[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1151260":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1151260,803,1,"单选题","建设单位应当根据安置地区的环境容量和可持续发展的原则，因地制宜，编制移民安置规划，经依法批准后，由（ ）组织实施。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","有关地方人民政府",true,{"key":16,"text":17,"correct":18},"B","各级水行政主管部门",false,{"key":20,"text":21,"correct":18},"C","省级人民政府",{"key":23,"text":24,"correct":18},"D","流域管理机构","2020版教材P381 \u002F 2019版教材P380 移民安置应当与工程建设同步进行。建设单位应当根据安置地区的环境容量和可持续发展的原则，因地制宜，编制移民安置规划，经依法批准后，由有关地方人民政府组织实施。所需移民经费列入工程建设投资计划。”这为《条例》的制定提供了主要依据。",{"id":6,"name":27,"category":28,"favorite":29},"一建水利水电工程实务","建筑工程",0]