[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1151396":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1151396,803,2,"多选题","混凝土坝的混凝土铺料间隔时间主要受混凝土（ ）的限制。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","终凝时间",false,{"key":16,"text":17,"correct":18},"B","初凝时间",true,{"key":20,"text":21,"correct":18},"C","温控要求",{"key":23,"text":24,"correct":14},"D","运输能力",{"key":26,"text":27,"correct":14},"E","浇筑能力","BC","混凝土允许间隔时间，按照混凝土初凝时间和混凝土温控要求两者中较小值确定。",{"id":6,"name":31,"category":32,"favorite":33},"一建水利水电工程实务","建筑工程",0]