[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-803-12":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":565},{"id":5,"name":6,"category":7,"favorite":8},803,"一建水利水电工程实务","建筑工程",0,12,50,1981,[13,34,46,58,70,82,94,106,118,130,142,154,162,170,178,190,199,211,221,229,241,253,265,277,285,294,303,311,320,332,344,356,366,378,390,402,414,426,436,448,460,471,479,488,496,508,520,530,542,554],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},1150558,1,"单选题","我国通常采用()代替大地水准面作为高程基准面。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","平均地面高程",false,{"key":24,"text":25,"correct":22},"B","平均高潮位",{"key":27,"text":28,"correct":22},"C","平均低潮位",{"key":30,"text":31,"correct":32},"D","平均海水面",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},1150559,"我国现行的高程起算的统一基准是()。",[38,40,42,44],{"key":20,"text":39,"correct":22},"1956年黄海高程系",{"key":24,"text":41,"correct":32},"1985年国家高程基准",{"key":27,"text":43,"correct":22},"废黄河高程系",{"key":30,"text":45,"correct":22},"1985年黄海高程系",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":27,"analysis":33},1150560,"对于高程放样中误差要求不大于±10mm的部位，应采用()。",[50,52,54,56],{"key":20,"text":51,"correct":22},"视距法",{"key":24,"text":53,"correct":22},"直角交会法",{"key":27,"text":55,"correct":32},"水准测量法",{"key":30,"text":57,"correct":22},"解析三角高程法",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":20,"analysis":33},1150561,"采用经纬仪代替水准仪进行土建工程放样时，放样点离高程控制点不得大于()m。",[62,64,66,68],{"key":20,"text":63,"correct":32},"50",{"key":24,"text":65,"correct":22},"100",{"key":27,"text":67,"correct":22},"150",{"key":30,"text":69,"correct":22},"200",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":27,"analysis":33},1150562,"光电测距仪的照准误差（相位不均匀误差）、偏调误差（三轴平行性）及加常数、乘常数，一般()进行一次检验。",[74,76,78,80],{"key":20,"text":75,"correct":22},"每月",{"key":24,"text":77,"correct":22},"每半年",{"key":27,"text":79,"correct":32},"每年",{"key":30,"text":81,"correct":22},"每次使用前",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":20,"analysis":33},1150563,"对于混凝土重力坝溢流面高程放样的精度，一般应()。",[86,88,90,92],{"key":20,"text":87,"correct":32},"与平面位置放样的精度相一致",{"key":24,"text":89,"correct":22},"大于平面位置放样的精度",{"key":27,"text":91,"correct":22},"小于平面位置放样的精度",{"key":30,"text":93,"correct":22},"要求较低，主要防止粗差的发生",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":27,"analysis":33},1150564,"两次独立测量同一区域的开挖工程量其差值小于5%（岩石）和7%（土方）时，可取()作为最后值。",[98,100,102,104],{"key":20,"text":99,"correct":22},"大值",{"key":24,"text":101,"correct":22},"小值",{"key":27,"text":103,"correct":32},"中数",{"key":30,"text":105,"correct":22},"均方差值",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":20,"analysis":33},1150565,"填筑工程量测算时，独立两次对同一工程量测算体积之差，在小于该体积的()时，可取中数作为最后值。",[110,112,114,116],{"key":20,"text":111,"correct":32},"3%",{"key":24,"text":113,"correct":22},"4%",{"key":27,"text":115,"correct":22},"5%",{"key":30,"text":117,"correct":22},"6%",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":27,"analysis":33},1150566,"《水利水电工程等级划分及洪水标准》SL252-2017规定，水利水电工程根据其工程规模、效益以及在国民经济中的重要性，划分为()等。",[122,124,126,128],{"key":20,"text":123,"correct":22},"三",{"key":24,"text":125,"correct":22},"四",{"key":27,"text":127,"correct":32},"五",{"key":30,"text":129,"correct":22},"六",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":24,"analysis":33},1150567,"某堤防工程，其保护对象的防洪标准为50年，该堤防工程级别为()级。",[134,136,138,140],{"key":20,"text":135,"correct":22},"1",{"key":24,"text":137,"correct":32},"2",{"key":27,"text":139,"correct":22},"3",{"key":30,"text":141,"correct":22},"4",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":24,"analysis":33},1150568,"独立立项的拦河水闸的工程等别，应根据()确定。",[146,148,150,152],{"key":20,"text":147,"correct":22},"工程效益",{"key":24,"text":149,"correct":32},"承担的工程任务和规模",{"key":27,"text":151,"correct":22},"防洪标准",{"key":30,"text":153,"correct":22},"灌溉面积",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":20,"analysis":33},1150569,"水利水电工程的永久性次要建筑物的级别，划分为()级。",[158,159,160,161],{"key":20,"text":123,"correct":32},{"key":24,"text":125,"correct":22},{"key":27,"text":127,"correct":22},{"key":30,"text":129,"correct":22},{"id":163,"libraryId":5,"type":15,"typeLabel":16,"stem":164,"options":165,"answer":27,"analysis":33},1150570,"水利水电工程的永久性主要建筑物的级别，划分为()级。",[166,167,168,169],{"key":20,"text":123,"correct":22},{"key":24,"text":125,"correct":22},{"key":27,"text":127,"correct":32},{"key":30,"text":129,"correct":22},{"id":171,"libraryId":5,"type":15,"typeLabel":16,"stem":172,"options":173,"answer":20,"analysis":33},1150571,"某水库工程等别为Ⅱ等，其大坝最大高度为205m，该水库大坝建筑物的级别应为()级。",[174,175,176,177],{"key":20,"text":135,"correct":32},{"key":24,"text":137,"correct":22},{"key":27,"text":139,"correct":22},{"key":30,"text":141,"correct":22},{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":24,"analysis":33},1150572,"当平原、滨海地区的水利水电工程其永久性水工建筑物的挡水高度高于()m，且上下游水头差大于()m时，其洪水标准宜按山区、丘陵地区标准确定。",[182,184,186,188],{"key":20,"text":183,"correct":22},"10、5",{"key":24,"text":185,"correct":32},"15、10",{"key":27,"text":187,"correct":22},"20、15",{"key":30,"text":189,"correct":22},"25、15",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":27,"analysis":33},1150573,"某库容10亿m3的水库大坝的施工临时围堰，围堰高55m，施工期防洪库容8×10^7m3，使用年限3年。该临时围堰的级别应为()。",[194,195,196,197],{"key":20,"text":137,"correct":22},{"key":24,"text":139,"correct":22},{"key":27,"text":141,"correct":32},{"key":30,"text":198,"correct":22},"5",{"id":200,"libraryId":5,"type":15,"typeLabel":16,"stem":201,"options":202,"answer":27,"analysis":33},1150574,"根据《水利水电工程等级划分及洪水标准》SL252-2017，某土石坝施工中，汛前达到拦洪度汛高程（超过围堰顶高程），相应库容为5000万m3，坝体施工期临时度汛的洪水标准为()年。",[203,205,207,209],{"key":20,"text":204,"correct":22},"20～10",{"key":24,"text":206,"correct":22},"50～20",{"key":27,"text":208,"correct":32},"100～50",{"key":30,"text":210,"correct":22},"≥100",{"id":212,"libraryId":5,"type":15,"typeLabel":16,"stem":213,"options":214,"answer":27,"analysis":33},1150575,"根据《水利水电工程等级划分及洪水标准》SL252-2017，新建混凝土坝工程，大坝级别为2级，导流洞封堵后，如永久泄洪建筑物尚未具备设计泄洪能力，该坝体校核洪水标准为()年。",[215,216,217,219],{"key":20,"text":206,"correct":22},{"key":24,"text":208,"correct":22},{"key":27,"text":218,"correct":32},"200～100",{"key":30,"text":220,"correct":22},"500～200",{"id":222,"libraryId":5,"type":15,"typeLabel":16,"stem":223,"options":224,"answer":24,"analysis":33},1150576,"根据《水利水电工程等级划分及洪水标准》SL252-2017，新建混凝土坝工程，大坝级别为2级，导流洞封堵后，如永久泄洪建筑物尚未具备设计泄洪能力，该坝体设计洪水标准为()年。",[225,226,227,228],{"key":20,"text":206,"correct":22},{"key":24,"text":208,"correct":32},{"key":27,"text":218,"correct":22},{"key":30,"text":220,"correct":22},{"id":230,"libraryId":5,"type":15,"typeLabel":16,"stem":231,"options":232,"answer":24,"analysis":33},1150577,"根据山区、丘陵地区永久性水工建筑物洪水标准要求，对一级混凝土坝，在校核情况下的洪水重现期为( )年。",[233,235,237,239],{"key":20,"text":234,"correct":22},"10000～5000",{"key":24,"text":236,"correct":32},"5000～2000",{"key":27,"text":238,"correct":22},"5000～1000",{"key":30,"text":240,"correct":22},"2000～1000",{"id":242,"libraryId":5,"type":15,"typeLabel":16,"stem":243,"options":244,"answer":20,"analysis":33},1150578,"工程抗震设防类别为()类的水工建筑物，可根据其遭受强震影响的危害性，在基本烈度基础上提高1度作为设计烈度。",[245,247,249,251],{"key":20,"text":246,"correct":32},"甲",{"key":24,"text":248,"correct":22},"乙",{"key":27,"text":250,"correct":22},"丙",{"key":30,"text":252,"correct":22},"丁",{"id":254,"libraryId":5,"type":15,"typeLabel":16,"stem":255,"options":256,"answer":20,"analysis":33},1150579,"正常蓄水位至死水位之间的水库容积，称为()。",[257,259,261,263],{"key":20,"text":258,"correct":32},"兴利库容",{"key":24,"text":260,"correct":22},"死库容",{"key":27,"text":262,"correct":22},"防洪库容",{"key":30,"text":264,"correct":22},"调洪库容",{"id":266,"libraryId":5,"type":15,"typeLabel":16,"stem":267,"options":268,"answer":20,"analysis":33},1150580,"水库在汛期允许兴利的上限水位，也是水库防洪运用时的起调水位，称为()。",[269,271,273,275],{"key":20,"text":270,"correct":32},"防洪限制水位",{"key":24,"text":272,"correct":22},"设计洪水位",{"key":27,"text":274,"correct":22},"正常高水位",{"key":30,"text":276,"correct":22},"防洪高水位",{"id":278,"libraryId":5,"type":15,"typeLabel":16,"stem":279,"options":280,"answer":24,"analysis":33},1150581,"水库遇大坝的设计洪水时在坝前达到的最高水位，称为()。",[281,282,283,284],{"key":20,"text":270,"correct":22},{"key":24,"text":272,"correct":32},{"key":27,"text":274,"correct":22},{"key":30,"text":276,"correct":22},{"id":286,"libraryId":5,"type":15,"typeLabel":16,"stem":287,"options":288,"answer":20,"analysis":33},1150582,"水库在非常运用校核情况下允许临时达到的最高洪水位称为()。",[289,291,292,293],{"key":20,"text":290,"correct":32},"校核洪水位",{"key":24,"text":272,"correct":22},{"key":27,"text":276,"correct":22},{"key":30,"text":270,"correct":22},{"id":295,"libraryId":5,"type":15,"typeLabel":16,"stem":296,"options":297,"answer":30,"analysis":33},1150583,"校核洪水位至防洪汛限水位之间的水库静库容，称为()。",[298,300,301,302],{"key":20,"text":299,"correct":22},"总库容",{"key":24,"text":260,"correct":22},{"key":27,"text":262,"correct":22},{"key":30,"text":264,"correct":32},{"id":304,"libraryId":5,"type":15,"typeLabel":16,"stem":305,"options":306,"answer":27,"analysis":33},1150584,"防洪高水位至防洪限制水位之间的水库容积叫做()。",[307,308,309,310],{"key":20,"text":299,"correct":22},{"key":24,"text":260,"correct":22},{"key":27,"text":262,"correct":32},{"key":30,"text":264,"correct":22},{"id":312,"libraryId":5,"type":15,"typeLabel":16,"stem":313,"options":314,"answer":24,"analysis":33},1150585,"正常蓄水位至防洪限制水位之间汛期用于蓄洪、非汛期用于兴利的水库库容称为()。",[315,316,318,319],{"key":20,"text":258,"correct":22},{"key":24,"text":317,"correct":32},"共用库容",{"key":27,"text":264,"correct":22},{"key":30,"text":262,"correct":22},{"id":321,"libraryId":5,"type":15,"typeLabel":16,"stem":322,"options":323,"answer":27,"analysis":33},1150586,"用以改善河流的水流条件，调整河流水流对河床及河岸的作用以及为防护水库、湖泊中的波浪和水流对岸坡冲刷的建筑物称为()。",[324,326,328,330],{"key":20,"text":325,"correct":22},"泄水建筑物",{"key":24,"text":327,"correct":22},"输水建筑物",{"key":27,"text":329,"correct":32},"整治建筑物",{"key":30,"text":331,"correct":22},"取水建筑物",{"id":333,"libraryId":5,"type":15,"typeLabel":16,"stem":334,"options":335,"answer":20,"analysis":33},1150587,"结构自重和永久设备自重、土压力等属于()。",[336,338,340,342],{"key":20,"text":337,"correct":32},"永久作用荷载",{"key":24,"text":339,"correct":22},"可变作用荷载",{"key":27,"text":341,"correct":22},"偶然作用荷载",{"key":30,"text":343,"correct":22},"临时作用荷载",{"id":345,"libraryId":5,"type":15,"typeLabel":16,"stem":346,"options":347,"answer":24,"analysis":33},1150588,"以下属于水工建筑物永久作用荷载的是()。",[348,350,352,354],{"key":20,"text":349,"correct":22},"地震作用荷载",{"key":24,"text":351,"correct":32},"预应力",{"key":27,"text":353,"correct":22},"静水压力",{"key":30,"text":355,"correct":22},"扬压力",{"id":357,"libraryId":5,"type":15,"typeLabel":16,"stem":358,"options":359,"answer":30,"analysis":33},1150589,"以下属于水工建筑物可变作用荷载的是()。",[360,362,364,365],{"key":20,"text":361,"correct":22},"结构自重",{"key":24,"text":363,"correct":22},"地应力",{"key":27,"text":351,"correct":22},{"key":30,"text":355,"correct":32},{"id":367,"libraryId":5,"type":15,"typeLabel":16,"stem":368,"options":369,"answer":30,"analysis":33},1150590,"根据大坝的结构特点相设计要求，为达到选取恰当的防渗措施和校验建筑物在渗流作用下是否安全的目的，不一定都进行()的计算。",[370,372,374,376],{"key":20,"text":371,"correct":22},"确定渗透压力和渗透力",{"key":24,"text":373,"correct":22},"确定渗透坡降（或流速）",{"key":27,"text":375,"correct":22},"确定渗流量",{"key":30,"text":377,"correct":32},"确定浸润线位置",{"id":379,"libraryId":5,"type":15,"typeLabel":16,"stem":380,"options":381,"answer":30,"analysis":33},1150591,"只能在空气中硬化，并保持或继续提高其强度，属于这类材料的是()。",[382,384,386,388],{"key":20,"text":383,"correct":22},"硅酸盐水泥",{"key":24,"text":385,"correct":22},"普通硅酸盐水泥",{"key":27,"text":387,"correct":22},"硅酸盐大坝水泥",{"key":30,"text":389,"correct":32},"石灰",{"id":391,"libraryId":5,"type":15,"typeLabel":16,"stem":392,"options":393,"answer":30,"analysis":33},1150592,"下列属于硬木材的是()。",[394,396,398,400],{"key":20,"text":395,"correct":22},"松",{"key":24,"text":397,"correct":22},"柏",{"key":27,"text":399,"correct":22},"杉",{"key":30,"text":401,"correct":32},"槐",{"id":403,"libraryId":5,"type":15,"typeLabel":16,"stem":404,"options":405,"answer":24,"analysis":33},1150593,"均质土坝的土料是砂质黏土和壤土，要求其应具有一定的抗渗性和强度，其黏粒含量一般为()。",[406,408,410,412],{"key":20,"text":407,"correct":22},"5%～10%",{"key":24,"text":409,"correct":32},"10%～30%",{"key":27,"text":411,"correct":22},"5%～20%",{"key":30,"text":413,"correct":22},"20%～40%",{"id":415,"libraryId":5,"type":15,"typeLabel":16,"stem":416,"options":417,"answer":30,"analysis":33},1150594,"下列关于建筑材料应用的说法正确的是()。",[418,420,422,424],{"key":20,"text":419,"correct":22},"用于护坡的石料的吸水率应不小于0.8",{"key":24,"text":421,"correct":22},"花岗岩的耐久性好于闪长岩",{"key":27,"text":423,"correct":22},"所有砂岩均具有遇水软化的特性，因此不能用于水中建筑物",{"key":30,"text":425,"correct":32},"位于地下部位的混凝土可以选用矿渣硅酸盐水泥",{"id":427,"libraryId":5,"type":15,"typeLabel":16,"stem":428,"options":429,"answer":30,"analysis":33},1150595,"水位变动区域的外部混凝土、溢流面受水流冲刷部位的混凝土，避免采用()。",[430,431,432,434],{"key":20,"text":385,"correct":22},{"key":24,"text":387,"correct":22},{"key":27,"text":433,"correct":22},"抗硫酸盐硅酸盐水泥",{"key":30,"text":435,"correct":32},"火山灰质硅酸盐水泥",{"id":437,"libraryId":5,"type":15,"typeLabel":16,"stem":438,"options":439,"answer":20,"analysis":33},1150596,"新拌砂浆的流动性、保水性分别用()表示。",[440,442,444,446],{"key":20,"text":441,"correct":32},"沉入度、分层度",{"key":24,"text":443,"correct":22},"坍落度、分层度",{"key":27,"text":445,"correct":22},"坍落度、沉入度",{"key":30,"text":447,"correct":22},"沉入度、坍落度",{"id":449,"libraryId":5,"type":15,"typeLabel":16,"stem":450,"options":451,"answer":20,"analysis":33},1150597,"硅酸盐水泥初凝时间不得早于()min。",[452,454,456,458],{"key":20,"text":453,"correct":32},"45",{"key":24,"text":455,"correct":22},"40",{"key":27,"text":457,"correct":22},"30",{"key":30,"text":459,"correct":22},"25",{"id":461,"libraryId":5,"type":15,"typeLabel":16,"stem":462,"options":463,"answer":27,"analysis":33},1150598,"下列属于特性水泥的是()。",[464,466,468,470],{"key":20,"text":465,"correct":22},"低热水泥",{"key":24,"text":467,"correct":22},"复合硅酸盐水泥",{"key":27,"text":469,"correct":32},"快硬硅酸盐水泥",{"key":30,"text":435,"correct":22},{"id":472,"libraryId":5,"type":15,"typeLabel":16,"stem":473,"options":474,"answer":27,"analysis":33},1150599,"有抗冻要求的混凝土且环境水兼硫酸盐侵蚀时，应优先选用的水泥品种是()。",[475,476,477,478],{"key":20,"text":385,"correct":22},{"key":24,"text":387,"correct":22},{"key":27,"text":433,"correct":32},{"key":30,"text":383,"correct":22},{"id":480,"libraryId":5,"type":15,"typeLabel":16,"stem":481,"options":482,"answer":24,"analysis":33},1150600,"快硬水泥存储时间超过()个月，应复试其各项指标，并按复试结果使用。",[483,485,486,487],{"key":20,"text":484,"correct":22},"0.5",{"key":24,"text":135,"correct":32},{"key":27,"text":137,"correct":22},{"key":30,"text":139,"correct":22},{"id":489,"libraryId":5,"type":15,"typeLabel":16,"stem":490,"options":491,"answer":30,"analysis":33},1150601,"除快硬水泥以外，其他水泥存储超过()个月应复试其各项指标，并按复试结果使用。",[492,493,494,495],{"key":20,"text":484,"correct":22},{"key":24,"text":135,"correct":22},{"key":27,"text":137,"correct":22},{"key":30,"text":139,"correct":32},{"id":497,"libraryId":5,"type":15,"typeLabel":16,"stem":498,"options":499,"answer":20,"analysis":33},1150602,"混凝土拌合物的和易性包括（)等几个方面。",[500,502,504,506],{"key":20,"text":501,"correct":32},"流动性、黏聚性和保水性",{"key":24,"text":503,"correct":22},"流动性和保水性",{"key":27,"text":505,"correct":22},"流动性和黏聚性",{"key":30,"text":507,"correct":22},"黏聚性和保水性",{"id":509,"libraryId":5,"type":15,"typeLabel":16,"stem":510,"options":511,"answer":20,"analysis":33},1150603,"混凝土立方体抗压强度试件的标准养护温度为()。",[512,514,516,518],{"key":20,"text":513,"correct":32},"20℃±2℃",{"key":24,"text":515,"correct":22},"20℃±3℃",{"key":27,"text":517,"correct":22},"20℃±4℃",{"key":30,"text":519,"correct":22},"20℃±5℃",{"id":521,"libraryId":5,"type":15,"typeLabel":16,"stem":522,"options":523,"answer":24,"analysis":33},1150604,"混凝土的抗冻性是指混凝土在饱和状态下，经多次冻融循环作用而不严重降低强度的性能，其抗压强度下降不超过25%，质量损失不超过()。",[524,525,526,528],{"key":20,"text":111,"correct":22},{"key":24,"text":115,"correct":32},{"key":27,"text":527,"correct":22},"7%",{"key":30,"text":529,"correct":22},"9%",{"id":531,"libraryId":5,"type":15,"typeLabel":16,"stem":532,"options":533,"answer":27,"analysis":33},1150605,"粗骨料的最大粒径不应超过钢筋净间距的()。",[534,536,538,540],{"key":20,"text":535,"correct":22},"1\u002F4",{"key":24,"text":537,"correct":22},"1\u002F2",{"key":27,"text":539,"correct":32},"2\u002F3",{"key":30,"text":541,"correct":22},"1倍",{"id":543,"libraryId":5,"type":15,"typeLabel":16,"stem":544,"options":545,"answer":20,"analysis":33},1150606,"混凝土的细骨料是指粒径在()mm乏间的骨料。",[546,548,550,552],{"key":20,"text":547,"correct":32},"0.16～5.0",{"key":24,"text":549,"correct":22},"0.5～7.5",{"key":27,"text":551,"correct":22},"5.0～10.0",{"key":30,"text":553,"correct":22},"10.0～20.0",{"id":555,"libraryId":5,"type":15,"typeLabel":16,"stem":556,"options":557,"answer":20,"analysis":33},1150607,"混凝土粗骨料是指粒径大于()mm的骨料。",[558,559,561,563],{"key":20,"text":198,"correct":32},{"key":24,"text":560,"correct":22},"10",{"key":27,"text":562,"correct":22},"15",{"key":30,"text":564,"correct":22},"20",[566,569,572,575,578,581],{"id":15,"name":567,"category":7,"favorite":568},"领导干部任职前廉政法规知识测试题",92,{"id":570,"name":571,"category":7,"favorite":15},595,"建筑结构与设备",{"id":573,"name":574,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":576,"name":577,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":579,"name":580,"category":7,"favorite":8},534,"BIM工程师",{"id":582,"name":580,"category":7,"favorite":8},535]