[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1151178":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1151178,803,1,"单选题","签发进场通知、审批开工申请是施工监理（ ）阶段的工作内容。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","施工准备",false,{"key":16,"text":17,"correct":14},"B","施工计划",{"key":19,"text":20,"correct":21},"C","施工实施",true,{"key":23,"text":24,"correct":14},"D","项目审批","2020版教材P329 \u002F 2019版教材P328 根据有关规范和规定，水利工程建设项目施工监理实施阶段监理工作的基本内容有：1、开工条件的控制，包括签发开工通知、分部工程开工、单元工程开工、混凝土浇筑开仓。",{"id":6,"name":27,"category":28,"favorite":29},"一建水利水电工程实务","建筑工程",0]