[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1151759":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1151759,803,2,"多选题","根据《水利建设质量工作考核办法》，对建设项目质量监督管理工作主要考核（ ）情况。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","质量监督计划",true,{"key":16,"text":17,"correct":14},"B","参建单位质量行为监督检查",{"key":19,"text":20,"correct":14},"C","工程实体质量检查",{"key":22,"text":23,"correct":24},"D","项目划分",false,{"key":26,"text":27,"correct":14},"E","工程质量核备","ABCE","2020版教材P219 \u002F 2019版教材P222 涉及建设项目质量监督管理工作主要考核以下内容：（1）质量监督计划。（2）参建单位质量行为和实体质量检查。（3）工程质量核备",{"id":6,"name":31,"category":32,"favorite":33},"一建水利水电工程实务","建筑工程",0]