[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1151298":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1151298,803,2,"多选题","（2017年）基坑排水技术中，初期排水应考虑的因素有（ ）",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","施工弃水量",false,{"key":16,"text":17,"correct":18},"B","围堰渗水量",true,{"key":20,"text":21,"correct":18},"C","堰身含水量",{"key":23,"text":24,"correct":18},"D","基坑积水量",{"key":26,"text":27,"correct":18},"E","可能的降水量","BCDE","",{"id":6,"name":31,"category":32,"favorite":33},"一建水利水电工程实务","建筑工程",0]