,"answer":20,"analysis":33},1150858,"稽查报告应在现场稽查工作结束（ ）个工作日内提交。",[527,528,529,530],{"key":20,"text":75,"correct":32},{"key":24,"text":222,"correct":22},{"key":27,"text":176,"correct":22},{"key":30,"text":224,"correct":22},{"id":532,"libraryId":5,"type":15,"typeLabel":16,"stem":533,"options":534,"answer":30,"analysis":33},1150859,"竣工财务决算应由（ ）编制。",[535,537,539,540],{"key":20,"text":536,"correct":22},"设计单位",{"key":24,"text":538,"correct":22},"监理单位",{"key":27,"text":300,"correct":22},{"key":30,"text":296,"correct":32},{"id":542,"libraryId":5,"type":15,"typeLabel":16,"stem":543,"options":544,"answer":27,"analysis":33},1150860,"竣工决算应包括项目（ ）的全部费用。",[545,547,549,551],{"key":20,"text":546,"correct":22},"从施工到竣工验收",{"key":24,"text":548,"correct":22},"从主体工程施工到竣工验收",{"key":27,"text":550,"correct":32},"从筹建到竣工验收",{"key":30,"text":552,"correct":22},"从筹建到试运行",{"id":554,"libraryId":5,"type":15,"typeLabel":16,"stem":555,"options":556,"answer":30,"analysis":33},1150861,"水利基本建设项目资产形成、资产移交和投资核销的依据是（ ）。",[557,559,561,563],{"key":20,"text":558,"correct":22},"设计概算",{"key":24,"text":560,"correct":22},"工程预算",{"key":27,"text":562,"correct":22},"竣工决算",{"key":30,"text":564,"correct":32},"竣工财务决算",{"id":566,"libraryId":5,"type":15,"typeLabel":16,"stem":567,"options":568,"answer":24,"analysis":33},1150862,"建设项目未完工程投资及预留费用可预计纳入竣工财务决算。大中型项目应控制在总概算的（ ）以内。",[569,570,572,573],{"key":20,"text":198,"correct":22},{"key":24,"text":571,"correct":32},"3%",{"key":27,"text":190,"correct":22},{"key":30,"text":192,"correct":22},{"id":575,"libraryId":5,"type":15,"typeLabel":16,"stem":576,"options":577,"answer":27,"analysis":33},1150863,"竣工决算时，小型建设项目未完工程投资及预留费用应控制在（ ）以内。",[578,579,580,581],{"key":20,"text":571,"correct":22},{"key":24,"text":200,"correct":22},{"key":27,"text":190,"correct":32},{"key":30,"text":186,"correct":22},[583,586,589,592,595,598],{"id":15,"name":584,"category":7,"favorite":585},"领导干部任职前廉政法规知识测试题",92,{"id":587,"name":588,"category":7,"favorite":15},595,"建筑结构与设备",{"id":590,"name":591,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":593,"name":594,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":596,"name":597,"category":7,"favorite":8},534,"BIM工程师",{"id":599,"name":597,"category":7,"favorite":8},535]