[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1151894":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1151894,803,2,"多选题","工程验收中法人验收包括（ ）。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","分部工程验收",true,{"key":16,"text":17,"correct":14},"B","水电站（泵站）中间机组启动验收",{"key":19,"text":20,"correct":14},"C","单位工程验收",{"key":22,"text":23,"correct":14},"D","合同工程完工验收",{"key":25,"text":26,"correct":27},"E","竣工验收",false,"ABCD","2020版教材P267 \u002F 2019版教材P270 法人验收包括分部工程验收、单位工程验收、水电站（泵站）中间机组启动验收、合同工程完工验收等。",{"id":6,"name":31,"category":32,"favorite":33},"一建水利水电工程实务","建筑工程",0]