[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1151310":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1151310,803,2,"多选题","(2016年)检测混凝土面板堆石坝垫层料压实干密度，可采用（）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","环刀法",false,{"key":16,"text":17,"correct":18},"B","灌水法",true,{"key":20,"text":21,"correct":18},"C","灌砂法",{"key":23,"text":24,"correct":14},"D","蜡封法",{"key":26,"text":27,"correct":18},"E","核子密度仪法","BCE","垫层料、过渡料和堆石料压实干密度检测方法，宜采用挖坑灌水（砂）法，或辅以其他成熟的方法。垫层料也可用核子密度仪法。 试坑深度为碾压层厚。",{"id":6,"name":31,"category":32,"favorite":33},"一建水利水电工程实务","建筑工程",0]