[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-803-14":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":596},{"id":5,"name":6,"category":7,"favorite":8},803,"一建水利水电工程实务","建筑工程",0,14,50,1981,[13,34,45,53,65,77,89,98,110,120,132,144,152,164,176,188,200,212,224,234,246,258,270,282,294,306,318,330,342,354,365,377,385,397,409,421,433,445,457,469,481,491,503,515,527,539,551,563,572,584],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},1150659,1,"单选题","能进行挖装作业和集渣、推运、平整等工作的施工机械是（ ）。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","推土机",false,{"key":24,"text":25,"correct":22},"B","正向挖掘机",{"key":27,"text":28,"correct":22},"C","拉铲挖掘机",{"key":30,"text":31,"correct":32},"D","装载机",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},1150660,"具有强力推为装置，能挖各种坚实土和破碎后的岩石的开挖机械是（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":32},"正铲挖掘机",{"key":24,"text":41,"correct":22},"反铲挖掘机",{"key":27,"text":43,"correct":22},"铲运机",{"key":30,"text":28,"correct":22},{"id":46,"libraryId":5,"type":15,"typeLabel":16,"stem":47,"options":48,"answer":24,"analysis":33},1150661,"可用于水下开挖的机械是（ ）。",[49,50,51,52],{"key":20,"text":39,"correct":22},{"key":24,"text":28,"correct":32},{"key":27,"text":31,"correct":22},{"key":30,"text":43,"correct":22},{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":27,"analysis":33},1150662,"某种围岩在采用分部分块开挖时，需先在顶拱处开挖导洞，然后进行顶拱扩大开挖，并及时进行支护，那么这种围岩属于（ ）岩类。",[57,59,61,63],{"key":20,"text":58,"correct":22},"Ⅰ～Ⅱ类",{"key":24,"text":60,"correct":22},"Ⅲ类",{"key":27,"text":62,"correct":32},"Ⅲ～Ⅳ类",{"key":30,"text":64,"correct":22},"Ⅴ类",{"id":66,"libraryId":5,"type":15,"typeLabel":16,"stem":67,"options":68,"answer":24,"analysis":33},1150663,"利用布置在设计开挖轮廓线上的爆破炮孔，获得一个平整的洞室开挖壁面的控制爆破方式是指（ ）。",[69,71,73,75],{"key":20,"text":70,"correct":22},"浅孔爆破法",{"key":24,"text":72,"correct":32},"光面爆破法",{"key":27,"text":74,"correct":22},"洞室爆破法",{"key":30,"text":76,"correct":22},"预裂爆破法",{"id":78,"libraryId":5,"type":15,"typeLabel":16,"stem":79,"options":80,"answer":24,"analysis":33},1150664,"浅孔爆破是指（ ）的钻孔爆破。",[81,83,85,87],{"key":20,"text":82,"correct":22},"孔径小于50mm、深度小于3m",{"key":24,"text":84,"correct":32},"孔径小于75mm、深度小于5m",{"key":27,"text":86,"correct":22},"孔径小于50mm、深度小于7.5m",{"key":30,"text":88,"correct":22},"孔径小于100mm、深度小于10m",{"id":90,"libraryId":5,"type":15,"typeLabel":16,"stem":91,"options":92,"answer":27,"analysis":33},1150665,"石方开挖的爆破方法中，采用集中药包的是（ ）。",[93,94,96,97],{"key":20,"text":70,"correct":22},{"key":24,"text":95,"correct":22},"深孔爆破法",{"key":27,"text":74,"correct":32},{"key":30,"text":76,"correct":22},{"id":99,"libraryId":5,"type":15,"typeLabel":16,"stem":100,"options":101,"answer":24,"analysis":33},1150666,"下列地质条件中，适宜采用开敞式掘进机开挖的是（ ）。",[102,104,106,108],{"key":20,"text":103,"correct":22},"软岩",{"key":24,"text":105,"correct":32},"坚硬岩体",{"key":27,"text":107,"correct":22},"局部土层",{"key":30,"text":109,"correct":22},"完整性较差的岩体",{"id":111,"libraryId":5,"type":15,"typeLabel":16,"stem":112,"options":113,"answer":20,"analysis":33},1150667,"下列地质条件中，适宜采用护盾式掘进机开挖的是（ ）。",[114,115,117,118],{"key":20,"text":103,"correct":32},{"key":24,"text":116,"correct":22},"淤泥",{"key":27,"text":105,"correct":22},{"key":30,"text":119,"correct":22},"中等坚硬的较完整岩体",{"id":121,"libraryId":5,"type":15,"typeLabel":16,"stem":122,"options":123,"answer":27,"analysis":33},1150668,"根据《水利水电工程施工组织设计规范》SL303-2017，适合掘进机施工的洞径范围是（ ）m。",[124,126,128,130],{"key":20,"text":125,"correct":22},"1～5",{"key":24,"text":127,"correct":22},"3～5",{"key":27,"text":129,"correct":32},"3～12",{"key":30,"text":131,"correct":22},"5～15",{"id":133,"libraryId":5,"type":15,"typeLabel":16,"stem":134,"options":135,"answer":24,"analysis":33},1150669,"在天然地层中的锚固方法以（ ）方式为主。",[136,138,140,142],{"key":20,"text":137,"correct":22},"钻孔回填",{"key":24,"text":139,"correct":32},"钻孔灌浆",{"key":27,"text":141,"correct":22},"锚定板",{"key":30,"text":143,"correct":22},"加筋土",{"id":145,"libraryId":5,"type":15,"typeLabel":16,"stem":146,"options":147,"answer":20,"analysis":33},1150670,"可适应各种地形条件，便于控制开挖面的形状和规格的爆破方法是（ ）。",[148,149,150,151],{"key":20,"text":70,"correct":32},{"key":24,"text":95,"correct":22},{"key":27,"text":74,"correct":22},{"key":30,"text":72,"correct":22},{"id":153,"libraryId":5,"type":15,"typeLabel":16,"stem":154,"options":155,"answer":27,"analysis":33},1150672,"土石坝中，1级、2级坝和高坝的压实度应为（ ）。",[156,158,160,162],{"key":20,"text":157,"correct":22},"93%～95%",{"key":24,"text":159,"correct":22},"95%～98%",{"key":27,"text":161,"correct":32},"98%～100%",{"key":30,"text":163,"correct":22},"96%～98%",{"id":165,"libraryId":5,"type":15,"typeLabel":16,"stem":166,"options":167,"answer":24,"analysis":33},1150673,"某土石坝填筑土料的击实最大干密度为1.87g\u002Fcm3，设计压实度为0.98，则设计最大干密度为（ ）g\u002Fcm3。",[168,170,172,174],{"key":20,"text":169,"correct":22},"1.91",{"key":24,"text":171,"correct":32},"1.83",{"key":27,"text":173,"correct":22},"1.87",{"key":30,"text":175,"correct":22},"1.98",{"id":177,"libraryId":5,"type":15,"typeLabel":16,"stem":178,"options":179,"answer":20,"analysis":33},1150674,"土石坝施工中砂的填筑标准的设计控制指标是（ ）。",[180,182,184,186],{"key":20,"text":181,"correct":32},"相对密度",{"key":24,"text":183,"correct":22},"天然密度",{"key":27,"text":185,"correct":22},"干密度",{"key":30,"text":187,"correct":22},"含水量",{"id":189,"libraryId":5,"type":15,"typeLabel":16,"stem":190,"options":191,"answer":27,"analysis":33},1150675,"土石坝填筑施工中，砂的填筑标准应以相对密度为设计控制指标，砂的相对密度不应低于（ ）。",[192,194,196,198],{"key":20,"text":193,"correct":22},"0.5",{"key":24,"text":195,"correct":22},"0.6",{"key":27,"text":197,"correct":32},"0.7",{"key":30,"text":199,"correct":22},"0.8",{"id":201,"libraryId":5,"type":15,"typeLabel":16,"stem":202,"options":203,"answer":20,"analysis":33},1150676,"在确定土石坝土料压实参数的碾压试验中，以单位压实遍数的压实厚度（ ）者为最经济合理。",[204,206,208,210],{"key":20,"text":205,"correct":32},"最大",{"key":24,"text":207,"correct":22},"最小",{"key":27,"text":209,"correct":22},"等于零",{"key":30,"text":211,"correct":22},"无穷小",{"id":213,"libraryId":5,"type":15,"typeLabel":16,"stem":214,"options":215,"answer":27,"analysis":33},1150677,"通常所说的“四通一平”工程是指（ ）。",[216,218,220,222],{"key":20,"text":217,"correct":22},"施工需要的通风、通水、通电、通信和道路平整",{"key":24,"text":219,"correct":22},"施工需要的通风、通水、通信、通路和场地平整",{"key":27,"text":221,"correct":32},"施工需要的通信、通水、通电、通路和场地平整",{"key":30,"text":223,"correct":22},"施工需要的通信、通水、通电、通气和道路平整",{"id":225,"libraryId":5,"type":15,"typeLabel":16,"stem":226,"options":227,"answer":24,"analysis":33},1150678,"某土石坝面碾压施工设计碾压遍数为5遍，碾滚净宽为4m，则错距宽度为（ ）m。",[228,229,230,232],{"key":20,"text":193,"correct":22},{"key":24,"text":199,"correct":32},{"key":27,"text":231,"correct":22},"1.0",{"key":30,"text":233,"correct":22},"1.5",{"id":235,"libraryId":5,"type":15,"typeLabel":16,"stem":236,"options":237,"answer":24,"analysis":33},1150679,"碾压土石坝施工中，具有生产效率高等优点的碾压机械开行方式是（ ）。",[238,240,242,244],{"key":20,"text":239,"correct":22},"进退错距法",{"key":24,"text":241,"correct":32},"圈转套压法",{"key":27,"text":243,"correct":22},"进退平距法",{"key":30,"text":245,"correct":22},"圈转碾压法",{"id":247,"libraryId":5,"type":15,"typeLabel":16,"stem":248,"options":249,"answer":20,"analysis":33},1150680,"在碾压土石坝坝体填筑中，各分段之间的接坡坡比一般应缓于（ ）。",[250,252,254,256],{"key":20,"text":251,"correct":32},"1：3",{"key":24,"text":253,"correct":22},"1：2",{"key":27,"text":255,"correct":22},"1：2.5",{"key":30,"text":257,"correct":22},"1：1",{"id":259,"libraryId":5,"type":15,"typeLabel":16,"stem":260,"options":261,"answer":27,"analysis":33},1150681,"土石坝施工中，当黏性土料含水量偏低时，主要应在（ ）加水。",[262,264,266,268],{"key":20,"text":263,"correct":22},"压实前",{"key":24,"text":265,"correct":22},"运输过程中",{"key":27,"text":267,"correct":32},"料场",{"key":30,"text":269,"correct":22},"压实后",{"id":271,"libraryId":5,"type":15,"typeLabel":16,"stem":272,"options":273,"answer":20,"analysis":33},1150682,"堆石体的干密度一般用（ ）测定。",[274,276,278,280],{"key":20,"text":275,"correct":32},"灌水法",{"key":24,"text":277,"correct":22},"灌砂法",{"key":27,"text":279,"correct":22},"环刀取样",{"key":30,"text":281,"correct":22},"灌浆法",{"id":283,"libraryId":5,"type":15,"typeLabel":16,"stem":284,"options":285,"answer":20,"analysis":33},1150683,"在碾压土石坝坝面作业中，干密度的测定，黏性土一般可用体积为（ ）cm3的环刀测定。",[286,288,290,292],{"key":20,"text":287,"correct":32},"200～500",{"key":24,"text":289,"correct":22},"300～500",{"key":27,"text":291,"correct":22},"200～400",{"key":30,"text":293,"correct":22},"100～300",{"id":295,"libraryId":5,"type":15,"typeLabel":16,"stem":296,"options":297,"answer":24,"analysis":33},1150684,"土坝的堆石级配的质量检查应（ ）。",[298,300,302,304],{"key":20,"text":299,"correct":22},"随机取样",{"key":24,"text":301,"correct":32},"分层分段取样",{"key":27,"text":303,"correct":22},"分层分段后再随机取样",{"key":30,"text":305,"correct":22},"梅花形取样",{"id":307,"libraryId":5,"type":15,"typeLabel":16,"stem":308,"options":309,"answer":27,"analysis":33},1150685,"为保证堆石体的坚固、稳定，面板堆石坝主要部位石料的抗压强度不应低于（ ）MPa。",[310,312,314,316],{"key":20,"text":311,"correct":22},"58",{"key":24,"text":313,"correct":22},"68",{"key":27,"text":315,"correct":32},"78",{"key":30,"text":317,"correct":22},"88",{"id":319,"libraryId":5,"type":15,"typeLabel":16,"stem":320,"options":321,"answer":27,"analysis":33},1150686,"用于面板堆石坝水下部分的石料的软化系数不低于（ ）。",[322,324,326,328],{"key":20,"text":323,"correct":22},"0.65",{"key":24,"text":325,"correct":22},"0.75",{"key":27,"text":327,"correct":32},"0.85",{"key":30,"text":329,"correct":22},"0.95",{"id":331,"libraryId":5,"type":15,"typeLabel":16,"stem":332,"options":333,"answer":27,"analysis":33},1150687,"堆石坝过渡区料粒径、级配应符合垫层料与主堆石料间的反滤要求，压实后应具有低压缩性和高抗剪强度，并具有自由排水性能，级配应连续，最大粒径不宜超过（ ）mm。",[334,336,338,340],{"key":20,"text":335,"correct":22},"100",{"key":24,"text":337,"correct":22},"200",{"key":27,"text":339,"correct":32},"300",{"key":30,"text":341,"correct":22},"400",{"id":343,"libraryId":5,"type":15,"typeLabel":16,"stem":344,"options":345,"answer":30,"analysis":33},1150688,"在面板堆石坝堆石体的填筑工艺中，后退法的主要优点是（ ）。",[346,348,350,352],{"key":20,"text":347,"correct":22},"施工速度快",{"key":24,"text":349,"correct":22},"摊平工作量小",{"key":27,"text":351,"correct":22},"无物料分离现象",{"key":30,"text":353,"correct":32},"轮胎磨损轻",{"id":355,"libraryId":5,"type":15,"typeLabel":16,"stem":356,"options":357,"answer":27,"analysis":33},1150689,"堆石坝坝料压实质量检查，应采用碾压参数和干密度（孔隙率）等参数控制，以控制（ ）为主。",[358,359,361,363],{"key":20,"text":185,"correct":22},{"key":24,"text":360,"correct":22},"孔隙率",{"key":27,"text":362,"correct":32},"碾压参数",{"key":30,"text":364,"correct":22},"密实度",{"id":366,"libraryId":5,"type":15,"typeLabel":16,"stem":367,"options":368,"answer":27,"analysis":33},1150690,"堆石坝过渡料压实检查，试坑直径为最大粒径的（ ）倍，试坑深度为碾压层厚。",[369,371,373,375],{"key":20,"text":370,"correct":22},"1～2",{"key":24,"text":372,"correct":22},"2～3",{"key":27,"text":374,"correct":32},"3～4",{"key":30,"text":376,"correct":22},"4～5",{"id":378,"libraryId":5,"type":15,"typeLabel":16,"stem":379,"options":380,"answer":24,"analysis":33},1150691,"面板堆石坝坝料压实检验时，堆石料试坑的直径为坝料最大粒径的（ ）倍。",[381,382,383,384],{"key":20,"text":370,"correct":22},{"key":24,"text":372,"correct":32},{"key":27,"text":374,"correct":22},{"key":30,"text":376,"correct":22},{"id":386,"libraryId":5,"type":15,"typeLabel":16,"stem":387,"options":388,"answer":27,"analysis":33},1150692,"混凝土面板堆石坝面板中部受压区垂直缝的间距为（ ）m。",[389,391,393,395],{"key":20,"text":390,"correct":22},"5～8",{"key":24,"text":392,"correct":22},"8～10",{"key":27,"text":394,"correct":32},"12～18",{"key":30,"text":396,"correct":22},"20～30",{"id":398,"libraryId":5,"type":15,"typeLabel":16,"stem":399,"options":400,"answer":30,"analysis":33},1150693,"混凝土面板宜采用单层双向钢筋，钢筋宜置于面板截面（ ）。",[401,403,405,407],{"key":20,"text":402,"correct":22},"边缘部位",{"key":24,"text":404,"correct":22},"上部",{"key":27,"text":406,"correct":22},"下部",{"key":30,"text":408,"correct":32},"中部",{"id":410,"libraryId":5,"type":15,"typeLabel":16,"stem":411,"options":412,"answer":24,"analysis":33},1150694,"混凝土面板垂直缝砂浆条铺设的施工程序正确的是（ ）。",[413,415,417,419],{"key":20,"text":414,"correct":22},"先铺止水，再铺砂浆，架立侧模",{"key":24,"text":416,"correct":32},"先铺砂浆，再铺止水，架立侧模",{"key":27,"text":418,"correct":22},"架立侧模，再铺止水，铺砂浆",{"key":30,"text":420,"correct":22},"架立侧模，再铺砂浆，铺止水",{"id":422,"libraryId":5,"type":15,"typeLabel":16,"stem":423,"options":424,"answer":20,"analysis":33},1150695,"面板接缝中，铜止水带的连接宜采用对缝焊接或搭接焊接，焊缝处的抗拉强度不应小于母材抗拉强度的（ ）。",[425,427,429,431],{"key":20,"text":426,"correct":32},"70%",{"key":24,"text":428,"correct":22},"80%",{"key":27,"text":430,"correct":22},"90%",{"key":30,"text":432,"correct":22},"100%",{"id":434,"libraryId":5,"type":15,"typeLabel":16,"stem":435,"options":436,"answer":24,"analysis":33},1150697,"装料鼓筒不旋转，固定在轴上的叶片旋转带动混凝土骨料进行拌合的机械为（ ）拌合机。",[437,439,441,443],{"key":20,"text":438,"correct":22},"自落式",{"key":24,"text":440,"correct":32},"强制式",{"key":27,"text":442,"correct":22},"鼓筒式",{"key":30,"text":444,"correct":22},"双锥式",{"id":446,"libraryId":5,"type":15,"typeLabel":16,"stem":447,"options":448,"answer":24,"analysis":33},1150698,"拌合楼按工艺流程分层布置，分为进料、贮料、配料、拌合及出料共五层，其中（ ）是全楼的控制中心。",[449,451,453,455],{"key":20,"text":450,"correct":22},"进料层",{"key":24,"text":452,"correct":32},"配料层",{"key":27,"text":454,"correct":22},"贮料层",{"key":30,"text":456,"correct":22},"拌合层",{"id":458,"libraryId":5,"type":15,"typeLabel":16,"stem":459,"options":460,"answer":24,"analysis":33},1150699,"下列不属于混凝土入仓铺料方法的是（ ）。",[461,463,465,467],{"key":20,"text":462,"correct":22},"斜层浇筑法",{"key":24,"text":464,"correct":32},"薄层浇筑法",{"key":27,"text":466,"correct":22},"平铺法",{"key":30,"text":468,"correct":22},"台阶法",{"id":470,"libraryId":5,"type":15,"typeLabel":16,"stem":471,"options":472,"answer":24,"analysis":33},1150700,"混凝土入仓铺料采用斜层浇筑法时，斜层坡度不超过（ ）。",[473,475,477,479],{"key":20,"text":474,"correct":22},"5°",{"key":24,"text":476,"correct":32},"10°",{"key":27,"text":478,"correct":22},"15°",{"key":30,"text":480,"correct":22},"20°",{"id":482,"libraryId":5,"type":15,"typeLabel":16,"stem":483,"options":484,"answer":24,"analysis":33},1150701,"混凝土入仓铺料采用斜层浇筑法时，浇筑块高度一般限制在（ ）m左右。",[485,486,487,489],{"key":20,"text":231,"correct":22},{"key":24,"text":233,"correct":32},{"key":27,"text":488,"correct":22},"2.0",{"key":30,"text":490,"correct":22},"2.5",{"id":492,"libraryId":5,"type":15,"typeLabel":16,"stem":493,"options":494,"answer":27,"analysis":33},1150702,"塑性混凝土应在浇筑完毕后（ ）开始洒水养护。",[495,497,499,501],{"key":20,"text":496,"correct":22},"24h后",{"key":24,"text":498,"correct":22},"立即",{"key":27,"text":500,"correct":32},"6～18h内",{"key":30,"text":502,"correct":22},"3d后",{"id":504,"libraryId":5,"type":15,"typeLabel":16,"stem":505,"options":506,"answer":20,"analysis":33},1150703,"低塑性混凝土宜在浇筑完毕后立即进行（ ）养护。",[507,509,511,513],{"key":20,"text":508,"correct":32},"喷雾",{"key":24,"text":510,"correct":22},"洒水",{"key":27,"text":512,"correct":22},"覆盖",{"key":30,"text":514,"correct":22},"化学剂",{"id":516,"libraryId":5,"type":15,"typeLabel":16,"stem":517,"options":518,"answer":27,"analysis":33},1150704,"《水工混凝土施工规范》DL\u002FT5144-2014规定，混凝土的养护时间不宜少于（ ）d。",[519,521,523,525],{"key":20,"text":520,"correct":22},"14",{"key":24,"text":522,"correct":22},"21",{"key":27,"text":524,"correct":32},"28",{"key":30,"text":526,"correct":22},"35",{"id":528,"libraryId":5,"type":15,"typeLabel":16,"stem":529,"options":530,"answer":27,"analysis":33},1150705,"在大体积混凝土结构中产生裂缝的主要原因是由于混凝土（ ）不足。",[531,533,535,537],{"key":20,"text":532,"correct":22},"抗剪强度",{"key":24,"text":534,"correct":22},"抗压强度",{"key":27,"text":536,"correct":32},"抗拉强度",{"key":30,"text":538,"correct":22},"抗弯刚度",{"id":540,"libraryId":5,"type":15,"typeLabel":16,"stem":541,"options":542,"answer":20,"analysis":33},1150706,"多用于起伏的基础部位或特殊的异形结构的模板是（ ）。",[543,545,547,549],{"key":20,"text":544,"correct":32},"固定式",{"key":24,"text":546,"correct":22},"拆移式",{"key":27,"text":548,"correct":22},"移动式",{"key":30,"text":550,"correct":22},"滑升式",{"id":552,"libraryId":5,"type":15,"typeLabel":16,"stem":553,"options":554,"answer":20,"analysis":33},1150707,"一般标准木模板的重复利用次数即周转率为（ ）次。",[555,557,559,561],{"key":20,"text":556,"correct":32},"5～10",{"key":24,"text":558,"correct":22},"10～15",{"key":27,"text":560,"correct":22},"15～20",{"key":30,"text":562,"correct":22},"20～25",{"id":564,"libraryId":5,"type":15,"typeLabel":16,"stem":565,"options":566,"answer":30,"analysis":33},1150708,"一般钢木混合模板的周转率为（ ）次。",[567,568,569,570],{"key":20,"text":556,"correct":22},{"key":24,"text":558,"correct":22},{"key":27,"text":396,"correct":22},{"key":30,"text":571,"correct":32},"30～50",{"id":573,"libraryId":5,"type":15,"typeLabel":16,"stem":574,"options":575,"answer":24,"analysis":33},1150709,"滑升模板上滑时，要求新浇混凝土达到初凝，并至少具有（ ）Pa的强度。",[576,578,580,582],{"key":20,"text":577,"correct":22},"15×10^6",{"key":24,"text":579,"correct":32},"1.5×10^5",{"key":27,"text":581,"correct":22},"2.5×10^5",{"key":30,"text":583,"correct":22},"2.5×10^6",{"id":585,"libraryId":5,"type":15,"typeLabel":16,"stem":586,"options":587,"answer":30,"analysis":33},1150710,"对于大体积混凝土浇筑块，模板安装成型后的偏差，不应超过模板安装允许偏差的（ ）。",[588,590,592,594],{"key":20,"text":589,"correct":22},"10%～30%",{"key":24,"text":591,"correct":22},"30%～50%",{"key":27,"text":593,"correct":22},"50%～80%",{"key":30,"text":595,"correct":32},"50%～100%",[597,600,603,606,609,612],{"id":15,"name":598,"category":7,"favorite":599},"领导干部任职前廉政法规知识测试题",92,{"id":601,"name":602,"category":7,"favorite":15},595,"建筑结构与设备",{"id":604,"name":605,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":607,"name":608,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":610,"name":611,"category":7,"favorite":8},534,"BIM工程师",{"id":613,"name":611,"category":7,"favorite":8},535]