[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-803-15":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":579},{"id":5,"name":6,"category":7,"favorite":8},803,"一建水利水电工程实务","建筑工程",0,15,50,1981,[13,34,46,58,70,82,94,106,118,129,141,149,157,169,181,189,201,213,225,233,245,257,269,281,293,305,317,329,340,352,364,376,386,398,410,422,434,446,458,467,479,487,495,503,515,527,535,547,559,567],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":33},1150711,1,"单选题","热轧带肋钢筋牌号HRB400中，400表示（ ）。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","屈服点",true,{"key":24,"text":25,"correct":26},"B","抗压强度",false,{"key":28,"text":29,"correct":26},"C","抗拉强度",{"key":31,"text":32,"correct":26},"D","极限强度","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":28,"analysis":33},1150712,"水工钢筋混凝土常用的钢筋为（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":26},"冷轧带肋钢筋",{"key":24,"text":41,"correct":26},"冷拉钢筋",{"key":28,"text":43,"correct":22},"热轧钢筋",{"key":31,"text":45,"correct":26},"热处理钢筋",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":31,"analysis":33},1150713,"用同钢号某直径钢筋代替另一种直径的钢筋时，变更后钢筋总截面面积与设计文件规定的截面面积之比为（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":26},"95%～106%",{"key":24,"text":53,"correct":26},"96%～105%",{"key":28,"text":55,"correct":26},"97%～104%",{"key":31,"text":57,"correct":22},"98%～103%",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":28,"analysis":33},1150714,"钢筋接头配置在同一截面的允许百分率，焊接接头在受弯构件的受拉区不超过（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":26},"30%",{"key":24,"text":65,"correct":26},"40%",{"key":28,"text":67,"correct":22},"50%",{"key":31,"text":69,"correct":26},"80%",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":24,"analysis":33},1150715,"混凝土重力坝和拱坝的横缝分别为（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":26},"永久缝、永久缝",{"key":24,"text":77,"correct":22},"永久缝、临时缝",{"key":28,"text":79,"correct":26},"临时缝、永久缝",{"key":31,"text":81,"correct":26},"临时缝、临时缝",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":28,"analysis":33},1150716,"为改善传力条件增强坝体整体性，主要采用（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":26},"帷幕灌浆",{"key":24,"text":89,"correct":26},"接触灌浆",{"key":28,"text":91,"correct":22},"接缝灌浆",{"key":31,"text":93,"correct":26},"固结灌浆",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":20,"analysis":33},1150717,"在施工中混凝土块体大小必须与混凝土制备、运输和浇筑的生产能力相适应，主要是为了避免（ ）出现。",[98,100,102,104],{"key":20,"text":99,"correct":22},"冷缝",{"key":24,"text":101,"correct":26},"水平缝",{"key":28,"text":103,"correct":26},"临时缝",{"key":31,"text":105,"correct":26},"错缝",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":28,"analysis":33},1150718,"斜缝分块的坝段混凝土浇筑时应有先后程序，必须是（ ）。",[110,112,114,116],{"key":20,"text":111,"correct":26},"同时浇筑",{"key":24,"text":113,"correct":26},"下游块先浇，上游块后浇",{"key":28,"text":115,"correct":22},"上游块先浇，下游块后浇",{"key":31,"text":117,"correct":26},"无所谓",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":24,"analysis":33},1150719,"为保持坝体的整体稳定性，必须对接缝进行灌浆或设置宽缝回填膨胀混凝土的分缝是（ ）。",[122,124,126,128],{"key":20,"text":123,"correct":26},"横缝",{"key":24,"text":125,"correct":22},"纵缝",{"key":28,"text":127,"correct":26},"斜缝",{"key":31,"text":105,"correct":26},{"id":130,"libraryId":5,"type":15,"typeLabel":16,"stem":131,"options":132,"answer":28,"analysis":33},1150720,"混凝土坝采用竖缝分块时，浇块高度一般在（ ）m以内。",[133,135,137,139],{"key":20,"text":134,"correct":26},"1",{"key":24,"text":136,"correct":26},"2",{"key":28,"text":138,"correct":22},"3",{"key":31,"text":140,"correct":26},"4",{"id":142,"libraryId":5,"type":15,"typeLabel":16,"stem":143,"options":144,"answer":31,"analysis":33},1150721,"垂直于坝轴线方向的缝称为（ ）。",[145,146,147,148],{"key":20,"text":125,"correct":26},{"key":24,"text":127,"correct":26},{"key":28,"text":105,"correct":26},{"key":31,"text":123,"correct":22},{"id":150,"libraryId":5,"type":15,"typeLabel":16,"stem":151,"options":152,"answer":20,"analysis":33},1150722,"平行于坝轴线方向的缝称为（ ）。",[153,154,155,156],{"key":20,"text":125,"correct":22},{"key":24,"text":127,"correct":26},{"key":28,"text":105,"correct":26},{"key":31,"text":123,"correct":26},{"id":158,"libraryId":5,"type":15,"typeLabel":16,"stem":159,"options":160,"answer":20,"analysis":33},1150723,"整个坝段不设纵缝，以一个坝段进行浇筑的是（ ）。",[161,163,165,167],{"key":20,"text":162,"correct":22},"通仓浇筑",{"key":24,"text":164,"correct":26},"平浇法",{"key":28,"text":166,"correct":26},"薄层浇筑",{"key":31,"text":168,"correct":26},"阶梯浇筑",{"id":170,"libraryId":5,"type":15,"typeLabel":16,"stem":171,"options":172,"answer":24,"analysis":33},1150724,"碾压混凝土的振动压实指标VC值在（ ）范围时，其强度随VC值的增大而提高。",[173,175,177,179],{"key":20,"text":174,"correct":26},"小于30s",{"key":24,"text":176,"correct":22},"小于40s",{"key":28,"text":178,"correct":26},"等于40s",{"key":31,"text":180,"correct":26},"大于40s",{"id":182,"libraryId":5,"type":15,"typeLabel":16,"stem":183,"options":184,"answer":24,"analysis":33},1150725,"碾压混凝土坝施工中，压实质检至少每（ ）h一次。",[185,186,187,188],{"key":20,"text":134,"correct":26},{"key":24,"text":136,"correct":22},{"key":28,"text":138,"correct":26},{"key":31,"text":140,"correct":26},{"id":190,"libraryId":5,"type":15,"typeLabel":16,"stem":191,"options":192,"answer":20,"analysis":33},1150726,"为了便于常态混凝土与碾压混凝土在浇筑时层面能同步上升，应对常态混凝土掺加（ ）。",[193,195,197,199],{"key":20,"text":194,"correct":22},"高效缓凝剂",{"key":24,"text":196,"correct":26},"高效速凝剂",{"key":28,"text":198,"correct":26},"高效减水剂",{"key":31,"text":200,"correct":26},"大量粉煤灰",{"id":202,"libraryId":5,"type":15,"typeLabel":16,"stem":203,"options":204,"answer":31,"analysis":33},1150727,"相对压实度是评价碾压混凝土压实质量的指标，对于建筑物的外部混凝土相对压实度不得小于（ ）。",[205,207,209,211],{"key":20,"text":206,"correct":26},"95%",{"key":24,"text":208,"correct":26},"96%",{"key":28,"text":210,"correct":26},"97%",{"key":31,"text":212,"correct":22},"98%",{"id":214,"libraryId":5,"type":15,"typeLabel":16,"stem":215,"options":216,"answer":20,"analysis":33},1150728,"在碾压混凝土坝施工时，卸料、平仓、碾压中的质量控制，主要应保证（ ）。",[217,219,221,223],{"key":20,"text":218,"correct":22},"层间结合良好",{"key":24,"text":220,"correct":26},"卸料、铺料厚度要均匀",{"key":28,"text":222,"correct":26},"入仓混凝土及时摊铺和碾压",{"key":31,"text":224,"correct":26},"防止骨料分离和拌合料过干",{"id":226,"libraryId":5,"type":15,"typeLabel":16,"stem":227,"options":228,"answer":24,"analysis":33},1150729,"集料分层堆料时，卸料落差应保持在（ ）m以内。",[229,230,231,232],{"key":20,"text":134,"correct":26},{"key":24,"text":136,"correct":22},{"key":28,"text":138,"correct":26},{"key":31,"text":140,"correct":26},{"id":234,"libraryId":5,"type":15,"typeLabel":16,"stem":235,"options":236,"answer":31,"analysis":33},1150730,"为防止碾压混凝土浇筑层顶面出现裂缝，通常采用的方法是（ ）。",[237,239,241,243],{"key":20,"text":238,"correct":26},"延长层间养护时间",{"key":24,"text":240,"correct":26},"缩短层间养护时间",{"key":28,"text":242,"correct":26},"延长层间间歇时间",{"key":31,"text":244,"correct":22},"缩短层间间歇时间",{"id":246,"libraryId":5,"type":15,"typeLabel":16,"stem":247,"options":248,"answer":24,"analysis":33},1150731,"在碾压过程中，振动碾压（ ）遍后，混凝土表面有明显灰浆泌出，表面平整、润湿、光滑，碾滚前后有弹性起伏现象，则表明混凝土料干湿适度。",[249,251,253,255],{"key":20,"text":250,"correct":26},"2～3",{"key":24,"text":252,"correct":22},"3～4",{"key":28,"text":254,"correct":26},"4～5",{"key":31,"text":256,"correct":26},"5～6",{"id":258,"libraryId":5,"type":15,"typeLabel":16,"stem":259,"options":260,"answer":24,"analysis":33},1150732,"碾压混凝土坝的施工工艺程序一般为入仓、平仓、（ ）。",[261,263,265,267],{"key":20,"text":262,"correct":26},"切缝、振动碾压、无振碾压",{"key":24,"text":264,"correct":22},"振动碾压、切缝、无振碾压",{"key":28,"text":266,"correct":26},"无振碾压、切缝、振动碾压",{"key":31,"text":268,"correct":26},"振动碾压、无振碾压、切缝",{"id":270,"libraryId":5,"type":15,"typeLabel":16,"stem":271,"options":272,"answer":28,"analysis":33},1150734,"碾压混凝土坝采用的筑坝材料为（ ）混凝土。",[273,275,277,279],{"key":20,"text":274,"correct":26},"高强",{"key":24,"text":276,"correct":26},"普通",{"key":28,"text":278,"correct":22},"干贫",{"key":31,"text":280,"correct":26},"低强",{"id":282,"libraryId":5,"type":15,"typeLabel":16,"stem":283,"options":284,"answer":28,"analysis":33},1150735,"堤基清理范围包括（ ）。",[285,287,289,291],{"key":20,"text":286,"correct":26},"堤身及压载的基面",{"key":24,"text":288,"correct":26},"堤身及铺盖的基面",{"key":28,"text":290,"correct":22},"堤身、压载及铺盖的基面",{"key":31,"text":292,"correct":26},"堤身、压载、铺盖及填塘的基面",{"id":294,"libraryId":5,"type":15,"typeLabel":16,"stem":295,"options":296,"answer":31,"analysis":33},1150736,"在堤防施工中，堤防横断面上的地面坡度不应陡于（ ）。",[297,299,301,303],{"key":20,"text":298,"correct":26},"1：2",{"key":24,"text":300,"correct":26},"1：3",{"key":28,"text":302,"correct":26},"1：4",{"key":31,"text":304,"correct":22},"1：5",{"id":306,"libraryId":5,"type":15,"typeLabel":16,"stem":307,"options":308,"answer":20,"analysis":33},1150737,"下列关于堤防填筑作业的说法，错误的是（ ）。",[309,311,313,315],{"key":20,"text":310,"correct":22},"地面起伏不平时，应顺坡填筑",{"key":24,"text":312,"correct":26},"堤身两侧设有压载平台，两者应按设计断面同步分层填筑",{"key":28,"text":314,"correct":26},"相邻施工段的作业面宜均衡上升，段间出现高差，应以斜坡面相接",{"key":31,"text":316,"correct":26},"光面碾压的黏性土填料层，在新层铺料前，应作刨毛处理",{"id":318,"libraryId":5,"type":15,"typeLabel":16,"stem":319,"options":320,"answer":28,"analysis":33},1150738,"在堤身铺料作业中，边线超余量机械施工时宜为（ ）cm。",[321,323,325,327],{"key":20,"text":322,"correct":26},"20",{"key":24,"text":324,"correct":26},"10",{"key":28,"text":326,"correct":22},"30",{"key":31,"text":328,"correct":26},"25",{"id":330,"libraryId":5,"type":15,"typeLabel":16,"stem":331,"options":332,"answer":28,"analysis":33},1150739,"在软土堤基上筑堤时，如堤身两侧设有压载平面，两者的填筑顺序为（ ）。",[333,335,337,339],{"key":20,"text":334,"correct":26},"先筑堤身后压载",{"key":24,"text":336,"correct":26},"先筑压载后堤身",{"key":28,"text":338,"correct":22},"两者同步填筑",{"key":31,"text":117,"correct":26},{"id":341,"libraryId":5,"type":15,"typeLabel":16,"stem":342,"options":343,"answer":20,"analysis":33},1150740,"堤防工程中堤身相邻施工段的作业面宜均衡上升，段间出现高差，应以斜坡面相接，结合坡度为（ ）。",[344,346,348,350],{"key":20,"text":345,"correct":22},"1：3～1：5",{"key":24,"text":347,"correct":26},"1：4～1：5",{"key":28,"text":349,"correct":26},"1：2-～1：4",{"key":31,"text":351,"correct":26},"1：4～1：6",{"id":353,"libraryId":5,"type":15,"typeLabel":16,"stem":354,"options":355,"answer":24,"analysis":33},1150741,"堤身填筑采用机械施工，其分段作业面长度应（ ）mo",[356,358,360,362],{"key":20,"text":357,"correct":26},"＜100",{"key":24,"text":359,"correct":22},"≥100",{"key":28,"text":361,"correct":26},"＜50",{"key":31,"text":363,"correct":26},"≥50",{"id":365,"libraryId":5,"type":15,"typeLabel":16,"stem":366,"options":367,"answer":24,"analysis":33},1150742,"在堤身压实作业中，分段、分片碾压的相邻作业面搭接碾压宽度，平行堤轴线方向不应（ ）m。",[368,370,372,374],{"key":20,"text":369,"correct":26},"大于0.5",{"key":24,"text":371,"correct":22},"小于0.5",{"key":28,"text":373,"correct":26},"等于0.5",{"key":31,"text":375,"correct":26},"等于0.3",{"id":377,"libraryId":5,"type":15,"typeLabel":16,"stem":378,"options":379,"answer":24,"analysis":33},1150743,"堤防工程中的堤身用机带碾磙或振动碾压实时，碾迹搭压宽度应大于（ ）cm。",[380,382,383,385],{"key":20,"text":381,"correct":26},"5",{"key":24,"text":324,"correct":22},{"key":28,"text":384,"correct":26},"15",{"key":31,"text":322,"correct":26},{"id":387,"libraryId":5,"type":15,"typeLabel":16,"stem":388,"options":389,"answer":28,"analysis":33},1150744,"在堤身压实作业中，采用振动碾时行走速度应为（ ）km\u002Fh。",[390,392,394,396],{"key":20,"text":391,"correct":26},"≤1",{"key":24,"text":393,"correct":26},"≤1.5",{"key":28,"text":395,"correct":22},"≤2",{"key":31,"text":397,"correct":26},"≤2.5",{"id":399,"libraryId":5,"type":15,"typeLabel":16,"stem":400,"options":401,"answer":28,"analysis":33},1150745,"堤身碾压时必须严格控制土料含水率，土料含水率应控制在最优含水率（ ）范围内。",[402,404,406,408],{"key":20,"text":403,"correct":26},"±1%",{"key":24,"text":405,"correct":26},"±2%",{"key":28,"text":407,"correct":22},"±3%",{"key":31,"text":409,"correct":26},"±5%",{"id":411,"libraryId":5,"type":15,"typeLabel":16,"stem":412,"options":413,"answer":31,"analysis":33},1150746,"在堤防工程中，中细砂压实的洒水量，宜（ ）。",[414,416,418,420],{"key":20,"text":415,"correct":26},"为填筑方量的10%～20%",{"key":24,"text":417,"correct":26},"为填筑方量的20%～30%",{"key":28,"text":419,"correct":26},"为填筑方量的30%～40%",{"key":31,"text":421,"correct":22},"按最优含水量控制",{"id":423,"libraryId":5,"type":15,"typeLabel":16,"stem":424,"options":425,"answer":28,"analysis":33},1150747,"在堤防工程中，砂砾料压实时，洒水量宜为填筑方量的（ ）。",[426,428,430,432],{"key":20,"text":427,"correct":26},"10%～20%",{"key":24,"text":429,"correct":26},"20%～30%",{"key":28,"text":431,"correct":22},"20%～40%",{"key":31,"text":433,"correct":26},"30%～40%",{"id":435,"libraryId":5,"type":15,"typeLabel":16,"stem":436,"options":437,"answer":20,"analysis":33},1150748,"在堤防工程的堤身填筑施工中，碾压行走方向应（ ）。",[438,440,442,444],{"key":20,"text":439,"correct":22},"平行于堤轴线",{"key":24,"text":441,"correct":26},"垂直于堤轴线",{"key":28,"text":443,"correct":26},"平行于堤脚线",{"key":31,"text":445,"correct":26},"垂直于堤脚线",{"id":447,"libraryId":5,"type":15,"typeLabel":16,"stem":448,"options":449,"answer":20,"analysis":33},1150749,"对河床边界条件改变和对近岸水流条件的影响均较小的是（ ）。",[450,452,454,456],{"key":20,"text":451,"correct":22},"坡式护岸",{"key":24,"text":453,"correct":26},"坝式护岸",{"key":28,"text":455,"correct":26},"墙式护岸",{"key":31,"text":457,"correct":26},"顺坝护岸",{"id":459,"libraryId":5,"type":15,"typeLabel":16,"stem":460,"options":461,"answer":24,"analysis":33},1150750,"游荡性河流的护岸多采用（ ）。",[462,463,464,465],{"key":20,"text":451,"correct":26},{"key":24,"text":453,"correct":22},{"key":28,"text":455,"correct":26},{"key":31,"text":466,"correct":26},"平顺护岸",{"id":468,"libraryId":5,"type":15,"typeLabel":16,"stem":469,"options":470,"answer":28,"analysis":33},1150751,"堤防护岸工程中，坡面位于沟岸、河岸，下部可能遭受水流冲刷冲击力强的防护地段，宜采用（ ）。",[471,473,475,477],{"key":20,"text":472,"correct":26},"干砌石护坡",{"key":24,"text":474,"correct":26},"灌砌石护坡",{"key":28,"text":476,"correct":22},"浆砌石护坡",{"key":31,"text":478,"correct":26},"预制混凝土板护坡",{"id":480,"libraryId":5,"type":15,"typeLabel":16,"stem":481,"options":482,"answer":28,"analysis":33},1150752,"干砌石护坡坡面有涌水现象时，应在护坡层下铺设碎石、粗砂成砂砾作为反滤层，其厚度应在（ ）cm以上。",[483,484,485,486],{"key":20,"text":381,"correct":26},{"key":24,"text":324,"correct":26},{"key":28,"text":384,"correct":22},{"key":31,"text":322,"correct":26},{"id":488,"libraryId":5,"type":15,"typeLabel":16,"stem":489,"options":490,"answer":28,"analysis":33},1150753,"在受地形条件或已建建筑物限制的重要堤段，常采用（ ）。",[491,492,493,494],{"key":20,"text":451,"correct":26},{"key":24,"text":453,"correct":26},{"key":28,"text":455,"correct":22},{"key":31,"text":466,"correct":26},{"id":496,"libraryId":5,"type":15,"typeLabel":16,"stem":497,"options":498,"answer":28,"analysis":33},1150754,"在河道狭窄的重要堤段，常采用（ ）。",[499,500,501,502],{"key":20,"text":451,"correct":26},{"key":24,"text":453,"correct":26},{"key":28,"text":455,"correct":22},{"key":31,"text":466,"correct":26},{"id":504,"libraryId":5,"type":15,"typeLabel":16,"stem":505,"options":506,"answer":20,"analysis":33},1150755,"挖泥船分层施工应遵循的原则是（ ）。",[507,509,511,513],{"key":20,"text":508,"correct":22},"上层厚、下层薄",{"key":24,"text":510,"correct":26},"上层薄、下层厚",{"key":28,"text":512,"correct":26},"分层厚度均匀",{"key":31,"text":514,"correct":26},"不作要求",{"id":516,"libraryId":5,"type":15,"typeLabel":16,"stem":517,"options":518,"answer":28,"analysis":33},1150756,"疏浚工程宜采用的开挖方式是（ ）。",[519,521,523,525],{"key":20,"text":520,"correct":26},"横挖法",{"key":24,"text":522,"correct":26},"反挖法",{"key":28,"text":524,"correct":22},"顺流开挖",{"key":31,"text":526,"correct":26},"逆流开挖",{"id":528,"libraryId":5,"type":15,"typeLabel":16,"stem":529,"options":530,"answer":31,"analysis":33},1150757,"吸扬式挖泥船进行吹填工程施工宜采用的开挖方式是（ ）。",[531,532,533,534],{"key":20,"text":520,"correct":26},{"key":24,"text":522,"correct":26},{"key":28,"text":524,"correct":26},{"key":31,"text":526,"correct":22},{"id":536,"libraryId":5,"type":15,"typeLabel":16,"stem":537,"options":538,"answer":20,"analysis":33},1150758,"疏浚工程中水下断面边坡按台阶形开挖时，超欠比应控制在（ ）。",[539,541,543,545],{"key":20,"text":540,"correct":22},"1～1.5",{"key":24,"text":542,"correct":26},"1～2.0",{"key":28,"text":544,"correct":26},"1.5～2.0",{"key":31,"text":546,"correct":26},"1.5～2.5",{"id":548,"libraryId":5,"type":15,"typeLabel":16,"stem":549,"options":550,"answer":20,"analysis":33},1150759,"疏浚工程施工中，项目法人单位委托有资质的第三方检测单位，对完工工程抽样检测应在工程完工后（ ）日内进行。",[551,553,555,557],{"key":20,"text":552,"correct":22},"7",{"key":24,"text":554,"correct":26},"14",{"key":28,"text":556,"correct":26},"21",{"key":31,"text":558,"correct":26},"28",{"id":560,"libraryId":5,"type":15,"typeLabel":16,"stem":561,"options":562,"answer":24,"analysis":33},1150760,"疏浚工程完工后，项目法人应提出验收申请，验收主持单位应在工程完工（ ）日内及时组织验收。",[563,564,565,566],{"key":20,"text":552,"correct":26},{"key":24,"text":554,"correct":22},{"key":28,"text":556,"correct":26},{"key":31,"text":558,"correct":26},{"id":568,"libraryId":5,"type":15,"typeLabel":16,"stem":569,"options":570,"answer":24,"analysis":33},1150761,"疏浚工程施工中，监理单位平行检验测量点数不应少于施工单位检测点数的（ ）。",[571,573,575,577],{"key":20,"text":572,"correct":26},"3%",{"key":24,"text":574,"correct":22},"5%",{"key":28,"text":576,"correct":26},"8%",{"key":31,"text":578,"correct":26},"10%",[580,583,586,589,592,595],{"id":15,"name":581,"category":7,"favorite":582},"领导干部任职前廉政法规知识测试题",92,{"id":584,"name":585,"category":7,"favorite":15},595,"建筑结构与设备",{"id":587,"name":588,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":590,"name":591,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":593,"name":594,"category":7,"favorite":8},534,"BIM工程师",{"id":596,"name":594,"category":7,"favorite":8},535]