[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1151267":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1151267,803,1,"单选题","根据《水工建筑物滑动模板施工技术规范》SI 32-2014，滑模安装施工中，当滑模安装高度达到或超过（ ）m时，对安装人员必须采取高空作业保护措施。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","1.0",false,{"key":16,"text":17,"correct":14},"B","1.5",{"key":19,"text":20,"correct":21},"C","2.0",true,{"key":23,"text":24,"correct":14},"D","3.0","2020版教材P396 \u002F 2019版教材P395 7.1.4所有滑模安装都应符合下列规定：4当滑模安装髙度达到或超过2.0m时，对安装人员必须采取髙空作业保护措施。",{"id":6,"name":27,"category":28,"favorite":29},"一建水利水电工程实务","建筑工程",0]