[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1151678":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1151678,803,2,"多选题","根据《水利工程建设项目管理规定（试行）》（水建[1995]128号），下列建设程序属前期工作的有（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","初步设计",true,{"key":16,"text":17,"correct":18},"B","招标设计",false,{"key":20,"text":21,"correct":18},"C","施工准备",{"key":23,"text":24,"correct":18},"D","生产准备",{"key":26,"text":27,"correct":14},"E","项目建议书","AE","2020版教材P146 \u002F 2019版教材P148 根据水利部《水利工程建设项目管理规定（试行）》（水建[1995]128号）和有关规定，水利工程建设项目的实施，必须执行工程建设程序。一般情况下，项目建议书、可行性研究报告、初步设计称为前期工作。",{"id":6,"name":31,"category":32,"favorite":33},"一建水利水电工程实务","建筑工程",0]