[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1151197":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1151197,803,1,"单选题","工程价款支付属合同履行过程的（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","最终支付",false,{"key":16,"text":17,"correct":18},"B","中期支付",true,{"key":20,"text":21,"correct":14},"C","计日工支付",{"key":23,"text":24,"correct":14},"D","预付款支付","2020版教材P332 \u002F 2019版教材P331 工程价款的支付。工程价款支付属合同履行过程的中期支付，按月进行。",{"id":6,"name":27,"category":28,"favorite":29},"一建水利水电工程实务","建筑工程",0]