[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1151369":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1151369,803,2,"多选题","（2011年）根据《水土保持法》，生产建设项目中的水土保持设施应当与主体工程同时（）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","设计",true,{"key":16,"text":17,"correct":18},"B","批复",false,{"key":20,"text":21,"correct":14},"C","施工",{"key":23,"text":24,"correct":18},"D","验收",{"key":26,"text":27,"correct":14},"E","投产使用","ACE","建设项目中的水土保持设施，必须与主体工程同时设计、同时施工、同时投产使用。",{"id":6,"name":31,"category":32,"favorite":33},"一建水利水电工程实务","建筑工程",0]