[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1151473":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1151473,803,2,"多选题","下列关于投标报价表填写的说法，正确的有（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","未写入招标文件工程量清单中但必须发生的工程项目，投标人可根据具体情况增加在招标文件工程量清单的最下行",false,{"key":16,"text":17,"correct":18},"B","工程量清单中的工程单价是完成工程量清单中一个质量合格的规定计量单位项目所需的直接费、间接费、企业利润和税金",true,{"key":20,"text":21,"correct":18},"C","投标总价应按工程项目总价表合计金额填写",{"key":23,"text":24,"correct":18},"D","分类分项工程量清单计价表中应填写相应项目的单价和合价",{"key":26,"text":27,"correct":14},"E","零星工作项目清单计价表应填写相应项目单价和合价","BCD","A：未写入招标文件工程量清单中但必须发生的工程项目，需要招标人增加；E：零星工作项目清单计价表应填写相应项目单价。",{"id":6,"name":31,"category":32,"favorite":33},"一建水利水电工程实务","建筑工程",0]