[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1151495":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1151495,803,2,"多选题","临时性水工建筑物的级别应根据()确定。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","作用",false,{"key":16,"text":17,"correct":18},"B","保护对象的重要性",true,{"key":20,"text":21,"correct":18},"C","失事造成的后果",{"key":23,"text":24,"correct":18},"D","使用年限",{"key":26,"text":27,"correct":18},"E","临时性水工建筑物规模","BCDE","2020\u002F2019教材P15 临时性水工建筑物级别水利水电工程施工期使用的临时性挡水和泄水建筑物的级別，应根据保护对象的重要性、失事造成的后果、使用年限和临时建筑物的规模确定。",{"id":6,"name":31,"category":32,"favorite":33},"一建水利水电工程实务","建筑工程",0]