[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1151916":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1151916,803,2,"多选题","根据《水利工程工程量清单计价规范》GB50501-2007，工程量清单由（ ）组成。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","分类分项工程量清单",true,{"key":16,"text":17,"correct":14},"B","措施项目清单",{"key":19,"text":20,"correct":14},"C","其他项目清单",{"key":22,"text":23,"correct":24},"D","文明施工项目清单",false,{"key":26,"text":27,"correct":14},"E","零星工作项目清单","ABCE","2020版教材P314 \u002F 2019版教材P313 工程量清单由分类分项工程量清单、措施项目清单、其他项目清单和零星工作项目清单组成。",{"id":6,"name":31,"category":32,"favorite":33},"一建水利水电工程实务","建筑工程",0]