[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1151378":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1151378,803,2,"多选题","基坑排水技术中，初期排水应考虑的因素有（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","施工弃水量",false,{"key":16,"text":17,"correct":18},"B","围堰渗水量",true,{"key":20,"text":21,"correct":18},"C","堰身含水量",{"key":23,"text":24,"correct":18},"D","基坑积水量",{"key":26,"text":27,"correct":18},"E","可能的降水量","BCDE","本题考查的是基坑排水技术。初期排水总量应按围堰闭气后的基坑积水量、抽水过程中围堰及地基渗水量、堰身及基坑覆盖层中的含水量，以及可能的降水量等组成计算。",{"id":6,"name":31,"category":32,"favorite":33},"一建水利水电工程实务","建筑工程",0]