[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1151787":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1151787,803,2,"多选题","项目法人（建设单位）应组织（ ）进行设计交底。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","监理单位",false,{"key":16,"text":17,"correct":18},"B","施工单位",true,{"key":20,"text":21,"correct":18},"C","设计单位",{"key":23,"text":24,"correct":14},"D","主管部门",{"key":26,"text":27,"correct":14},"E","质量监督部门","BC","2020版教材P211 \u002F 2019版教材P214 项目法人应组织设计和施工单位进行设计交底。",{"id":6,"name":31,"category":32,"favorite":33},"一建水利水电工程实务","建筑工程",0]