[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1151334":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1151334,803,2,"多选题","（2016年）下列水利工程建设程序中，立项过程包括（ ）阶段。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","项目规划",false,{"key":16,"text":17,"correct":18},"B","项目建议书",true,{"key":20,"text":21,"correct":18},"C","可行性研究报告",{"key":23,"text":24,"correct":14},"D","初步设计",{"key":26,"text":27,"correct":14},"E","招标设计","BC","水利工程建设项目的立项过程（手续）包括项目建议书和可行性研究报告阶段。 项目建议书、可行性研究报告、初步设计由水行政主管部门或项目法人组织编制。",{"id":6,"name":31,"category":32,"favorite":33},"一建水利水电工程实务","建筑工程",0]