[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1151256":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1151256,803,1,"单选题","项目法人应当根据大中型水利水电工程建设的要求和移民安置规划，在每年汛期结束后（ ）日内，向与其签订移民安置协议的地方人民政府提出下年度移民安置计划建议。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","60",true,{"key":16,"text":17,"correct":18},"B","50",false,{"key":20,"text":21,"correct":18},"C","40",{"key":23,"text":24,"correct":18},"D","30","2020版教材P383 \u002F 2019版教材P382 在每年汛期结束后60日内，向与其签订移民安置协议的地方人民政府提出下年度移民安置计划建议",{"id":6,"name":27,"category":28,"favorite":29},"一建水利水电工程实务","建筑工程",0]