[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1151919":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1151919,803,2,"多选题","根据《水电工程设计概算费用标准》（2013年版），其他直接费包括（ ）等。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","冬雨期施工增加费",true,{"key":16,"text":17,"correct":14},"B","特殊地区施工增加费",{"key":19,"text":20,"correct":14},"C","夜间施工增加费",{"key":22,"text":23,"correct":14},"D","安全文明施工措施费",{"key":25,"text":26,"correct":27},"E","施工机械使用赞",false,"ABCD","2020版教材P310 \u002F 2019版教材P309 其他直接费包括冬雨期施工增加费、夜间施工增加费、特殊地区施工增加费、临时设施费、安全生产措施费和其他。",{"id":6,"name":31,"category":32,"favorite":33},"一建水利水电工程实务","建筑工程",0]