[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1151257":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1151257,803,1,"单选题","大中型水利工程移民安置达到阶段性目标和移民安置工作完毕后，至少应由（ ）组织有关单位进行验收。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","乡（镇）级以上人民政府",false,{"key":16,"text":17,"correct":14},"B","县级以上人民政府",{"key":19,"text":20,"correct":14},"C","市级以上人民政府",{"key":22,"text":23,"correct":24},"D","省级人民政府或者国务院移民管理机构",true,"2020版教材P383 \u002F 2019版教材P382 为了加强移民安置工作以及建设工程的监督管理和验收，《条例》第三十七条规定：“移民安置达到阶段性目标和移民安置工作完毕后，省、自治区、直辖市人民政府或者国务院移民管理机构应当组织有关单位进行验收；移民安置未经验收或者验收不合格的，不得对大中型水利水电工程进行阶段性验收和竣工验收。”",{"id":6,"name":27,"category":28,"favorite":29},"一建水利水电工程实务","建筑工程",0]