[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1151268":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1151268,803,1,"单选题","根据《水工建筑物地下开挖工程施工规范》SL378-2007，下列关于水利水电工程土石方开挖施工的说法，错误的是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","特大断面洞室采用先拱后墙法施工时，拱脚下部的岩体开挖，拱顶混凝土衬砌强度不应低于设计强度的75%",false,{"key":16,"text":17,"correct":18},"B","特大断面隧洞采用先拱后墙法施工时，拱脚线的最低点至下部开挖面的距离，不宜小于1.2m",true,{"key":20,"text":21,"correct":14},"C","洞口削坡应自上而下进行，严禁上下垂直作业",{"key":23,"text":24,"correct":14},"D","竖井或斜井单向自下而上开挖，距离贯通5m时，应自上而下贯通","2020版教材P394 \u002F 2019版教材P393 5.5.5当特大断面洞室设有拱座，采用先拱后墙法开挖时，应注意保护和加固拱座岩体。拱脚下部的岩体开挖，应符合下列条件：1拱脚下部开挖面至拱脚线最低点的距离不应小于1.5m。2顶拱混凝土衬砌强度不应低于设计强度的75%。",{"id":6,"name":27,"category":28,"favorite":29},"一建水利水电工程实务","建筑工程",0]