[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1151526":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1151526,803,2,"多选题","防止土体发生流土渗透变形的工程措施主要有()。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","铺设碎石垫层",false,{"key":16,"text":17,"correct":18},"B","设置垂直防渗体",true,{"key":20,"text":21,"correct":18},"C","增加出口处盖重",{"key":23,"text":24,"correct":18},"D","设置排水沟或减压井",{"key":26,"text":27,"correct":18},"E","设置水平防渗体","BCDE","2020\u002F2019教材P45 防止渗透变形的工程措施中的第二类处理措施：第二类处理措施中，最可靠的方法是在渗透土层中兴建防渗墙，截断土层中的渗透水流，降低渗透坡降，同时增加渗流出口处土体抵抗渗透变形的能力，从而消除产生渗透变形的前提条件。具体工程措施为： ( 1 ) 设置水平与垂直防渗体，增加渗径的长度，降低渗透坡降或截阻渗流。 ( 2 ) 设置排水沟或减压井，以降低下游渗流口处的渗透压力，并且有计划地排除渗水。 ( 3 ) 对有可能发生管涌的地段，应铺、设反滤层，拦截可能被渗流带走的细小颗粒。 ( 4 ) 对有可能产生流土的地段，则应增加渗流出口处的盖重^3盖重与保护层之间也应铺设反滤层。",{"id":6,"name":31,"category":32,"favorite":33},"一建水利水电工程实务","建筑工程",0]