[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1151564":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1151564,803,2,"多选题","碾压土石坝坝面作业施工程序包括（ ）、质检等工序。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","覆盖层清除",false,{"key":16,"text":17,"correct":18},"B","铺料",true,{"key":20,"text":21,"correct":18},"C","整平",{"key":23,"text":24,"correct":18},"D","洒水",{"key":26,"text":27,"correct":18},"E","压实","BCDE","2020版教材P85 \u002F 2019版教材P87 坝面作业施工程序包括铺料、整平、洒水、压实、质检等工序，",{"id":6,"name":31,"category":32,"favorite":33},"一建水利水电工程实务","建筑工程",0]