[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1151191":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1151191,803,1,"单选题","分包项目的施工措施计划必须报（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","总承包单位",false,{"key":16,"text":17,"correct":14},"B","建设单位",{"key":19,"text":20,"correct":14},"C","质量监督机构",{"key":22,"text":23,"correct":24},"D","监理机构",true,"2020版教材P333 \u002F 2019版教材P332 水力发电工程监理合同商务管理的内容分包管理。分包项目的施工措施计划、开工申报、工程质量检验、工程变更以及合同支付等，通过承建单位向监理机构申报。",{"id":6,"name":27,"category":28,"favorite":29},"一建水利水电工程实务","建筑工程",0]