[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1151157":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1151157,803,1,"单选题","为完成工程项目施工，发生于该工程项目施工前和施工过程中招标人不要求列明工程量的项目为（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","措施项目",true,{"key":16,"text":17,"correct":18},"B","零星工作项目",false,{"key":20,"text":21,"correct":18},"C","分类分项工程项目",{"key":23,"text":24,"correct":18},"D","其他项目","2020版教材P314 \u002F 2019版教材P313 工程量清单计价规范措施项目的基本概念。措施项目指为完成工程项目施工，发生于该工程项目施工前和施工过程中招标人不要求列明工程量的项目。",{"id":6,"name":27,"category":28,"favorite":29},"一建水利水电工程实务","建筑工程",0]